CORPORATE CATALOGUE
COMPANY FORMATION Duo Corporation was created in 2013 by two partners: Mr. Murabukirwa Vicky and Mr. Emmanuel Rudaseswa who have been in the construction industry since 2000. They both created their respective companies in 2005; Gv Construction and Kora Construction. However, they joined forces in 2013 to create Duo Corporation Construction Company based in Kigali, Rwanda. They have a wealth of experience in the construction business.
VICKY MURABUKIRWA DIRECTOR/PARTNER
COMPANY DIRECTOR
He is an Engineer and is in charge of operations of the company. He has a strong experience in Project Management of construction projects of various sizes
EMMANUEL RUDASESWA DIRECTOR/PARTNER
COMPANY DIRECTOR
He is a Quantity Surveyor/Construction Project manager with extensive experience in building and road construction. He is in charge of the overall management of the Company
OURTEAM
We have a team of trained professionals who work with us to ensure the timely delivery of our projects
THE TICK BEHIND THE TOCK
BUILDING COMMUNITIES
OURMISSION
To perform for our customers the highest level of quality construction services at fair and market competitive prices
OURVISION
To continue being an efficient contractor working in an ethical and balanced manner to earn the privilege of being the contractor of choice
OURSERVICES DUO CORPORATION offers a wide range of services that include: » ROAD CONSTRUCTION » INDUSTRIAL CONSTRUCTION » CONSTRUCTION OF BUILDINGS
OURPROJECTS Below are some of the many projects we have worked on.
ONGOINGPROJECTS PROJECT: Earthworks YEAR: 2014-2015 LOCATION: Rwanda CLIENT: BPR Rwanda PROJECT: Construction Of Metallic Hangars YEAR: 2014-2015 LOCATION: Rwanda CLIENT: Nitora Rwanda PROJECT FEATURES: Construction of metallic hangars-factory tn Free Trade Zone PROJECT: Burera Dans Le Paysage De Virunga YEAR: 2014-2015 LOCATION: Rwanda CLIENT: Pacebco-Bad PROJECT FEATURES:Realisation Des Travaux De Construction D’un Batiment Devant Arbiter L’antenne Multifonctionelle Du Pacebco
PROJECT FEATURES: Early development works for a township development in Kigali, excavation and road construction. PROJECT: O-Zone Bar YEAR: 2013 LOCATION: Rwanda CLIENT: Kigali City Tower (KCT) PROJECT FEATURES: Construction and design of a bar PROJECT: Construction Of Airtel Building. YEAR: 2011-2012 LOCATION: Rwanda CLIENT: Airtel Rwanda/Enes PROJECT FEATURES: Construction Of A Commercial Building.
COMPLETEDPROJECTS
PROJECT: Aménagement De La Route En Terre Ruliba-Roka Mining. YEAR: 2010 LOCATION: Rwanda CLIENT: Roka Rwanda Mining Company PROJECT FEATURES:Road Construction.
PROJECT: Early Site Development Works For Vision City Project YEAR: 2013 LOCATION: Rwanda CLIENT: Ultimate Developers Ltd(Udl)
PROJECT: Voie D’accès En Paves Rocheux – Usine De Traitement D’eau De Karenge. YEAR: 2007 LOCATION: Rwanda CLIENT: Sogea Satom
PROJECT FEATURES:Road Construction. PROJECT:Kigali Town Roads YEAR: 2005-2006 LOCATION: Kigali-Rwanda CLIENT: Strabag International PROJECT FEATURES:Rehabilitation of Kigali Town Road, Sub-Contractor For Drainage Work. PROJECT: Kigali-Kayonza Road YEAR: 2005-2006 LOCATION: Rwanda CLIENT: Strabag International PROJECT FEATURES:Rehabilitation of Kigali-Kayonza Road (Sub-Contractor; Drainage Works) PROJECT: Ruhengeri-Gisenyi Road YEAR: 2007-2009 LOCATION: Rwanda CLIENT: Strabag International PROJECT FEATURES: Rehabilitation of Ruhengeri-Gisenyi Road (SubContractor; Drainage Works) PROJECT: Various Housing Projects. YEAR: 2006-2011 LOCATION: Rwanda CLIENT: Numerous Private Clients. PROJECT FEATURES: Construction of residential houses. PROJECT: Roka Rwanda Mining
BUILDING INDUSTRIES TO SPUR THE ECONOMY
OURPROJECTS Factory YEAR: 2009-2010 LOCATION: Rwanda CLIENT: Roka Rwanda PROJECT FEATURES:Turnkey Project. (Design and construction of the factory in partnership with TTR, Belgium Based Company)
PROJECT FEATURES: Placing - 300 Km Of Optic Fibers along GitaramaButare, Gitarama-Kibuye and part of Kigali. Construction Of related civil works.
PROJECT: Rehabilitaion Of E.I.K YEAR: 2006 LOCATION: Kigali CLIENT: Ecole International De Kigali
PROJECT: Office Building And Laboratory for Strabag-Rwanda YEAR: 2007 LOCATION: Kigali-Rwanda CLIENT: Strabag International PROJECT FEATURES: Construction Of An Office Building And Laboratory
PROJECT: Rwandatel Optic Fiber YEAR: 2008 LOCATION: Rwanda CLIENT: Rwandatel
PROJECT:Strabag Life Camp YEAR: 2007 LOCATION: Musanze-Rwanda CLIENT: Strabag International
PROJECT FEATURES: Construction of Strabag life camp in Ruhengeri PROJECT: Assainissement KarengeBugesera YEAR: 2006-2008 LOCATION: Karenge And Bugesera (Rwanda) CLIENT: Sogea Satom PROJECT FEATURES:Sub-Contractor Sogea-Satom; Construction of fountains, water tanks and placing water conduits (pipes). PROJECT: School Construction (Kirehe, Kiduha, And Gafumba) YEAR: 2005-2007 LOCATION: Southern Province Rwanda CLIENT: Minaloc (Ministry Of Local Government). PROJECT FEATURES: Construction of rural primary schools under the financing of the World Bank. (D.C.D.P Project). PROJECT: Rehabilitaion Of Kavumu Technical College YEAR: 2005 LOCATION: Southern Province (Rwanda) CLIENT: Vvob/Belgian Cooperation PROJECT: Construction Of Batis Hotel YEAR: 2012-13 LOCATION: Kigali Rwanda CLIENT: Mr. Ngamije Lambert
CONNECTING COMMUNITIES THROUGH BETTER ROADS
BUILDING BLOCKS FOR THE FUTURE
PHYSICAL ADDRESS
MAILING ADDRESS
CALL ADDRESS
WEB ADDRESS
KG 624 ST HOUSE 26,
P.O BOX 4378,
+250 788 309546
info@duocorprwanda.com
KIMIHURURA SECTOR,
KIGALI, RWANDA
+250 788 307772
www.duocorprwanda.com