POST DEFENSIVE WATER COMPLEX
Beijing - THE EXPANDING CITY
ACIENT BEIJING CITY
SECOND RING ROAD
THIRD RING ROAD
RIVER SYSTEM
LAKE Culvert Main River Secondary River
ANCIENT CITY WALL AND MOAT
1400s-1965 Stands for 530 years
PROJECT LOCATION
ACIENT BEIJING CITY SITE
SECOND RING ROAD
THIRD RING ROAD
SURROUNDING CONER TORWER
HIGH WAY TRAIN
RESIDENTIAL
URBAN VILLAGE
STRATEGY
Highway
Moat
Suken Car Road
Highway
Suken Car Road
Water Landscape
Moat
STRATEGY
CHINESE TRADITIONAL GARDEN
WATER PLATFORM BRIDGE PAVILION
lower level platform
safe pathway when flood
flooding situation
facade of the north bank - connect with corner tower
1.NEIGHBOURHOOD DAYLIGHTING STREAM
1
2
2. UNDERPASS WATERWAY
SECTION FROM NEIGHBOURHOOD TO THE MOAT
3. OUTDOOR BATHING - TOWARD THE CONER WALL
3
4. INDOOR BATHING
4
5. UPPER LEVEL OF BATHHOUSE
5
LIBRARY - FIREST FLOOR PLAN
6.BRIDGE
6
7. BATHING POOL ON THE NORTH BANK SIDE
GROUND FLOOR PLAN
7
8. POOL ON THE RIVER & SAUNA HOUSE
8
8. SWIMMING AFTER FLOOD
9
Highway
Suken Car Road
Water Landscape
Moat
SECTION PARALLEL WITH THE MOAT