1 minute read

MY INVOLVEMENT:

Next Article
04. ASHRAYA HOMES

04. ASHRAYA HOMES

I was involved in the working drawings for Plot 25 (Type A). I drew working drawings of architecture and structure under the guidance of my supervisor. The working drawing is done for construction, instructing the site supervisors and workers to construct the building according to the design. The architecture drawing depicts exterior of the building as well as the spaces contained within it. The structure drawing describes the building’s requirements and construction process.

Advertisement

WHAT I LEARNT?

• Preparation of working drawings and their requirements.

• Details required for construction.

• Each details are required for the exact construction on site.

• The process of construction in real practice.

• Different types of drawing requirements, all equally meaningful.

• Drafting skills improvement.

This article is from: