B.Arch Feng Chia University Candidate for Architecture Design program
Why do we have a mind if not to get our way
Education Born
1996/3
St. Viator Catholic High school Junior high school
2007
St. Viator Catholic High school Senior high school
2010
Experience 1996/3 Born
2010/7
Volunteer service at Nei-Hu Elementry school Date : 2010/7/12 - 2010/7/16
2015/7
Home stay in Gunma , Japan Date : 2015/7/16 - 2015/8/5
Roger Lai
2016
Competition of Wu-Tso Elementry school book house design Final grade : TOP 24
Pursuer of Architecture
2017/7
Learning away from home program - Vienna Date : 2017/6/24 - 2017/7/13
2017/7
Internship in Heish Hsiang-Wei Architecture Studio Date : 2017/7/20 - 2017/9/1
2017/9
Student Association of Architecture Department Minister of Spatial Department Date : 2017/9 - 2018/6
Feng Chia University Department of Urban Planning and Spatial Information Major : Urban Planning Feng Chia University School of Architecture Major : Architecture
Contact Mobile : +886 - 932822685 Email :
maluan850317@gmail.com
Software skills Autodesk
2014
Language Mandarin Chinese
AutoCad Revit
Adobe Address : No.5 ,Sec.1,Changping Rd, Beitun Dist, Taichung City, Taiwan (R.O.C)
2013
Photoshop illustrator Indesign
Modeling Rhino Grasshopper Archicad
Interest Film photography Book reading
English
Motorcycle riding Leatherworking
Japanese
Dedicated to my parents
Contents 01 Pavilion Design Reading Hutt
02 Pavilion Design Cave Shelter
03 Architecture project Bauhaus Modernism House
04 Architecture project Module Street House
05 Architecture project Duxing Street Old House Reconstruction
06 Other Works
01 Pavilion Design Reading plan
Portfolio
2016
Model
Perspective
Reading Plan Project : Competition of book house design Project : Duration 6 weeks Advisor : Yen-Liang Lin Years : 2016 . 11 This '' Book House '' is the No.6 book house develope by Feng Chia University , the purpose is to narrow the gap between cities and countrysides . Both light structure system and Modularization make the book house easier to build and allow the public to take part in the project , providing the students a space for reading .
Introdution This book house is built for the students in Wu-Tso Elementry School .The site was chosen to be located on the empty lawn in the school which is located besides the Taichung Airport , which means the problem of the noise should be considered . Moreover , the size of this place is narrow , which means the scale of the project would be tiny but complex functionality .
Solution Book house should provide the space for student after the school time . Therefore the complex functionality become the most important program in the competition . So how to balance between different function in this tiny site , and what do they need . These are questions that should be considered in the competition.
Serpentine Gallery ,Sou Fujimoto Pavilion , Climbing , Light
Portfolio
2016
Concept
Portfolio
2016
Perspective
02 Pavilion Design Cave Shelter
Portfolio
2017
Model
Perspective
Cave shelter Project : Living pod design Project : Duration 4 weeks Advisor : Cheng-Hsuan Wu Years : 2017 . 9
Introdution
After the Industrial Revolution in 1760 , the rising of sulfur dioxide in the atmosphere , it threaten human's daily life , and start to ruin the structures , and building on the ground .However , it seems to be more important to think about the representation of the architecture .The concept of a humanity , and nature should be thought into the new design .
Due to the progressive of air pollution and the rise of sulfur dioxide in the atomsphere . Designer should rethink the living space in the future . Moreover , human retreat their living space into the cave , to defend the acid rain , and reconnect the social relationships rather than redesigning a whole new architecture .
Solution Stalactites , the natural timeline recording the track of time and also the stucture in the cave .Meanwhile,stalacties benefits from acid rain to grow but it's also the result of human pollution .So I try to extend the image of stalacties , and started the design of the shelter .
Stalactites Timeline , Natural , Cave
Portfolio
2017
Concept
Condition of Taiwan 2016 rain pH distributed
2004-2016 SO-24 wet desposition
2004-2016 NO3 wet desposition TRANSPORTATION 5% INDUSTRIAL SOURCE 9%
OTHER 1%
FUEL COMBUSTION 19%
Form Finding
ELECTRIC POWER STATIONS 67%
Material Exploded Stalactites type
Traditional shelter type
Traditional tent type (Stalagmite type)
Facade
Screen Window Floor
Function LIGHT
LIGHT
Framework WIND WIND
LIGHT WIND
Site SLEEPING AREA
Portfolio
REST SPACE
2017
ENTRANCE & DRESSING AREA
Diagram
Process of shelter assembly
Shelter connection 1
1 UNIT: METER
1
SHELTER 2
ENTRANCE DRESSING AREA MAIN SPACE
SHOWER TOILET
SINGLE UNIT
Entrance Framework
Sleeping area Framework
PUBLIC SPACE ADJUSTMENT SPACE
DOUBLE UNIT
FACING SAME SIDE
SOCIAL UNIT CIRCULATION
Rest area Framework
Portfolio
Structure System
2017
Diagram
Portfolio
2017
Perspective
03 Architecture project Bauhaus Modernism House
Portfolio
2017
Model
Perspective
Bauhaus Modernism House Project : Project : Advisor : Years :
Virtual residential design
Duration 6 weeks Chih-Feng Peng 2017
Introdution
As part of the 1929 International Exposition in Barcelona Spain, the Barcelona Pavilion,designed by Mies van der Rohe, was the display of architecture's modern movement to the world.Originally named the German Pavilion,the pavilion was the face of Germany after WWI, emulating the nation’s progressively modern culture that was still rooted in its classical history. Its elegant and sleek design combined with rich natural material presented Mies’ Barcelona Pavilion as a bridge into his future career, as well as architectural modernism.
The pavilion’s design is based on a formulaic grid system developed by Mies that not only serves as the patterning of the travertine pavers, but it also serves as an underlying framework that the wall systems work within . Based on the grid system , I insert the Abstract Painting '' Delicate Tension '' a painting by Wassily Kandisky , locate the blue block on the painting to the Pavilion's pool . Add another ortho system to the plan ,and split the plan into different height .
Solution Researching the icon of Tado Ando , and different elements he handle in his project . Most of the icon emphasize the different ortho system , the impact of different axis , transfer to the atomsphere that people 's percept can sense .
Delicate Tension Modernism , Geometry , Icon
Portfolio
2017
Concept
History of Bauhaus
1919
Icon study
Wassily Kandisky
Icon of Tadao Ando
Pharrell system Education
Walter Gropius
Weimar
Abstract Painting research
Artist、Artisan、Industrial obscure Handmake Utopia idea
1922
Born 1866-1944
Form Meister Handwork Meister
Case: Church of the Wind Architect: Tadao Ando Location: Kobe ,Japan Project Year:1986
First recognised purely abstract works Abstract artist,connected at a deeper aesthetic level
Apprenticeship
Wassily Kandinsky
1925 1927
Dessau
Case: Church of the Water Architect: Tadao Ando Location: Hokkaido ,Japan Project Year:1988
Industrial Education
Hannes Meyer Volksbedarf statt Luxusbedarf Political activity intervene
1930
Delicate Tension
1932 Functionalism Form follows Function
Berlin
Point Tension:
Ludwig Mies Van Der Rohe Less is more Bauhaus collapse
Tension of point present in radial
Line Architecture: The space construct by line,analyse all classic architecture , line apply all period spiritual atmosphere .
1933 Chicago
Plane Atmosphere:
Circle ateend to present the condition of motionless,it make the between two different plane,it can highlight the atmosphere of the space.
Portfolio
2017
Concept
Case : Church of the Light Architect: Tadao Ando Location: Osaka ,Japan Project Year:1989
Heritage / Modernism Exist element of Barcelona Pavilion
Organize the element of Barcelona Pavilion
Add another ortho system
Add circle icon into the plan of Barcelona Pavilion
Extend the element of Barcelona Pavilion
Graphic / Icon
Portfolio
2017
Diagram
Different ortho system construct the triangle space
7 5
8
9
6
11 10
4
3
2
1
1 Entrance 2 Living room 3 Toilet 4 Living room 5 Dining room 6 Kitchen 7 Main bedroom 8 Living room 9 Bathroom 10 Dressing room 11 Studio
1F Plan A’
B’
B
A
Section A-A'
Portfolio
2017
Plan
1
up
2
4
3
1 2 3 4
Prayer room Studio Swimming pool Bathroom Vertical Circulation
up
B1 Plan
Section B-B'
Portfolio
2017
Plan
Portfolio
2017
Perspective
04 Architecture project Modulor street house
Portfolio
2017
Model
Perspective
Modulor street house Project : Project : Advisor : Years :
Street House on the ramp Duration 6 weeks Chih-Feng Peng 2017
Introdution Site is allocate on the ramp near the brook , the shape of site is long and thick. In Taiwan this kind of site always need to conquer by architect .The consigner is a four
The Modulor is an anthropometric scale of proportions devised by Le Corbusier.It is a long tradition of Vitruvius, Leonardo da Vinci's Vitruvian Man. Developed as a visual bridge between two incompatible scales, the imperial and the metric system.It is based on the height of a man with his arm raised.It was used as a system to set out a number of Le Corbusier's buildings and was later codified into two books.
peoples family , kids are only 10 years old , father is a film photographer work in the architecture studio .
Solution Facing the problem of the site , and the condition we have to face to . Using the idea of Modulor by Le Corbusier ,to solve problem of site and character .
Commemorative Swiss coin Modernism , Modulor , Funtion
Portfolio
2017
Concept
Form Finding
Step1
Step2
3*3 Modulor
Use the 2*2 grid system for the form finding.Start from the section (split into 6 piece)
Portfolio
2017
Start to join the condition from site(tree,wind,track..etc) And extend the structure area.
Diagram
Step4
Step3
Tree area
Vertical circulation
Floor area
Input the human scale into the module. Start from plannig and make the section. And join the vertical circulation.
Portfolio
2017
Tree area
Vertical circulation
Floor area
Make model into scale . Check up the function and the space is logical.
Diagram
scale 1:100
3 1
5
UP
DN
2
DN
4
1 2 3 4 5
Gallery Dining room Kitichen Living room Toilet Vertical Circulation
9
10
6
DN 10
DN
UP
7
DN
8
6 Bedroom 7 Main Bedroom 8 Living room 9 Dressing room 10 Bathroom Vertical Circulation
1F PLAN
West Elevation
South Elevation
Portfolio
2017
16
East Elevation
Plan
DN
DN
15
12
13 DN
2F PLAN
North Elevation
14
11
11 Bedroom 12 Living room 13 Studio 14 Dark room 15 Laundry room 16 Bathroom Vertical Circulation
3F PLAN
Cross Section
Longitudinal Section
Portfolio
2017
Perspective
05 Architecture project Duxing street old house reconstruction
Portfolio
2017
Model
Perspective
Duxing street old house reconstruction Project : Old house reconstruction Project : Duration 8 weeks Advisor : Cheng-Hsuan Wu Years : 2017 . 10
Introdution The building of this project is a 4 floors old building which is next to 10 meter one-way street . The design needs to have the co-working space for the artist , and some shops
Taichung center district was the first planned district in Taichung.
.In addition, the facade on the building , is the typical of
Old buildings , old statute of urban planning , benefits of consortium
Taiwanese street house .
, made the district , becoming the most complex and hard to developement place . The issue of Center district has under debate for a long time in Taichung.
Solution The structural system becomes dangerious in these years,in this project , The strategy tackles this issue from the reinforcement of structure system ,and intend to make people perceiving the experience of urban planning axis conflicts in Taichung by using the structure system .
Tower of Babel God , Structure , Artist
Portfolio
2017
Concept
Plane Elements Design
Idea - axis compact North
Atrium rotate 45˚
West-east new urban planning
Beam system rotate 45˚ Floor descend highlight rotated column
urban planning axis impact
old urban planning
Column rotate 45˚
Original system
Space Elements Form Finding Column
+ Original element
+ 45˚ element insert
Atrium
Portfolio
2017
Concept
Diagram
New system
Portfolio
2017
1 FL.
2 FL.
Elevation
Elevation
Plan
3 FL.
4 FL.
B'
A' A
B
Section A-A'
Portfolio
2017
Section B-B'
Plan
Portfolio
2017
Perspective
06 FILM Shooting