GREAT LAKES CONSTRUCTION



About us Great Lakes Construction Ltd. is a registered construction company in Rwanda. We offer services in a wide range of construction-related fields both in Rwanda and within the great Great Lakes Region of Africa.



Our Vision To offer quality construction services within the Great Lakes region and beyond

Our Mission To continue to be one of the leading construction companies within the Great Lakes Region and beyond


Construction Services The Great Lakes Construction Company’s objectives is to continue to be one of the leading construction companies within the Great Lakes Region and beyond and intend to:

management and control of Client operational and business risks.

• Ensure the performance of quality services in keeping with our contracts. • Provide a work environment that allows workers to meet their professional and technical development goals and to achieve financial success for themselves and the company. • Produce a positive contribution to the society.

Great Lakes Construction Company recognizes that each Client has different service delivery requirements and unique building and user operational and business risk profiles.

Our Approach

Further, it is the strategy of Great Lakes Construction Company to be of sufficient size so that we can, by means of focusing the strengths of all our operating units, compete for the largest and most prestigious projects that befit our size throughout the Great Lakes Regions and beyond.

Great Lakes Construction Company draws on best marketplace service provider practices and capability to develop building maintenance solutions that are specifically tailored to meet the Client’s own operational and business needs. We have considerable experience in developing and implementing facilities management plans covering a diverse range of applications including rail, commercial office space, complex high services availability facilities and retail.

Service Great Lakes Construction Company approach to Construction Services is focused on the delivery of highly cost effective service delivery coupled with the

Our experience includes single occupancy sites to large property portfolios. In all cases our aim is to develop and implement building maintenance solutions that


maximize asset health, whole life cycle cost in use, minimize the risk of disruption of service delivery and potential operation income / sales through optimum planned maintenance and facilities management regimes. In performing their work, company employees subscribe to the values and objectives identified below:

Quality Each employee is responsible for quality. Quality must and does drive all activities, project and administration. It must be considered to be given. Quality is viewed from two perspectives; the actual production of quality work and perception on the part of recipients of our work, whether internal or external, that a quality product has been delivered. Substance and perception are of equal value. Most importantly, the drive for equality is passionate and continuous.

Client Orientation Clients’ needs are anticipated and actions should be targeted to satisfy their ultimate goals. Activities on behalf of our clients are also always within the envelope of our own Great Lakes Construction

Company’s Values One of the most, if the most important aspect of customer orientation is dependability such that products, schedules, appearances and clarity are never missed absent. We will always deliver on commitments.

Innovation To be a leader in our respective professions, there must never ending quest for new ideas. This quest includes the development of home grown ideas as well as the applications of concepts developed


elsewhere. New ideas include both technical process innovation as well as concepts designed to control costs with efficiency within our quality objectives as the ultimate goal.

Integrity As we strive to produce quality work oriented to a client’s mission in as efficient manner as possible, we recognize that we will face challenges. Human beings make mistakes on occasion, the concept do not always in practice as they do in theory. Progress only occurs if we are honest with ourselves and each other. Further, all our dealings whether internal or external and whether relating to a work product or administration, are conducted honestly and in a straight forward manner.

Work Style Employees communicate constantly with each other and with any one who could

have a bearing one their work. As most of our work is produced by teams, each employee works in a cooperative manner and promotes the interest of the team. Above all, they both perform their work with a confident and professional demeanor externally and internally.

Leadership Managers of projects, departments and divisions all recognize and embrace the fact that their roll extends beyond the management of people and activities. They exhibit leadership as well. Appropriate to their responsibilities, they have a vision of how to accomplish their work and are willing to lead the employees to this place. As leaders they provide and project continuous excitement, motivation and energy. Critical to the effectiveness and efficiency of leaders and managers is the understanding that their authority comes not from their position, but from colleagues’ respect for


their performance.

Passion We will embrace all the work we perform with passion. Without enthusiasm, the attention to detail which is the difference between mediocre work and quality work will be absent.

GATSIMBANYI Donat Managing Director


Our Projects Montant du contrat en FRW

Durée des travaux année d’achevement

Construction of 250 shelters

150,000,000

2 ans (1998 - 2000)

Construction of a school with 12 classrooms

14,000,000

5 mois / 1999

Water piping line of 5 km

6,400,000

2 mois/ 1999

Supervision of 8 sites for Microrealisation U.E

7,800,000

11 mois/ 1999

GATSIMBANYI Donat

Residential house in Gisenyi

58,000,000

8 mois/ 2005

ZIMULINDA J.C

Residential house

37,000,000

4 mois/ 2003

KAKESA Masumbuko et Hotel AMANI

Commercial house Hotel AMANI in GOMA

650,000,000

9 mois/ 2004

KAKESA Masumbuko

Consultancy for 10 appartements project in GOMA

2,500,000

1 mois/ 2002

Maitre de l'ouvrage

A.S.e.S Financement U.E


Maitre de l'ouvrage

Montant du contrat en FRW

Durée des travaux année d’achevement

ALISEI UNICEF

Construction of 27 classrooms, 42 latrines, 4 point of water access

105,840,000

8mois/ 2003

SODERU U.E

Construction of MABANGA Health center

22,400,000

4 mois/ 2003

Construction KATOYI Maternity

7,800,000

2 mois/ 2003

Construction of the fence for KATOYI HEALTH CENTER

12,000,000

1 mois/ 2003

Construction of drainages, bridges in GOMA Town

680,000,000

9 mois/ 2003

GEAD

Construction of the building FOYER SOCIAL

16,800,000

5 mois/ 2004

ATLAS LOGISTIQUE/ Ecole Kinyumba et Furaha

Construction of KINYUMBA and FURAHA Schools (12 classrooms, and 12 toilets)

63,840,000

5 mois/ 2003


Our Projects Maitre de l'ouvrage

Montant du contrat en FRW

Durée des travaux année d’achevement

Cellure Microréalisation/ Ville de Gisenyi

Laber for the construction of kiosques in MBUGANGARI market

3,600,000

3 mois/ 2004

GTZ - FAAB/ Butare

Construction of offices, and a storage site

26,000,000

5 mois/ 2002

District de GASIZA/ FER

Rehabilitation of the road GAFUNZO RUREMBO ( Road clearing and bridges)

65,800,000

6mois/ 2005

District de NYABIHU/ RSSP

Construction of VUNGA market

48,000,000

8 mois/ 2006

District de RUBAVU/ PDRH

Construction of SHEMU and UBUMWE schools

54,000,000

2007

WORLD RELIEF/ GOMA

Construction of NEW HOPE center for youth in GOMA

33,600,000

7 mois/ 2006

Roger NDIZERA

Construction of a residential VILLA in Gisenyi

110,000,000

8 mois/ 2007


Maitre de l'ouvrage

Montant du contrat en FRW

Durée des travaux année d’achevement

Patrick NKUSI

Construction of a residential VILLA in Gisenyi

56,000,000

7mois/ 2007

KOBIL PETROLEUM

Rehabilitation of 10 petro-stations, and the headquater for KOBIL

80,000,000

5 mois/ 2007

District de NYABIHU

Construction of NGANDU and NYAMITANZI Schools

76,000,000

3 mois/ 2007

Banque commerciale du Rwanda (BCR)

Reconstruction of BCR-GISENYO

89,000,000

4 mois/ 2008

District de RUBAVU

Construction of BIHUNGWE and YUNGWE schools

77,000,000

4 mois/ 2008

BOND TRADING

Rehabilitation of EX OPROVIA building, fence, and residential house

37,541,000

2 mois/ 2008


Our Projects Maitre de l'ouvrage

Montant du contrat en FRW

Durée des travaux année d’achevement

Hopital Gisenyi

Construction of the pharmacy

11,750,000

4 mois/ 2008

BOND TRADING

Rehabilitation of EX OPROVIA building, fence, and residential house

37,541,000

2 mois/ 2008

Hopital Gisenyi

Construction of the pharmacy

11,750,000

4 mois/ 2008

BOND TRADING

Rehabilitation of MTN Building in Nyarutarama

18,500,000

1 mois/ 2009

GATSIMBANYI Donat

Construction of a residential house

110,000,000

7 mois/ 2008

District de RUBAVU/ AQUAVIRUNGA

Water piping, tanks, selling point of YNGWE

140,000,000

6 mois/ 2008

SODERU/U.E

Construction of BUKIMA SCHOOL, 9 classrooms

89,000,000

4 mois / 2010


Maitre de l'ouvrage

Montant du contrat en FRW

Durée des travaux année d’achevement

SODERU/U.E ACF - ICCN

Construction of schools, offices building in Rumangabo

250,000,000

9 mois / 2010

AQUAVIRUNGA

Water piping, tanks, selling point of MUTERA

84,581,848

6 mois/ 2010

SODERU/U.E

Water piping, tanks, selling point of RUMANGABO

255,429,000

4 mois / 2010

NDIZERA Roger

Residential villa in Goma

246,500,000

6 mois/ Decembre 2010

ULK GISENYI

Complexe of classrooms, offices, IT lab

1,200,000,000

9 mois/ JANVIER 2011

KOBIL BUJUMBURA

Petro-station ROI KHALED Petro-station NGOZI

20,000,000

2 mois/ 2010


Our Projects Maitre de l'ouvrage

Montant du contrat en FRW

Durée des travaux année d’achevement

AMUR RUBAVU

Construction of 6 classrooms, and a health center

145,000,000

5 mois / 2010

Banque Populaire du Rwanda

Construction BPR RUBAVU Branch

431,000,000

8 mois/ 2012

BRALIRWA

Retaining concrete wall

65,858,735

2 mois/ 2013

AMUR RUSIZI

Construction of College CIB in BUGARAMA

223,000,000

9 mois/ 2014

TIGO

Construction of 14 service centers

27,940,946

1 mois/ 2015

TIGO

Offices partitioning in NYARUTARAMA and MUHIMA

39,760,000

3 weeks/ 2015

UNHCR

Construction of road and plot demarquations in MAHAMA CAMP

23,600,000

1 mois/ 2015


Maitre de l'ouvrage

Montant du contrat en FRW

Durée des travaux année d’achevement

ARC

Construction of UNICEF tentes, and RUBHALLS

7,500,000

1 mois / 2015

ARC

Construction of 377 shelters in Mahama camp

226,158,000

2 mois/ 2015

ARC

Construction of a laterite road in Mahama camp

101,450,000

1 mois/ 2015

SUISSCONTACT

Construction of Hangars in OUEST Province, district KARONGI and RUTSIRO

69,570,000

3 mois/ 2015

ACTIONAID

Construction a TVT in GITESI - KARONGI

45,345,000

3 mois/ 2015

ECOBANK

Construction ECOBANK-CHIC Branch

73,345,900

1 month/ 2016


Our Clients The Great Lakes Construction has a growing client base within the East and Central Africa region. Some of our clients include:



GREAT LAKES CONSTRUCTION LTD. Address: Tel: E-mail: Website:

B.P 3473 KIGALI +250 788 305282, gatsim_don2@yahoo.fr www.glconstructions.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.