Atlanta Water Supply Bellwood Quarry

Reeves Young provided the site work services to support the creation of a five-mile tunnel from the Chattahoochee River to the Bellwood Quarry. The tunnel connects the quarry to the Hemphill Water Treatment Plant. Our scope of work included a 3,800 SF permanent soil nail wall, 3,500 SF modular block walls, and 48 16″ diameter auger cast piles varying in length from 29-38 ft. Site utilities included 1,300 LF of 36″ ductile iron pipe, 3,000 LF of waterline up to 8” in diameter, 1,500 LF of sanitary sewer, 3,700 LF of reinforced concrete pipe up to 24” in diameter, and high-density polyethylene storm sewer. Scope also included pump station yard piping with 36”-48” ductile iron pipe and 140 LF of 84″ fiberglass reinforced epoxy pipe

36-48”

DUCTILE IRON PIPE 84”

FIBERBLASS PIPE

12,450 LF UTILITY INFRASTRUCTURE PIPE