EVERYTHING WE DO — FROM 30 FEET BELOW THE GROUND TO 30 FLOORS ABOVE — IS ABOUT PEOPLE. IN OUR 70 YEARS OF BEING IN BUSINESS, WE’VE HAD THE OPPORTUNITY TO WORK CLOSELY WITH OWNERS, DEVELOPERS, GENERAL CONTRACTORS, AND SUBCONTRACTORS TO ENSURE THAT EVERY PROJECT WE COMPLETE IS BUILT BY RELATIONSHIP FIRST.

Form of Ownership: LLC

State of Incorporation: GA

Years in Business: 71 Year Founded 1952

STAFFING & RESOURCES

Each day is an opportunity to establish or strengthen a relationship by demonstrating our commitment to being a valuable partner to Owners, Designers and Subcontractors alike, which allow the team to reach greater goals than ever expected.

BONDING CAPACITY

Reeves Young has the stability and financial strength to provide bonding capacity for large projects. Our current stated bonding capacity is $250 Million for single project limits and $1.2 Billion aggregate. If the need arises, our firm has the ability to provide 100% performance and payment bonds.

Discipline Quantity Senior Leadership 8 Preconstruction 31 Project Managers 74 Superintendents 90 Marketing/HR/Admin/Support 51 Equipment Operators/Field Staff 252 TOTAL 506

WE ARE...

At Reeves Young, it doesn’t matter what business unit you are working with or which member of our team you happen to encounter, we want your experience to be the same –EXTRAORDINARY.

OUR SERVICES

• Design/Build

• Construction Management

• Subcontracting

BUILT BY PASSION

At the heart of our company is a passion to make a profound, positive impact on our co-workers, clients, and community. We strive to cultivate an environment that creates success from the inside out, by supporting our team so they can support our clients.

• General Contracting

• Preconstruction

OUR BUSINESS UNITS

• Industrial

• Commercial Public

• Commercial Private

• Water Resources

• Heavy Civil

OUR REVENUE

2022

$450 Million

2021

$285 Million

2020

$326 Million

2019

BUILT BY PEOPLE

For our people, growth is the only option. We pride ourselves in hiring high performing professionals who thrive in a team environment and matching them with positions where they can excel. The result of this approach is fulfilled employees who bring their best to our clients.

$252 Million

2018

$222 Million

2017

$190 Million

REEVES YOUNG OFFICES:

NASHVILLE

+1 (508) 889.1150

4101 Charlotte Avenue, Suite E205

Nashville, TN 37209

GREENVILLE

+1 (864) 906.7599

201 Riverplace, Suite 300

Greenville, SC 29601

ATLANTA

+1 (770) 271.1159

45 Peachtree Industrial Blvd. NW

Sugar Hill, GA 30518

WHY REEVES YOUNG

When we say our company is built by relationship first, we mean it. We know that no relationship is successful without investment, flexibility, passion, transparency, and reliability.

SELF PERFORMING

We own over 600 pieces of heavy equipment enabling us to self-perform large portions of our projects, which adds a level of reliability for our clients including mitigating owner risk.

TRUSTED ADVISORS

We utilize our 70 years of experience to offer you a project partner you can trust to advise you with straight talk, transparency, and respect.

DIVERSE PROJECTS

We have the depth of talent and resources to provide diverse perspectives to help you meet your unique project needs, with the flexibility of approach to pivot quickly when things change.

OWNERSHIP MENTALITY

We offer our employees the opportunity for ownership in the company ensuring that we are as invested in your projects as you are.

INDUSTRIAL LEADERSHIP

STEPHEN McMILLAN Vice President - Industrial Years

of Experience: 15 Portfolio: $1B+

Stephen is a proven leader providing expertise in all aspects of project management including preconstruction, design-assist, design-build, field and office operations and the commissioning/startup of commercial, industrial, manufacturing and office projects. He has extensive experience in the design and implementation of mechanical systems applications and expertise in heavy industrial, manufacturing, assembly, logistics and office projects. Stephen’s time-tested principles, strategies, tactics, and best-practices deliver successful projects for his clients. Stephen is an owner of Reeves Young with a resulting stake in Client satisfaction.

CHRISTOPHER SMITH Operations Manager

Years of Experience: 16 Portfolio: $750M+

Chris is a results-oriented, hands-on construction and development professional with more than 16 years of experience in all facets of the industry. Specializing in coordinating trades, developing partnerships, and completing industrial projects on time and under budget, Chris will be an asset to your project. His extensive experience working with Owners from concept, through design and budgeting, along with assisting with hard cost and executing construction allows him to consistently deliver successful projects.

RANDY PENLAND Senior Preconstruction Manager

Years of Experience: 20 Portfolio: $1B+

Randy is an accomplished construction professional with more than 20 years of experience in preconstruction and construction management. He is dedicated to delivering successful projects by strategically thinking and collaborating well with others to motivate, mentor, and cultivate high performing teams. His project success is also due to the key relationships established with clients, subcontractors, and vendors.

EDUCATION

B.S. in Civil Engineering from the Georgia Institute of Technology

AFFILIATIONS / CERTIFICATIONS

CPR/First Aid certified Crane Signaling Rigging

Lock-out/Tag Out NAIOP GEDA GAWP ULI 15 years of experience

1B+ Billion $ Portfolio www.reevesyoung.com

STEPHEN MCMILLAN

VICE PRESIDENT

Stephen will be your Main Point of Contact. His proven leadership skills in all aspects of project management including preconstruction, design-assist, designbuild, field and office operations and the commissioning/startup of commercial, industrial, manufacturing and office projects. He has extensive experience in the design and implementation of mechanical systems applications and expertise in heavy industrial, manufacturing, assembly, logistics and office projects. Stephen’s time-tested principles, strategies, tactics and best-practices deliver successful projects for his clients. Stephen is an owner of Reeves Young with a resulting stake in Client satisfaction.

FEATURED PROJECTS

Richmond, VA

Program Manager for this expedited design-build project. Designed specifically for the Phillip Morris USA facility, The WaterHub reduces consumed water by 40% and eliminates 55% of wastewater discharge. Major equipment installation included influent pumps, rotary bar screen, odor control system, EQ/tank/pumps, fine screen, weir gates, membrane system, UV System, RO system, fiberglass reclaim tank with reclaim pumps, and a greenhouse. The overall plant capacity is 710,000 GPM expandable to 1.5 MGD.

"Relationships are everything; they affect the quality of our business as well as our lives. Mutual respect, communication, dependability, serving others- whether laborer, subcontractor or clientcreates long-lasting relationships which allow the team to reach greater goals than ever expected."
Phillip Morris / PMUSA Water Hub Shiloh Eco Park Alpharetta, GA 60,000 SF Corporate Headquarters with manufacturing and assembly plant. Installation of two, 10-ton overhead cranes, dock, roll up doors, and ESFR. Steel frame with Insulated metal panel exterior; elevated concrete deck. $6.8M

PROJECT LIST

Best Friend Road $30M

Douglas Hills $76M

Falcon Parkway Logistics $27M

Falcon Parkway Phase II $33.5M

Rockdale Logistics Center $11.2M

South Fulton Logistics $14M

Braselton Crossroads $20.7M

Discovery Place $6.3M

Covington Commerce Center $12M

Zebra $2.3M

Simple Automation $1.2M

GTA New Operations & Maintenance Facility $21.6M

Strategic North 85 Logistics Center $17.7M

Duncan Reidville $16.9M

GXO $4.7M

Strategic West Phase II $6.3M

Water Tower Global Innovation Hub at Gwinnett $27.3M

PMUSA Waterhub $15M

Augusta Transit Bus Operations and Maintenance Facility $18M

Clear Creek Chemical System Improvements and System-Wide Flow Monitoring $7.2M

Makita $1.8M

The Waterhub at Emory University $6.2M

Midland Logistics Center $18M

GF Linamar- Die-Casting Facility $35M

CDC - South $5M

Liberty Business Center $12M

Shiloh Eco Park $6.8M

Back River WWTP $600M

Wyckoff WTP $80M

South Cobb Pump Station $305M

James E. Quarles WTP Rehab Plant 2 $15M

CHRIS SMITH

INDUSTRIAL OPERATIONS MANAGER

Chris is a results-oriented, hands-on construction and development professional with more than 16 years of experience in all facets of the industry. Specializing in coordinating trades, developing partnerships, and completing industrial projects on time and under budget, Chris will be an asset to your project. His extensive experience working with Owners’ from concept, through design and budgeting, along with assisting with hard cost and executing construction allows him to consistently deliver successful projects.

KeHE

Dallas, TX

EDUCATION

Chris studied Business Management at

16 years of experience

750+ Million $ Portfolio www.reevesyoung.com

This million square feet design assist facility consisted of +/- 400,000 SF of freezer/cooler and +/- 600,00 SF of dry storage and office space. The state-of-the-art shell was constructed out of half tilt panel and half insulated metal panels. Mechanical, Electrical, Plumbing, and Fire Protection were design build on the project. This required extensive coordination between the Alta Refrigeration equipment and the four, 4000 AMP power services to the building along with all the various offices within the facility. The freezer/ cooler portion included ice cream room, protein room, and cold docks with vertical levelers which were built with expansion capabilities in mind. The dry storage of the facility was designed and constructed for tenant’s large pick modules and conveyors.

KeHE

Douglasville, GA

Scope of work includes complete design-build services for a 450,000 sf LEED Certified, build-to-suit distribution facility for the food industry. The building is located on a fully developed 35-acre site to accommodate cross dock loading with 65 truck positions. The main building is constructed of conventional steel framing with load bearing site cast concrete tilt-wall panels, 6” ductilcrete slab and a single ply TPO roof system. The interior of the building includes a 66,000 sf freezer space to -15 degrees Fahrenheit and 37,000 sf of cooler space. The cold storage area is constructed

of insulated metal wall panels and insulated ceiling panels. There are two offices located inside the ambient area of the facility. The main office is 7,200 sf with a combination of open offices, private offices, conference rooms, and locker rooms. The secondary office is 1,400 sf comprised of open office and small restrooms.

$24M

US Cold Storage McDonough, GA

Two-story cold storage facility.

Falcon Parkway Logistics

Flowery Branch, GA

Design-Assist. Class A, 36’ clear height cross dock distribution warehouse constructed utilizing site cast concrete tilt panels. Facility has 7” thick concrete slab on grade with exterior concrete truck aprons at the dock walls. Project required a demolition package of an existing facility, then major rework of the soils on site to re-establish the final grades. $25M; 642,000 SF

Factory Shoals/Berlin Packaging

Lithia Springs, GA

Construction of a new state-of-the-art distribution center. Construction consisted of site clearing and grading, 249,000 SF tilt panel warehouse. This project included full MEP design building that included multiple office build outs, condition warehouse space, and install of elaborate Building Management System. $24M; 249,000 SF

Oak Ridge Distribution Center Orlando,FL

This design assist distribution included demolition of an existing 395,000 SF building and redevelop the site. New construction consist of two separate warehouses totaling 400,000 square feet. This tilt wall construction consisted site work, MEP, and all site concrete paving. $21M; 395,000 SF

Safavieh

Savannah, GA

Class A, 36’ clear height cross dock distribution center constructed utilizing site cast concrete tilt walls. Complete design build project for two separate tenants. Tenant improvements consisted various office build-outs, dock equipment, and state of the art security package. Extensive site work package including surcharge of the building pad created many obstacles to overcome. Use of an on-site concrete batch plant helped get the project across the finish line to meet both tenant’s deadlines. $31M; 500,000 SF

C-13 Nobel House Distribution

Savannah, GA Class A warehouse constructed utilizing site cast concrete tilt panels which included an extensive tenant improvement package. 8K SF office space with dock equipment at every position, and extensive interior lighting package. Tenant occupancy was critical and required extensive planning to expedite the schedule on top of surcharging the building pad. $35M; 750,000 SF

"Trust is the glue of life. It’s the most essential ingredient in effective communication. It’s the foundational principle that holds all relationships.”
Kennesaw State University.
RELEVANT PROJECT EXPERIENCE

$1B+

RANDY PENLAND

SENIOR PRECONSTRUCTION MANAGER

Randy is an accomplished construction professional with more than 20 years of experience in preconstruction and construction management. He is dedicated to delivering successful projects by strategically thinking and collaborating well with others to motivate, mentor, and cultivate high performing teams. His project success is also due to the key relationships established with clients, subcontractors, and vendors.

RELEVANT PROJECT EXPERIENCE

KeHE Dallas, TX

This million square feet design assist facility consisted of +/- 400,000 SF of freezer/cooler and +/- 600,00 SF of dry storage and office space. The state-of-the-art shell was constructed out of half tilt panel and half insulated metal panels. Mechanical, Electrical, Plumbing, and Fire Protection were design build on the project. This required extensive coordination between the Alta Refrigeration equipment and the four, 4000 AMP power services to the building along with all the various offices within the facility. The freezer/ cooler portion included ice cream room, protein room, and cold docks with vertical levelers which were built with expansion capabilities in mind. The dry storage of the facility was designed and constructed for tenant’s large pick modules and conveyors.

SMP Tuscaloosa, AL

The 800,000 square foot, Tier 1 facility, is located in Tuscaloosa, AL, on a 96-acre site with more than 1,000,000 cubic feet (CF) of cut and fill. This project is currently the largest injection molding facility in the US, serving Mercedes-Benz as the main client. Evans had to move 40,000 CF in two days in order for SMP to perform the groundbreaking ceremony. The project consists of five buildings: a production/administrative facility, two guardhouses, a maintenance building, and one utility building. Building construction is a custom fabricated steel structure with metal panels and a Membrane roof system. The production facility has 75,000 sf of office space. There are four levels of office in the main administration area and three levels of office in the paint shop. The 80,000 sf paint shop is a fully automated paint line for all parts manufactured at this facility.

$65M

Festo Mason, OH

Project included light manufacturing and distribution for pneumatic and electric drives for automation and assembly. $24.5M

GF Linamar Fletcher, NC

Initial phase for the U.S. Headquarters for the GF Linamar Operation. Scope of work for this LEED certified, zero-emission facility consisted of sitework and infrastructure for the entire 57-acre campus and associated 270,441 SF new plant that specializes in light metal die-casting.

Construction at the new plant included an office build-out, manufacturing facility, labs for quantitative analysis, and a storage facility. The Die-Casting facility manufactures parts necessary for Automotive manufacturing. $35M

$33M

Fedex Ground Distribution

Nashville, TN

Located on a 55-acre site, majority of the ground surface comprised of mass rock, this project included the construction of three buildings, a 305,000 SF distribution facility, a 5,000 sf vehicle maintenance garage, and a 3,000 sf gateway building. The main building and maintenance garage are both constructed of conventional steel frames with load bearing concrete tilt-wall panel skin and TPO roof systems. The gateway building is metal stud and truss framed with fiber cement siding and an asphalt shingle roof. The main building also includes 15,000 sf of administrative space, a 1,500 sf maintenance area shop, and an automated sorting system spanning the entire distribution area. Scope of work included design-build services, complete shell building construction, and a comprehensive site work package.

$27M

KeHE

Douglasville, GA

Scope of work includes complete design-build services for a 450,000 sf LEED Certified, buildto-suit distribution facility for the food industry. The building is located on a fully developed 35-acre site to accommodate cross dock loading with 65 truck positions. The main building is constructed of conventional steel framing with load bearing site cast concrete tilt-wall panels, 6” ductilcrete slab and a single ply TPO roof system. The interior of the building includes a 66,000 sf freezer space to -15 degrees Fahrenheit and 37,000 sf of cooler space. The cold storage area is constructed of insulated metal wall panels and insulated ceiling panels. There are two offices located inside the ambient area of the facility. The main office is 7,200 sf with a combination of open offices, private offices, conference rooms, and locker rooms. The secondary office is 1,400 sf comprised of open office and small restrooms.

$24M

EDUCATION B.S. in
Construction and Contracting from
University
" Unity is strength... when there is teamwork and collaboration, wonderful things can be achieved."
Building
Georgia Southern
20 years of experience
www.reevesyoung.com
Billion $ Portfolio

INDUSTRIAL

Reeves Young Industrial focuses on delivering custom building solutions that best fit our client’s needs, providing early budget assurance as well as speed to market. From distribution facilities to complex manufacturing campuses, our team has the expertise to assist you through each phase of your project from concept to completion. Our ability to self-perform multiple facets of construction enables us to offer the most cost-effective solutions, schedule certainty, and a high-quality product through an enjoyable experience that is unique to working with us.

& Logistics
to Suit Speculative Warehouse
Distribution
Manufacturing Cold Storage Tenant Improvements Build
INDUSTRIAL MARKETS

Riverside Douglasville, GA

Scope of work includes complete design-build services for a 450,000 sf LEED Certified, build-to-suit distribution facility for the food industry. The building is located on a fully developed 35-acre site to accommodate cross dock loading with 65 truck positions. The main building is constructed of conventional steel framing with load bearing site cast concrete tilt-wall panels, 6” ductilcrete slab and a single ply TPO roof system. The interior of the building includes a 66,000 sf freezer space to -15 degrees Fahrenheit and 37,000 sf of cooler space. The cold storage area is constructed of insulated metal wall panels and insulated ceiling panels. There are two offices located inside the ambient area of the facility. The main office is 7,200 sf with a combination of open offices, private offices, conference rooms, and locker rooms. The secondary office is 1,400 sf comprised of open office and small restrooms.

KeHE *Project completed by Randy Penland & Chris Smith with previous employer.

Falcon Parkway Industrial Park

Flowery Branch, GA

This design assist and full MEP design-build project consists of two Class A, tilt wall construction warehouses on the same site, totaling 642,000 SF. Building 100 is a 36’ clear height cross dock facility with 7” thick conventional slab design. Building 200 is a 32’ clear height front load facility with a 6” conventional slab design.

The site consists of 180’ truck courts and large auto parking areas requiring extensive site work, utility work, and several large retaining walls. Site location also required a Department of Transportation scope of work to expand and add deceleration lanes to the adjacent state route. LEED design and construction requirements were followed to achieve LEED certification for both buildings.

Spanx CEO Sara Blakely inside of Falcon Parkway Industrial Park Warehouse

GF Linamar- DieCasting Facility Fletcher, NC

Initial phase for the U.S. Headquarters for the GF Linamar Operation. Scope of work for this LEED certified, zero-emission facility consisted of sitework and infrastructure for the entire 57-acre campus and associated 270,441 SF new plant that specializes in light metal diecasting. Construction at the new plant included an office build-out, manufacturing facility, labs for quantitative analysis, and a storage facility. The Die-Casting facility manufactures parts necessary for Automotive manufacturing.

KeHE Dallas, TX

This million square feet design assist facility consisted of +/- 400,000 SF of freezer/ cooler and +/- 600,00 SF of dry storage and office space. The state-of-the-art shell was constructed out of half tilt panel and half insulated metal panels. Mechanical, Electrical, Plumbing, and Fire Protection were design build on the project. This required extensive coordination between the Alta Refrigeration equipment and the four, 4000 AMP power services to the building along with all the various offices within the facility. The freezer/ cooler portion included ice cream room, protein room, and cold docks with vertical levelers which were built with expansion capabilities in mind. The dry storage of the facility was designed and constructed for tenant’s large pick modules and conveyors.

*Project completed by Stephen McMillan and Randy Penland at previous employer. *Project completed by Randy Penland & Chris Smith at previous employer.
Simple Automation Braselton, GA
MAKITA Test Lab Buford, GA

Children’s Healthcare of Atlanta

Braselton, GA

Flowery

Branch, GA

ZEBRA

Phillip Morris PMUSA Water Hub

Richmond, VA

Reeves Young was selected as the Program Manager for this expedited design-build project. Designed specifically for the Phillip Morris USA facility, The WaterHub reduces consumed water by 40% and eliminates 55% of wastewater discharge. Major equipment installation included influent pumps, rotary bar screen, odor control system, EQ/tank/pumps, fine screen, weir gates, membrane system, UV System, RO system, fiberglass reclaim tank with reclaim pumps, and a greenhouse. The overall plant capacity is 710,000 GPM expandable to 1.5 MGD.

Discovery Place Distribution Center

Mableton, GA

This design-build project features a 69,000 SF tilt wall construction warehouse facility. The building is a 32’ clear height facility with a 6” thick conventional slab design. The 6-acre site consists of a 135’ truck court and multiple parking areas. The project also includes an underground detention system with a 109,000 CF capacity to help with stormwater runoff on this compact site.

Lochridge/Covington Business Center

Covington, GA

This design-build project is a single 210,552 SF building on a 21.8-acre site. It features sectional overhead dock doors, and two drive-in doors with concrete ramps. There is over 600’ of heavy duty paving at the truck court, a TPO roofing system, and 4 storefront entrances in this facility, all protected by an ESPR sprinkler system.

GA

The project consisted of a 60acre site with a disturbed area of 39.5 acres. It will include three buildings and a pad for a future building. Building 1 will have 160,746 SF. Buildings 2 & 3 will be 150,388 SF each.

Braselton Crossroads Distribution Center Braselton,

Duncan Reidville

Duncan, SC

This Design Build project consists of a new 273,000 SF industrial spec facility that will meet LEED requirements on a 23-acre site. As an early partner in the design process, Reeves Young was able to help navigate the rerouting of existing runoff from the adjacent interstate storm system, as well as reroute utilities to avoid wetland impacts and rock exposure.

Augusta Transit Operations & Maintenance Facility Braselton, GA

This project consisted of demolishing an existing, abandoned movie theatre to create a campus to operate and support the entire Augusta Transit System. This included deep foundation construction to remediate the unsuitable soils at the site. The Maintenance Facility included four bays with lifts in each bay, Battery Room, Tire Shop, Parts Storage and Lube Rooms. Adjacent to the facility is a Separate Bus Wash Facility and two separate fueling stations with a dedicated fueling tank. In the main building there is an Operational wing that includes Class A Offices, Meeting Rooms, full locker room for the staff, dispatch and breakroom. The entire facility is backed up with an onsite generator as a potential FEMA checkpoint in a state of emergency.

Best Friend Road

Norcross, GA

The Best Friend Road project consists of a new 545,000 SF cross-dock industrial spec facility that sits on a 30acre site, that was formally operated by the Atlanta Journal Constitution prior to its demolition. As a partner of this development, Reeves Young was able to provide assistance in navigating around existing utilities in the established industrial park and avoid conflicts with the neighboring rail line system.

Rockdale Technology Center

Conyers, GA

RTC 500 is a project that consists of 163,035 SF industrial spec warehouse space. Reeves Young held the Mechanical, electrical, and plumbing designs. The building is 46’ on height. Reeves Young was able to take this parcel in between an existing industrial park and tie everything in storm, sanitary, and water wise perfectly. This space is designed to separate/house over 4 tenants.

BUSINESS UNITS FEATURED PROJECTS

1.NAME: Douglas Hills LOCATION: Douglasville, GA OWNER: Strategic Real Estate Partners 2.NAME: Zebra LOCATION: Flowery Branch, GA OWNER: Zebra Technologies 3.NAME: Duncan Reidville LOCATION: Duncan, SC OWNER: Logistics Properties 4.NAME: Augusta Transit Operations & Maintenance Facility LOCATION: Augusta, GA OWNER: Augusta Public Transit 5.NAME: Rockdale Technology Center LOCATION: Rockdale, GA OWNER: Ackerman & Company 6.NAME: Lawrenceville Public Works LOCATION: Lawrenceville, GA OWNER: City of Lawrenceville Industrial
COVER SHEET SPECIFICATIONS SPECIFICATIONS SPECIFICATIONS SPECIFICATIONS SPECIFICATIONS CODE ANALYSIS LIFE SAFETY PLAN ARCHITECTURAL SITE PLAN OVERALL FLOOR PLAN PARTIAL FLOOR PLAN PARTIAL FLOOR PLAN PARTIAL FLOOR PLAN ENLARGED PLANS ROOF PLAN ROOF MISC. DETAILS EXTERIOR ELEVATIONS EXTERIOR ELEVATIONS WALL SECTIONS MISC. DETAILS UL DETAILS DOOR SCHEDULES, FRAMES & DETAILS WINDOW ELEVATIONS & DETAILS PUMP HOUSE PLANS PUMP HOUSE ELEVATIONS GENERAL NOTES SPECIAL INSPECTIONS OVERALL FOUNDATION PLAN PARTIAL FOUNDATION PLAN PARTIAL FOUNDATION PLAN PARTIAL FOUNDATION PLAN OVERALL ROOF FRAMING PLAN PARTIAL ROOF FRAMING PLAN PARTIAL ROOF FRAMING PLAN PARTIAL ROOF FRAMING PLAN FOUNDATION DETAILS FOUNDATION DETAILS TYPICAL TILT-UP DETAILS ELEC./PUMP ROOM PLANS, DETAILS & MISC DETAILS FRAMING SECTIONS & DETAILS FRAMING SECTIONS & DETAILS BRACED FRAME ELEVATION & DETAILS OVERALL TILT UP LAYOUT PANEL PLAN TILT UP PANEL LINE ELEVATIONS TILT UP PANEL LINE ELEVATIONS TILT UP PANEL LINE ELEVATIONS TILT UP PANEL LINE ELEVATIONS TILT UP PANEL LINE ELEVATIONS TILT UP PANEL LINE ELEVATIONS TILT UP PANEL LINE ELEVATIONS SCHEDULES, DETAILS AND NOTES OVERALL FLOOR PLAN ELECTRICAL NOTES, DETAILS AND LEGEND RISER DIAGRAM AND SCHEDULES ELECTRICAL SITE PLAN OVERALL POWER PLAN PARTIAL POWER PLAN PARTIAL POWER PLAN PARTIAL POWER PLAN OVERALL LIGHTING PLAN PARTIAL LIGHTING PLAN PARTIAL LIGHTING PLAN PARTIAL LIGHTING PLAN PLUMBING OVERALL PLAN PLUMBING PARTIAL PLAN 2 3 4 5 6 1
Reeves Young Construction
DRAWING INDEX 1011
DOUGLAS HILLS ROAD, LITHIA SPRINGS, GA
Featured Projects
1.NAME: Mercedes Benz Stadium Site Development LOCATION: Atlanta, GA OWNER: Holder-Hunt-Russell-Moody, JV 2.NAME: Westside Park LOCATION: Atlanta, GA OWNER: City of Atlanta 3.NAME: Atlanta Beltline LOCATION: Atlanta, GA OWNER: Atlanta BeltLine, Inc. 4.NAME: Infinite Energy Center Expansion and Renovation LOCATION: Duluth, GA OWNER: Infinite Energy Center 5.NAME: State Farm Headquarters LOCATION: Dunwoody, GA OWNER: Holder Construction 6.NAME: Atlanta Water Supply – Bellwood Quarry LOCATION: Atlanta, GA OWNER: City of Atlanta Heavy Civil 2 3 4 5 6 1
Reeves Young Construction
Featured Projects

Featured Projects

1.NAME: The Water Tower @ Gwinnett LOCATION: Buford, GA OWNER: The Water Tower 2.NAME: Emory University WaterHub LOCATION: Atlanta, GA OWNER: Emory University 3.NAME: Chattanooga Wet Weather Combined Sewer Storage LOCATION: Chattanooga, TN OWNER: City of Chattanooga 4.NAME: Whitewater Creek Water Pollution Control Plant LOCATION: Fayetteville, GA OWNER: City of Fayetteville 5.NAME: Scott Candler Water Treatment Plant LOCATION: Atlanta, GA OWNER: Dekalb County 6. NAME: Riverbend Environmental LOCATION: Ball Ground, GA OWNER: Cherokee County Sewer & Water Authority Water Resources 2 3 4 5 6 1
Reeves Young Construction
1.NAME: Regus Spaces at the Battery LOCATION: Atlanta, GA OWNER: Regus Group 2.NAME: Hyatt House Vanderbilt LOCATION: Nashville, TN OWNER: HH Nashville JV Holdings, LLC 3.NAME: Corso Senior Living LOCATION: Atlanta, GA OWNER: Village Park Paces, LLC 4.NAME: Coca Cola Roxy Theater LOCATION: Atlanta, GA OWNER: Live Nation Entertainment 5. NAME: Grand Hyatt Hotel & Convention Center LOCATION: Memphis, TN OWNER: Carlisle Corporation 6.NAME: Village Park Senior Living LOCATION: Alpharetta, GA OWNER: Village Park Senior Living, LLC Commercial Private
Reeves Young Construction 2 3 4 5 6 1
Featured Projects

Featured Projects

2 4 6 1.NAME: Chamblee Public Safety LOCATION: Chamblee, GA OWNER: City of Chamblee 2.NAME: Beacon Municipal Complex LOCATION: Decatur, GA OWNER: City of Decatur 3.NAME: Centennial Olympic Park LOCATION: Atlanta, GA OWNER: Georgia World Congress Center Authority 4.NAME: MARTA Station Rehabilitation Program LOCATION: Atlanta, GA OWNER: Metropolitan Atlanta Rapid Transit Authority 5.NAME: Georgia World Congress Center Orange Parking Deck LOCATION: Atlanta, Georgia OWNER: Georgia World Congress Center Authority 6.NAME: North Georgia Technical College Industrial Technology Center LOCATION: Clarkesville, GA OWNER: Georgia State Finance & Investment Commission Commercial Public 3 5
Reeves Young Construction
Stephen
smcmillan@reevesyoung.com 404.456.2460
McMillan Vice President - Industrial

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.