N
EN
WINNING PROJECTS
BUILDING
AWARDS
CA
Issue number 44 | Summer 2014 | PM40024961 | $6
A
UE
C I AL I S E SP DIAN GRE S
sabMag - SUMMER 2014
1
LEDCOR RENEW
GREEN PERFORMANCE SOLUTIONS
T h e O n e - S t o p S o l u t i o n t o O p t i m i z e Yo u r B u i l d i n g s Building Assessment 路 Financial Modelling/ROI Analysis 路 Guaranteed Implementation 路 Monitoring
HOW DOES YOUR EXISTING BUILDING COMPETE WITH A NEW ONE?
www.ledcor.com/renew 2
sabMag - Summer 2014
See Summer 2014, issue 44
Award Winner 2010 | 2011 | 2012 | 2013
For more on the Award-winning projects in this issue
Best issue bronze award 2013 International excellence in business-to-business publishing
Rediscover Concrete
N
10
AWARDS
CA
Viewpoint
LEED v4 in Canada
2014
Essential solutions for sustainable building and infrastructure [Sponsored supplement]
37
SPECIAL SECTION uuu
62
Interview with
Winning projects of the 2014 Canadian Green Building Awards
Sponsors
UE
8
BUILDING
Architecture Canada, Events, Book review
C I AL I S E SPADIAN GRE S EN
6
www.sabmagazine.com
Renee Gratton: Her mission to end construction waste
issuE DON’T MISS next Fall 2014 Westmount Rinks - Underground sports centre uses heat transfer to save energy Small buildings - Examples of small-scale buildings that squeeze the most from budgets Occupant Behaviour and Performance - How occupant behaviour affects building performance Continuing Education article: LCA in Building Design Life Cycle Analysis as a design parameter
Cover: Winning projects of the 2014 Canadian Green Building Awards sabMag - SUMMER 2014
3
From far and wide… we’re Connecting Canadians From coast to beautiful coast, Uponor works with partners to provide innovative, efficient and trusted solutions. Whether a hotel in Toronto, a government building in Montreal, or a Condominium in Vancouver, the Uponor PEX-a Plumbing System, featuring Uponor AquaPEX tubing and ProPEX expansion fittings, consistently provides cost and labour savings, without compromising quality. At Uponor, we stand on guard for our partners. We work with you to find the right solution each and every time. • Most trusted, tested and listed in the industry • ULC S102.2 plenum listing* • Shape memory — kink reparable • Full-service design and technical support • Engineer’s resource portal: CAD, Specs, BIM, LEED®
Get connected, change your business
* Please visit listing agency website for complete listing www.QAI.org 4
sabMag - Summer 2014
editor’s note
Dedicated to high-performance building LEED EDUCATION PROVIDER
Member Canada Green Building Council
SABMag is a proud member and media partner of the CaGBC, and works closely with them on content for each issue.
The 2014 Canadian Green Building Awards This issue features the winning projects from
VISIT www.sabmagazine.com
the 2014 Canadian Green Building Awards
Publisher Don Griffith 800-520-6281, ext. 304, dgriffith@sabmagazine.com
program that was adjudicated in Ottawa
Editor Jim Taggart, FRAIC 604-874-0195, architext@telus.net
opportunity to acknowledge the Canada
Editorial Assistant Katherine Berry
program; our corporate sponsors Autodesk,
Senior Account Manager Patricia Abbas 416-438-7609, pabbas8@gmail.com
Interface, Uponor and the Canadian Precast
Graphic Design Carine De Pauw 800-520-6281, ext. 308, cdepauw@sabmagazine.com
Brian Rudy, Jennifer Sanguinetti, Christopher
earlier this spring. We would like to take this Green Building Council as our partner in this
Prestressed Concrete Institute; and our jurors, photo: ROY GROGAN
Simmonds and Kevin Stelzer. This year’s competition attracted a broad
range of entries from coast to coast, from single-family home retrofits, to
Published by
www.janam.net
large-scale laboratory complexes. The jury’s task was made even more diffi-
81 Leduc St.,Gatineau,Qc J8X 3A7 800-520-6281, ext.304, 819-778-5040 Fax: 819-595-8553
cult by the quality of submissions, which not only demonstrated an increased
Subscription/address changes: info@sabmagazine.com, 800-520-6281, ext. 304 Subscription prices Canada: [Taxes extra] PRINT 1 year [4 issues] $24.95 2 years [8 issues] $46.95 3 years [12 issues] $67.40
DIGITAL $19.95 $34.95 $54.95
ISSN 1911-4230 Copyright by Janam Publications Inc. All rights reserved. Contents may not be reprinted or reproduced without written permission. Views expressed are those of the authors exclusively.
focus on quantitative performance, but many of which also embraced a broader and more holistic approach to sustainability. After much deliberation, the jury chose eight projects, from seven cities in three provinces. The projects are drawn from both public and private sectors and include residential, commercial, cultural, institutional and industrial buildings. All this serves to confirm that work of the highest quality is now being realized across the country and across all sectors of the market. With the imminent introduction of LEED V4 to Canada [See overview in this issue], we can anticipate the more widespread adoption of life cycle assessment and other sophisticated metrics across the Canadian design and
Publication Mail Agreement #40024961
construction industry. As these initiatives permeate our culture, we can look
Return undelivered Canadian address mail to: Janam Publications Inc., 81 Leduc St., Gatineau, Qc J8X 3A7
forward to future awards programs in which total performance standards will be even higher, and the other aspects of sustainability even more comprehensively addressed.
The print version of SABMag uses Rolland Enviro 100 Satin, a 100% post-consumer fiber that is certified FSC and EcoLogo. It is processed chlorine-free, FSC-recycled and is manufactured using biogas energy.
Thanks to all those who submitted projects this year, and congratulations to all our winners. Jim Taggart, FRAIC Editor
We thank our 2014 sponsors
Environmental savings for this issue:
77 Trees
275,795 litres water
4,022 kg waste
9,805 kg CO2 sabMag - SUMMER 2014
5
Civil Society and the Built Environment Architecture Canada | RAIC Report
If a situation exists that threatens quality of life, it is
communities, unrelated to tra-
often civil society organiza-
ditional practices and knowl-
works to improve living condi-
tions that are best suited to
edge of the land, can exacer-
tions for people in 30 countries.
speak out, to act, or otherwise
bate poor living conditions.
The Aga Khan spoke of the
intervene. Being a recognized
Our growing cities, mean-
society
authority on a subject lends
while, are wasteful of non-
which he defined as "an array
credibility to opinions, particu-
renewable resources. Buildings
of institutions which operate on
larly if one is not advocating for
consume more energy than
By Allan Teramura
a private, voluntary basis, but
commercial reasons.
they should.
Royal Architectural Institute
are motivated by high public
Organizations that deal with
Opportunities include advo-
of Canada (RAIC)
purposes." Professional asso-
the natural environment and
cating for change in public
Regional Director, Ontario
ciations, such as the RAIC, are
human health are better known
policy. The RAIC, for exam-
North, East and Nunavut
included in this group, as are
to the general public than
ple, is developing a strategy
those that work in media, the
those that deal with the built
for implementing incremental
arts, and education.
environment.
changes to Canada's energy
importance
In February 2014, I had the
of
civil
good fortune to attend an
It is his firm conviction that
address of His Highness the
civil society is a sector that is
as there are many issues to
Aga Khan to a joint session
essential for the success of any
address, globally and locally.
of the Canadian Parliament
democracy; such organizations
For example, too many peo-
in Ottawa. The Aga Khan is
have talents and competencies
ple in First Nation communities
energy performance are achiev-
the
This
needs
to
change,
codes, to align with the objectives of the 2030 Challenge. As architects, we know that dramatic
improvements
the
upon which societies rely. They
do not have access to clean
able today. We have a respon-
world’s Shia Ismaili Muslims
are bound to uphold ethical stan-
drinking water and functional
sibility to ensure that this is
and founder of the Aga Khan
dards of practice that go beyond
sanitation systems. The design
understood by the public and
Development Network, which
mere commercial transaction.
and location of many of these
their elected representatives.
spiritual
leader
of
A GREEN ROOFS FOR HEALTHY CITIES CONFERENCE
AUGUST 25-26, 2014 TORONTO, ON
WWW.GREYTOGREENCONFERENCE.ORG
A CONFERENCE ON THE ECONOMICS OF GREEN INFRASTRUCTURE DESIGNING FOR HEALTH
For our economy, our ecosystem and our bodies. Venue: Eaton Chelsea Hotel - 33 Gerrard Street West Toronto, Ontario, M5G 1Z4 Canada
SPONSORED BY:
6
to
sabMag - Summer 2014
@GRHCNA
WWW.FACEBOOK.COM/GREENROOFSFORHEALTHYCITIES
New book on design of sustainable communities
Custom Brick™
Lymestone™
TerraNeo®
Quartzputz®
The Continuous Insulation (C.I.) component of Outsulation® Systems can be shaped, cut, and grooved to create multiple and diverse architectural styles.
Through detailed photographs and diagrams, Fraker provides a road map for retrofitting everything from waste streams to energy systems to public transportation, guiding architects and planners as they bring net-zero
energy and low-carbon emissions to their designs. • 248 pages | 8.25 x 10 • Ebook: $39.99 ISBN: 9781610914093 • Hardcover $80.00 ISBN: 9781610914079 • www.islandpress.org
EVENTS âJune 17-18, 2014, Toronto - 6th Annual Transforming & Revitalizing Downtown Summit www.revitalizingdowntowns.net âAugust 25-26, Toronto - Grey to Green green roof conference www.greytogreenconference.org âOctober 2, 2014, Toronto - Green Building Festival www.sbcanada.org
ADS IN THIS ISSUE 2 Ledcor Renew 4 Uponor 6 Dryvit 7 GreenScreen 10 Interface 35 Tempeff 36 Inline Fiberglass Ltd. 41 GE Lighting/Zinco Canada/ Cascadia Windows
49 Morrison Hershfield/ Eco Insulating Glass 54 Taco 61 Sustainable Forestry Initiative/GSP Group/Plyboo/ Ventana Construction/Columbia Skylights/Kerr Wood Leidal Associates Ltd.
63 64
MEC, North Vancouver
For more information call 1.800.263.3308 e-mail info@dryvit.ca or visit dryvit.ca
CIR S, University of British Columbia
In his book, noted architecture professor Harrison Fraker argues that to create sustainable communities we need integrated whole-system design. He focuses on the neighbourhood scale and gathers performance data from four cutting-edge sustainable communities in Sweden and Germany. He creates a LEED ND rating for each community, extracts the lessons learned, and looks at a hopeful low-carbon model in Davis, California.
G R EEN FA CA D ES
Using the latest in acrylic copolymer, UV resistant and hydrophobic chemistry, a Dryvit® finish can provide a variety of high performance characteristics with the appearance of stucco, limestone, brick, and metal.
Canadian Precast Prestressed Concrete Institute Forbo Flooring
C o n t in u in g Ed u cati on B IM • R EV IT • SketchUp Pla n t in g G u id el i nes
sabMag - SUMMER 2014
7
skinny planks
The sincerest form of flattery.
Our new 25cm x 1m skinny planks imitate the long and narrow proportions of wood flooring and vinyl plank tile. The result? New layout options like herringbone and ashlar that emulate planked hard surface floors, but offer the economy, acoustic properties, and underfoot feel of carpet. Considering hard surface for your next project? Skinny planks may be the better alternative. Explore the possibilities at Interface.com/planks.
10
sabMag - Summer 2014
REDISCOVER
CONCRETE Essential solutions for sustainable building and infrastructure
sponsored supplement
Essential solutions for sustainable building and infrastructure
1
24
Essential solutions for sustainable building and infrastructure
SIMPLIFIED SYSTEM DESIGN AND PAYBACK THAT’LL BLOW YOU AWAY! Commercial and Industrial ERV’s Featuring Dual Core Energy Recovery
™
• 90% Sensible Efficiency & 70% Latent Recovery • Extreme Climate Performance • Frost Resistance to Eliminate Energy Robbing Defrost Strategies • Low Maintenance & Long Term Performance Tempeff North America products employ Dual Core regenerative technology that offers up to 90% sensible efficiency. Other available technologies offer much lower efficiency below freezing due to frost when recovery is needed the most. The Dual Core design is significantly more energy efficient in all conditions, so the payback periods are attractive. Find out how you can get the energy recovery to suit your needs at tempeffnorthamerica.com
Turning Up the Heat on Energy Recovery C
TEMPEFF V E NsabMag T I L A T I-O SUMMER N T E C H 2014 N O L O G35I E S
VALUE THROUGH INNOVATION As a Canadian manufacturer of High Efficiency Windows and Doors for building envelopes, INLINE is a proud supplier of fiberglass windows for the Brickworks project. INLINE triple glazed fiberglass windows installed in the Brickworks provide an R-8 centre-of-glass insulating value. That gives the highest possible impact at the envelope’s weakest point.
Evergreen Foundation Brickworks. Construction Design: Targetting LEED Platinum. Diamond + Schmitt Architects/ Du Toit Architects Limited/ Eastern Construction
With a commitment to green and sustainable design, through profiles pultruded exclusively in green and recycled material, INLINE is fully positioned to support green building projects and LEED eligibility. Call us to discuss your next project.
www.inlinefiberglass.com 1.866.566.5656 36
sabMag - Summer 2014
BUILDING
CA
AWARDS 2014
TH E
N
A
O
W
T N G A RE DI E
N
A NATIONAL PROGRAM OF SUSTAINABLE ARCHITECTURE & BUILDING MAGAZINE AND THE CANADA GREEN BUILDING COUNCIL
OME C L E
Jury
www.sabmagazine.com
Visit the Awards section of our website for more on the winning projects, the original submissions, and videos of the jury deliberations.
The eight projects selected in the 2014 Canadian Green Building Awards are among the most exemplary sustainably-designed
Kevin Stelzer B.Arch., B.E.S., OAA, NLAA, MRAIC, LEED AP, BD+C, BSSO Principal at B+H Architects, he focuses on sustainable design, energy optimization and building physics for laboratory, educational and healthcare projects.
Jennifer Sanguinetti, P.Eng., P.E., LEED AP [BD+C], Director, Smart Buildings & Energy Management, BC Housing Responsible for greenhouse gas emissions and energy management of BC Housing’s diverse portfolio of buildings.
buildings in Canada. Our thanks to our jurors for their diligence, and to our sponsors whose support make the Awards possible. We especially thank all those who entered the 2014 Awards. Your participation
Christopher Simmonds B.E.S., B.Arch., OAA, MRAIC, LEED AP - Principal of the award-winning firm Christopher Simmonds Architect Inc., located in Ottawa. His firm has been recognized through several awards.
is helping to advance ideas of improved building design for the betterment of the Canadian public.
Brian Rudy BES, B.Arch., OAA, MRAIC Principal at Moriyama Teshima Architects, specializing in arts and cultural facilities.
sabMag - SUMMER 2014
37
MOUNTAIN EQUIPMENT CO-OP STORE
JURY COMMENT A beautiful building with impressive performance - the more so because it is a retail facility that needs to attract and engage customers. The site development and integration with the park is carefully considered. MEC raises the bar every time it developes a new store.
PROJECT CREDITS Owner/Developer Mountain Equipment Co-op Architect Proscenium Architecture and Interiors Inc. General Contractor Ventana Construction Corporation Landscape Architect Sharp and Diamond Landscape Architecture Inc. Civil Engineer Kerr Wood Leidal Associates Ltd. Mechanical/Electrical Engineer Pageau Morel and Associates Inc. Structural Engineer Fast + Epp Structural Engineers Commissioning Agent Stantec Consulting LEED Consultant Recollective Development Manager Corin Flood Geotechnical Consultant Geopacific Consultants Ltd. PhotoS Bob Matheson Photography/Randy Sharp, Sharp & Diamond Landscape Architects Inc.
MATERIALS Steel frame with structural insulated panels with curtain wall, concrete slab, TPO roof, vegetated facade by Green Screen, fiberglass windows by Cascadia Windows Ltd., resilient flooring by Forbo The building has a hybrid steel and glulam structure and demountable structural insulated panels for the walls and roof [1]. With parking located at the rear, the building could be located at the intersection of the principal streets, improving the pedestrian experience [2]. The exterior green wall reduces heating demand through evaporative cooling, and is irrigated using storm water from the roof [3].
1
LYNN CREEK LYNNMOUTH PARK
C
Site plan
E
F
H
D G
E
B A sc
C F
38
sabMag - Summer 2014
A B C D E F G H
N
MEC store Vehicular permeable concrete unit pavers Grass swale Naturescape planting, grasses and flowering shrubs Restore existing grass Rain garden Boardwalk Public art
4 Overland storm water management is supplemented by underground storage and infiltration facilities; requiring no connection to the municipal sewer. With 100% mitigation of storm water, up to and including a 10-year storm event, MEC North Vancouver exceeds municipal LEED® and Department of Fisheries and Oceans requirements. The building’s mechanical system is designed to be primarily passive. It has been designed with a reduced capacity and depends on solar gain and prevailing winds to maintain acceptable conditions. The building sources electricity from Bullfrog Power, Canada’s leading sustainable energy provider. During daylight hours the retail floor is lit entirely with natural light through the use of a saw tooth roof with south-facing Solera glazing units. A mechanical room with large inlet louvres draws fresh air using
large-diameter, low-velocity propeller fans, and directs it into plenums under the main floor of the store. Air is exhausted at the ceiling level through large area louvres in the sides of the saw teeth. Recorded or forecasted hot temperatures trigger the natural ventilation system and radiant floor system to operate during unoccupied periods, cooling the building mass before the next hot day. The project is targeting LEED® gold designation focusing on energy efficiency, water consumption, materials, landscaping and public access. While retail generally communicates consumption, the new MEC North Vancouver store reflects MEC’s commitment to conservation, public education, outdoor recreation, and stewardship of the environment.
During daylight hours the retail floor is lit entirely with natural light from the clerestory glazing in the sawtooth roof [4]. the boardwalk approach. The energy performance of the building is exemplary given the need to attract retail customers with large expanses of glazing [5]. The site offered a rare opportunity to blur the edges between the retail facility and the adjacent public park and stream ecosystem [6].
5
6 40
sabMag - Summer 2014
GE Lighting
More than
a light fixture. It fixed her perception of morning meetings.
CasCadia WindoWs & doors When employees feel more energized, they
Our products represent leading edge fiberglass innovations, engineered and detailed for unparalleled performance. Serving the institutional, residential and commercial industry sectors.
are more productive. And we know how much productivity impacts your bottom line. That’s because before we illuminate, we listen. And it’s why we’ve created office LED lighting and control solutions that can energize employees, while minimizing costs and saving energy. It’s
www.cascadiawindows.com
the GE Advantage™, and it’s built around you. Visit gelighting.com/office to learn more, and see if you qualify for a free lighting audit.
Questions? Contact: Taisia Vladimirova, Marketing Manager Email: Taisia.Vladimirova@ge.com Phone: 905 301 3246
© GE 2014 Photo: Paul Grdina Photography
sabMag - SUMMER 2014 GEL01_141521_Mag Ad Resize(CS5)_v6.indd 1
cascadia 1/4 final ad.indd 1
2014-05-22 11:24 AM
41
12-02-13 8:38 AM
Your Single-Source Supplier for All Solutions to Keep Your Facility Covered Sherwin-Williams and General Paint can help meet your requirements for aesthetics and durability. Plus, we have the most comprehensive lineup of coatings that meet the environmental regulations set forth by a variety of guidelines, including Canada’s Federal VOC standards, LEED, MPI, GEI and more. visit: www.Sherwin-Williams.com | www.GeneralPaint.com
PROJECT Lassonde Mining Innovation Centre (University of Toronto) ARCHITECT/FIRM Baird Sampson Neuert Architects Inc. PHOTOS Terence Tourangeau Photography SHERWIN -WILLIAMS COATINGS USED ProMar® 200 Zero VOC Interior Latex ProMar® 400 Zero VOC Interior Latex
PROJECT Centre for Interactive Research on Sustainability (CIRS) ARCHITECT/FIRM Perkins + Will Canada Architects Co. PHOTOS Martin Tessler / Courtesy: Perkins+Will GENERAL PAINT COATINGS USED Envirogard® Waterborne Acrylic Coating Z-Coat® Enviro-Friendly Waterborne Acrylic Latex
©2014 The Sherwin-Williams Company
46
sabMag - Summer 2014
CENTRE FOR INTERACTIVE RESEARCH ON SUSTAINABILITY 1
Accommodating 200 private and public sector researchers, CIRS was conceived as a tool to demonstrate the possibilities in sustainable design and construction. Serving as a catalyst for change, its structure and environmental systems were chosen to be practical, economical and transferable. The 5,675m2 ‘living lab’ is organized around two four-storey wings, linked by a central atrium, from which all of the project’s sustainable strategies are visible. The remainder of the program includes academic offices, a variety of teaching and laboratory spaces, an auditorium and a cafe. The CIRS building has embraced the ambitious sustainability goals of the Living Building Challenge, including those of net zero water consumption; waste water treatment on site; net zero energy consumption, and construction and operational carbon neutrality.
2
JURY COMMENT A benchmark project with respect to the implementation of green building strategies in Canada. Given its scale, the risks taken by the client and design team in the name of research are huge. Spaces are warm, interesting and well lit, and the metrics are beginning to confirm that this is a very high-performance building.
The four-storey atrium, flooded by natural light, and topped by a photovoltaic array [1]. The building’s U-shape contributes to the project goal of 100% natural daylight and ventilation for all inhabitants, including the auditorium located in the centre of the building [2].
PROJECT CREDITS Client University of British Columbia Sustainability Initiative Architect Perkins+Will Structural Engineer Fast + Epp Mechanical Engineer and Electrical Engineer Stantec Civil Engineer Core Group Consultants Geotechnical Consultant Trow Associates Inc. Landscape Consultant PWL Partnership Interior Design Perkins+Will Code Consultant LMDG Building Code Consultants Building Envelope Consultant Morrison Hershfield Limited Acoustic Consultant BKL Consultants Audio Visual Consultant MC Squared System Design Group Furniture, Fixtures and Equipment Haworth Construction Management Heatherbrae Construction Owner Representative UBC Properties Trust Wastewater Consultant Eco-Tek Ecological Technologies Rainwater Consultant NovaTec Consultants Photos Martin Tessler
sabMag - SUMMER 2014
47
Narrow floorplates allow for daylight penetration
Through a simple system, rainwater is harvested from the high-albedo roofs, stored in a below-ground cistern, filtered, disinfected onsite, and distributed through the building for potable water applications. Using a solar aquatics biofiltration system, 100% of the building’s wastewater is reclaimed, treated and reused within the facility. CIRS harvests sunlight with building-integrated photovoltaics, captures waste heat from a nearby building, and exchanges heating and cooling with the ground to achieve net-positive energy on an annual basis. The building’s U-shaped plan contributes to the goal of 100% natural daylight and ventilation for all inhabitants. Building-integrated photovoltaics [accounting for almost 10% of energy], shade operable windows, and
Daylighting
the western facade’s living solar screen is planted with deciduous vines that over time will provide seasonal solar shading. A heat recovery system captures waste heat in the exhaust ventilation from the fume hoods on the adjacent Earth and Ocean Sciences building,
In the summer the living wall shades the interior spaces from the late afternoon sunlight. In the winter the living wall drops its leafs allowing sunlight in the interior spaces.
transferring it to the heat pumps in CIRS. The heat pumps provide heating and cooling for the building through the radiant slabs and a displacement
3
ventilation system. Wood was chosen as the primary building material. The expressed wood structure - constructed of FSC certified and pine-beetle-killed wood - sequesters 600 tonnes of carbon, helping the project achieve net-zero carbon in construction and operations. CIRS has demonstrated the power of integrating academic research with physical campus infrastructure, and the benefits of extending the reach of a project outside institutional boundaries. The project team created a Technical manual that accompanies the CIRS website [cirs.ubc.ca], which includes ongoing updates and actual performance data from the project.
MATERIALS Glulam structure, masonry and stone, vegetated roofing, vegetated facade [living wall] by Green Screen. Finished concrete, carpet tile, raised flooring; low-VOC paint by General Paints [Sherwin Williams]. Building-integrated photovoltaics and solar collector array, heat recovery system captures waste heat from adjacent building for transfer to heat pumps.
A living roof on the auditorium provides a courtyard amenity for upper-level office users [3]. THE living screen on the western facade is planted with deciduous vines, creating a passive shading device that displays seasonal change [4].
4 48
sabMag - Summer 2014
MORE ON THIS project IN SABMAG ISSUE 38, nov./dec. 2012, AT WWW.SABMAGAZINE.Com
I IG Innovation GLASS THAT SAVES ENERGY & MAKES ENERGY
ECO GLASS HM Want real energy savings? Insulate your windows and save up to 30% with ECOGLASS/HM IG units. Choose from R-8 to R-20 insulation. Photovoltaics integrated into ECOGLASS/HM at the Enwave Theatre produce energy for the building. That’s IG Innovation. From ECO Insulating Glass.
We’ve Brought Sustainability to the Next Level
Ottawa Archive and Library Facility Barry J. Hobin Architects
Morrison Hershfield is a North American Leader in engineering design. Utilizing the newest of sustainable technologies, Morrison Hershfield helps our clients to integrate LEED Version 4 in the design of high performance green buildings optimized to benefit the environment, human health, and the community. Morrison Hershfield’s multi-disciplinary engineering services can help you with your next building project. Our sustainable building services typically include: Expert LEED Facilitation Energy Modeling and Simulation Carbon Footprinting & Verification Building Science
Life Cycle Assessment Whole Building Commissioning Code & Life Safety
Constructive Thinkers
www.morrisonhershfield.com sabMag - SUMMER 2014
49
Do your best work.
TACO CANADA LTD. 8450 Lawson Road, Milton, ON L9T 0J8 Tel. 905-564-9422 Fax. 905-564-9436 www.taco-hvac.com FOUNDING MEMBER
54
sabMag - Summer 2014
BIBLIOTHEQUE DU BOISE
1
1
The 5,000 m2 Bibliotheque du Boise is located between the busy Boulevard Thimens and Marcel-Laurin Park, an area of protected woodland in the Montreal borough of Ville St-Laurent. The woodland became an important generator in the design of the library, the idea being to create new connections and experiences that would reinforce its value to the community and contribute to the creation of a new and attractive centre for cultural activities.
JURY COMMENT The crafting of this project was compelling - from the site planning, through the programming, right down to the execution of the details. The building has a variety of beautifully lit and welcoming spaces, in keeping with the new role that libraries play as community living rooms. This is also a very high-performance building an impressive achievement altogether.
PROJECT CREDITS Architects Eric Pelletier architecte, Cardinal Hardy et associés, s.e.n.c., Les Architectes Labonté Marcil s.e.n.c. Client Ville de Montréal, arrondissement de St-Laurent Landscape Architect Cardinal Hardy et associés, s.e.n.c. Structural engineer SDK et associés Inc. M&E engineers Leroux Beaudoin Hurens et associés Inc. Acoustic Consultant Davidson & Associés inc. LEED Consultant EXP General Contractor Pomerleau inc.
Site plan
N
Partial vIEW of south elevation [1].
sabMag - SUMMER 2014
55
D F E
E
A
B
N
5
An integrated, multidisciplinary design approach has provided the building users with individually controlled access to fresh air, daylight and views in all regularly occupied spaces. The installation of low-flow fixtures and a dual-flush water closet reduce potable water consumption, and the use of hardy, climateappropriate plants eliminated the need for an irrigation system. In addition, the project is also connected to the UNBC stormwater management system. As Prince George is located in a cold climate, reducing heating loads was a priority. On the demand side, the heating loads were significantly reduced by specifying a high performance envelope. On the supply side, the building is primarily heated using a heat exchanger on the return water of the biomass boiler. [Note that the biomass fuel of is sawmill residue used in the plant meets the definition of renewable.] Wood was chosen as the primary structural material for its inherently sustainable properties. The structure of the building is comprised of exposed glulam beams and columns supporting an exposed wood roof. The interior walls of the fuel storage and processing plant are clad with locally-manufactured GIS Douglas fir plywood, giving these spaces a much warmer appearance than would typically be the case for an industrial building. Regionally-sourced and reclaimed materials were specified wherever possible, and metal, concrete, insulation and gyproc with post- and prewaste content were used. In a region that lacks the recycling infrastructure typically found in larger urban areas, the project team still managed to divert 55% of construction waste from landfill. As an academic institution committed to sustainable principles, UNBC is using the Bio-Energy Plant as a broad educational tool for a wide range of audiences. In addition, the prominent location and transparent nature of the facility offers a constant reminder to the university community of how and where the energy it uses is being generated. Making infrastructure visible in this way helps foster a greater sense of responsibility regarding the source and potential environmental impacts of the basic services we rely on.
60
sabMag - Summer 2014
A Main entrance B Lab
C
Upper floor plan C Control room D Truck entry
E F
Open to below Plant
South elevation
The cantilevered “box� clad in western red cedar siding contains the operation and research components of the UNBC BioEnergy Plant [1]. The plant [upper left in photo] supplies 71% of the total campus heat demand. It is the first university building in BC, and only the second industrial building in Canada, to achieve LEED Platinum certification [2]. Partially burying the fuel storage and processing areas into the earth reduces the apparent scale of the building [3]. Using locally-manufactured Douglas fir plywood on the interior walls adds warmth to the industrial interior [4]. DETAIL OF ROOF SCUPPER [5]
Sustainable design down to the last detail. GSP Group is proud to have provided landscape architecture services for Canmet Materials Technology Lab. Smith+Fong Plyboo, leaders in the production of bamboo panels and flooring product, introduce a new, innovative carved and textured bamboo panel Collection Reveal™, Linear and Sound. 1-888-686-5203
PLANNERS URBAN DESIGNERS LANDSCAPE ARCHITECTS
www.gspgroup.ca
WWW.PLYBOO.CA
ventana
Resource Guide | contributors to the Awards-winning projects
Ventana is a general contractor and construction manager. Over the last 27 years, Ventana has successfully completed a wide variety of commercial, light industrial, multi-unit residential and recreational projects, many of which are LEED certified. VentanaConstruction.com 604.291.9000
Kerr Wood Leidal Associates Ltd. 1/9 TAPROOT.indd 1
house
Greater Vancouver, Vancouver Island, Okanagan, Calgary 604-294-2088 - www.kwl.ca
2014-05-22 7:04 PM
Glazing Systems
A leading Canadian manufacturer of residential and commercial glazing systems since 1955. Specializing in unitized and site built curtain wall & skylight systems. Our landmark construction projects across Canada include Airports, Hotels, Universities and Shopping Centers.
Columbia Glazing Systems Inc. Burnaby, BC 604.421.6591 info@columbiaglazingsystems.com
www.columbiaskylights.com
Lunchbox Consulting Inc.
Canada
the high-performance housing magazine for designers, builders and homeowners
Ottawa - 613 667 3043 www.lunchboxconsulting.ca Columbia Skylights - VanDusen Visitor Centre Kerr Wood Leidal Assocs. - Mt. Equip. Coop Plyboo - Canmet Technology Lab GSP Group - Canmet Technology Lab Ventana Construction - Mt. Equip. Coop
www.sabmagazine.com 1-800-520-6281, x304
SUBSCRIBE!
Choose SFI There’s a simple way you can ensure healthy forests for generations to come while supporting the people and communities in North America who depend on them. Choose the Sustainable Forestry Initiative® (SFI®) Standard. It’s a symbol of responsible forestry. Learn more at sfiprogram.org
about u care o y s ay This s ests. our for f o e r tu the fu sabMag - SUMMER 2014
61
INTERVIE
WITH Renee Gratton Founder and president of the Construction Resource Initiatives Council [CRIC], Renee Gratton wants to stamp out waste from building construction. So she set herself a mission.
â SABMag: What made you decide to take this on? While leading a drywall recycling task group, I realized the general waste generation from construction was worst than I thought. The awareness to the issue, impacts or possible solutions, was poor at best. Although I knew that changing mindsets, behaviours or related systems in the building sector would be extremely challenging, if not impossible, I found considerable interest for my thoughts on a change initiative. But ultimately, it was the overwhelming sense of duty to try to make a difference, along with support from many. â SABMag: How do you turn a big idea into action? What is your main goal? Well first you need a clear and shared vision. Then – and this is where evidently many initiatives fail – you have to overcome inertia by generating the reasons for your idea to all you need to take action. Thirdly, leading by example and taking action yourself is critical; especially when it is to engage or take the first step on a change journey. As for the main goal, in short, we aim to eliminate the ‘concept’ of building waste - challenging old ways of thinking and viewing ‘waste’ as a potential resource with a value to be realized rather than a problem to be dealt with. â SABMag: What are some of CRIC’s initiatives to reach its goal? The first was the creation of Mission 2030 - a pragmatic call-toaction for net zero construction, renovation and demolition waste by 2030. It focuses around change management, integration/education, tools/support, research/innovation and communication. Part of all this is the creation of a body of knowledge, advisory and support team. Last year, we released the ‘Waste Saver’ beta mobile app and our education program. Now we’re working on building partnerships for the app and our ‘living’ Reference guide.
CRIC wants construction waste to be viewed as a resource with value.
62
sabMag - Summer 2014
â SABMag: This is a big job. Are others helping you? Absolutely. From the onset, there were many professionals and organizations, from regional to international, helping to create, launch and continuously develop Mission 2030. And the list continues to grow, slowly but very surely. Thanks to their support and their wide-ranging subject matter expertise, I am able to raise awareness, desire, knowledge, help enable and provide reinforcement everything essential to change management, plus recognition and momentum. That said, this is indeed an extremely big job and we’ve only just begun. Therefore, countless more supporters are needed for us to succeed. â SABMag: Is this a world-wide movement that CRIC is part of? Yes, it is a world-wide movement. But it’s in fact the CRI Council who started it, to bridge the gaps between silos. Global and sectorial interactions are essential for material supply chains, resource or waste management. Especially when they are cornerstones of socioeconomical systems or impact our environmental systems. â SABMag: What are you most proud of? That’s hard to say. I am proud of every partnership, endorsement and volunteer for many different reasons. Being the first uNePGPWM [uN environment Programme – Global Partnership on Waste Management] Canadian Partner was a highlight; as was winning the People Choice Award for the MIT Centre for Collective Intelligence 2013 Climate CoLab Waste Management Contest. I was a finalist for the CTV Amazing People award, and I was appointed as a founding Director of the new National Zero Waste Council. But what I am most proud of is having stepped out of my comfort zone to grow and try to inspire a culture change in the building industry. See more at www.cricouncil.com.
EnvironmEntal Product dEclaration
EPD PrEcast concrEtE
In accordance with ISO 14025
Place de l’Escarpement, Quebec City, QC – LEED Gold Certified Architect: Pierre Martin Architecte
EPDs are third party verified (certified) reports published by product manufacturers that provide quality assured and comparable information regarding environmental performance of their products or system. The CaGBC LEED v4 Rating System and Architecture 2030 are emphasizing the demand for EPDs, by addressing transparency in environmental lifecycle impacts and the selection of building products with improved lifecycles. North American Precast Concrete associations are working together with ASTM International and Athena Sustainable Materials Institute to achieve a third party- verified EPD; providing comprehensive, uniform, and transparent details about a product’s composition and environmental impact throughout its lifecycle. Available in the fall of 2014.
ask insightful questions before making decisions. Expect transparency. For your free copies of the Life Cycle Assessment of Precast Concrete and the CPCI Sustainable Plant Program contact CPCI at: info@cpci.ca or (877) 937-2724 or visit www.cpci.ca/publications.
196 Bronson Avenue, Suite 100 Ottawa, ON K1R6H4 sabMag - SUMMER 2014
63
creating better environments
the
perfect floor covering for today’s world
www.forboflooringNA.com/marmoleum 1-800-268-8108 | info.na@forbo.com
Although Marmoleum was invented 150 years ago, it perfectly addresses the needs of today’s indoor and outdoor environments. Made from renewable ingredients, Marmoleum is 100% biobased and features naturally inherent antimicrobial and anti-static properties. Marmoleum’ s breathtaking new color palette pushes the boundaries of traditional design, and its improved Topshield 2 finish provides exceptional performance, superior durability, and the lowest cost of any resilient flooring.
the next generation of
beautiful. durable. sustainable. hygienic. with
64
sabMag - Summer 2014