Sarah Elstien
Sarah R. Elstien Experience January 2018 - current
Graduate Teaching Assistant, Introduction to Modern Archtiecture University of Kansas - Lawrence, Kansas Author and post class notes, aid in the creation of tests, grade tests, hold office hours, communication link between the professor and students.
May 2017- January 2017
Architecture Intern Tolila + Gililand Atlier d’Archtiecture - Paris, France
Material testing, 3D modeling and graphics for a variety of projects including High End Watch Retailer, Ivry Housing Project and a Maritime Museum.
August 2016 - May 2017
Software Tutor, School of Architecture University of Kansas- Lawrence, Kansas
Teach software classes and sit lab office hours to assist students.
May 2016 - August 2016
Architecture Intern BNIM - Kansas City, Missouri
Contribute to programming and pre-design phase of a high school addition and renovation. Create diagrams and participate in client program negotiations.
Education
2
2018
Master of Architecture Candidate University of Kansas - Lawrence, Kansas AIAS 2013-current ARCH STUCCO Vice President 2017-current Architecture School Tour Guide 2016 - current Mentorship Program 2015- Current Honor Society Member 2015- Current Varsity Rowing Team 2013-2014
Fall 2017
Ecole Nationale SupĂŠrieure d'Architecture Paris-Val de Seine Paris Work-Study
Fall 2015
Study Abroad Semester in Copenhagen Danish Institute of Study
@
201-572-9621
selstien@gmail.com
11 Kentbrook Ter. Kinnelon, NJ 07405
Skills Software Photoshop Illustrator Indesign Revit Rhino
Sketchup Unreal Engine Bluebeam AutoCad Microsoft Products
Professional Problem Solver Strong Work Ethic Time Manager Creative
Communicative Organized Motivated Confident
Interests 1 5 7
Where I Lived and Traveled
3
4
Table of Contents Lenticular
6 - 19
The Meeting Point
20 - 27
Creating a Home
28 - 33
The Response
34 - 39
Living Experience
40 - 43
Filling The Void
44 - 47
Professional Work
48 - 53
Sketches
54 - 55
Photography
56 - 57
5
6
Lenticular I
Courthouse
Location
Burnet, Texas
Date Completed
Spring 2017
Contribution
Partner Project
Programs Used
Revit, Rhino, Photoshop, Illustrator
My partner and I worked together to draw inspiration from natural elements and combine them with programmatic needs in order to create a comfortable yet socially challenging courthouse. The program itself is complex, requiring the combination of 3 types of programs - public, private, and secure - which all need separate entrances and circulation ultimately leading to the courtroom. We wanted to reflect the program in the form and material in order to indicate and associate the programmatic use for the visitors of the space. The courtrooms and similar programs are rigid and orthogonal. The public space is open and slightly chaotic, reflecting the attitudes of those spaces. In contrast, the secure areas of the program; designed for prisoners, would be apparent to all the patrons as a large black concrete mass that coils around other elements. The public space is intended to be able to house the multitude of emotions seen there every day, from the anxiety of a court appointment, to the joy of a victory, or the disappointment of a loss. The forest-like atmosphere replicated through the structural components maintains an open space while obstructing sight lines for privacy. Utilizing these elements, we challenge the hierarchy of the people using the courthouse.
7
1
2
Seperation of Public and Private
3
Lenticular Cloud
Forest Structure
8
Reactionary F
In a courthouse, it can be easy to tell who has the power and authority. Within the design, there is intent to visually and emotionally balance the power by displaying the program which is usually hidden and allow areas of privacy in the public realms. In taking these measures, we provide a sense of comfort for the visitors and a sense of wary for those in power.
Form Balancing Power
4
Highlighting Courtrooms
5
Exposing Secure Program
6
Securing the Public Spaces
9
Site Plan 1” = 100’ 10
First Floor
Dep. Office
Dep. Office
Sally Port Court Security Officers Room
Reception
Managers Office
Staff Lounge
Storage/ Workroom
Firearm Vault
Pre-Trial Officer
Officer In Charge
Pre-Trial Officer
Attorney Interview Room
Lobby
Attorney Interview Room
W/C
Officers Office
W/C
W/C
Firearm Vault
Reception Work Area
Lobby
Lobby
Cashier Room
Admin. Office
Open Work Area
Paralegal
Reception Work Area
Jury W/C
Jury Assembly Room
W/C
Staff Lounge/ Conference
Shared Work Room
Computer Tell/Data
Lobby
W/C Managers Office
Mechanical Chase Data Elec. Closet Closet
Records Storage
Lobby
Records Storage
Paralegal
Storage and Workroom
Urinalysis Toilet
Urinalysis Toilet
Assistant District Attorney
Staff W/C
Urinalysis Lab
Urinalysis Lab
Admin. Office
Firearm Vault
W/C
File Room
Records Storage
Officers Office
Assistant District Attorney
District Attorney
Trial Prep Con. Room
Jury W/C Jury Service and Vending
Mechanical Chase
Jury Check In
Storage
Second Floor Attorney Conference Room
Court Security Officer
A/V Stor.
Sound Lock
Attorney Conference Room
A/V Attorney Stor. Conference Room
Sound Lock
A/V Stor.
Sound Lock
Mechanical Chase
Magistrate Courtroom
Sound Lock
District Courtroom
Sound Lock
Holding Cell
Holding Holding Cell Cell
Holding Cell
Sound Lock
W/C W/C Magistrate Judges Office/ Conference
W/C
Sound Lock
Reception Shared Work/ Kitchenette
Sound Lock
W/C
W/C
District Judges Office/ Conference
Jury Room
Data Elec. Closet Closet
Magistrate Courtroom
Sound Lock
Sound Lock
Reception
Sound Lock
W/C
W/C
W/C
Sound Lock
Reception W/C
Jury Room Shared Work/ Kitchenette
Mech. Chase
W/C
W/C Jury Room
Shared Work/ Kitchenette
Law Clerk
Magistrate Judges Office/ Conference
Third Floor
Mech. Chase Data Elec. Closet Closet
Isolation Holding Cell
Holding Cell
Holding Cell
Holding Cell
Holding Cell
Prisoner Processing
11
12
13
North / South Secion
14
First State Bank Of Burnet
15
Typical Roof Parapet Detail 1’ = 3/4” Parapet Flashing Sloped Aluminum Cap Water Control Membrane
Silicone Tapered Rigid Insulation
Typical Window Detail 1’ = 3/4” Metal Stud Plywood Sheathing Water Control Membrane Vertical Z-Flashing attached to Metal Stud with Metal Screw Aluminum Z Clip attached to Z-Flashing 5” Rigid Insulation Flashing Tape Metal Flashing
16
Office Wall Secion 1” = 8’
Chambers/Jury Roof Chambers/Jury 29’Roof - 0” 29' - 0"
Level 2
Level 2 15' - 0" 15’ - 0”
Gypsum Wallboard Metal Stud Wall Plywood Sheathing Water Barrier Rigid Insulation Air Gap Limestone Finish Level 1 0' - 0"
Level 1
Wall Foundation 0’-3'--0” 0"
Wall Foundation -3’ - 0”
17
Typical Detail Of Glass Cloud to Roof Connection
18
Typical Detail Of Glass Cloud to Floor Connection 19
20
The Meeting Point I
Trekroner Visitor Center
Location
Copenhagen, Denmark
Date Completed
Fall 2015
Contribution
Group Research, Individual Project
Programs Used
Revit, Rhino, Photoshop, Illustrator
The Copenhagen Harbor is in the process of evolving from an industrial harbor to a recreational area with harbor baths, living spaces, and culture to the water’s edge. Trekroner is a sea fort at the entrance to the Copenhagen harbor and is one of three artificial islands created to defend the entrance of Copenhagen’s harbor. As such a historic landmark so close to the city center, it is trafficked daily by both tourists looking to get a good view of the city from the water and by locals looking to have a picnic away from the city. This project provides an additional asset to a unique destination, weaving in and out of the island to form different types of spaces and experiences. The multitude of functions supported include docking, changing, eating, swimming, jumping, and viewing. Through this design inspired by the Danish vernacular, there is a creation of a common meeting point for tourist and local, adventurer and homebody, young and old.
21
Danish Vernacular
Pull
The Danish Vernacular roofs in Copenhagen have a high pitch due to the heavy rainfalls. In a model making exercise, this common shape was extruded into separate strips that would transform and weave in and out of the island to create different and unique spaces. The shape initially contained a religious quality. In cutting the top, a more appropriate profile was made, mimicking the forms of the other 3 buildings on the island. The strips were manipulated to fit the program and creating a form of their own. The small enclosed seating areas for contemplation were formed in the pulling away of the planes and the folding on the exterior created a series of platforms for viewing, docking, and jumping into the sea.
22
Slice / Cut
Adapt for Program
23
Kay
ak
24
and
Sai
lbo
at
Official Tour
Docking
2
3
Viewing
1
Arriving 25
26
27
28
Creating a Home I
Mixed Use Building
Location
Kansas City, Kansas
Date Completed
Fall 2016
Contribution
Individual Project
Programs Used
Sketchup, Revit, Photoshop, Illustrator, Unreal Engine
Kansas City, Kansas hosts the University of Kansas Medical School. There is a large demand in housing both from students looking for a short commute and the elderly looking to be near a doctor. This coveted plot directly across from the Medical School strives to provide needed housing and promote the intentions of the school for healthy living. Creating a Home does not focus solely on just housing but what a community needs in order to have a sense of place. Creating a healthy community includes establishing amenities for a healthy lifestyle such as a day care, gym, grocery store, office space and communal outdoor space. In order to have a sense of belonging this design creates a sense of privacy within the home. Apartments are arranged to promote connections with neighbors. Sunlight, and harnessing it, played a key role in the shape of the building. Outdoor spaces are emphasized to take advantage of the sunlight and promote healthy living.
29
1
2
Enclose Create a courtyard to optimize surface area
3
30
Punch Allow amou enter
h w the maximum unt of sunlight to the housing units
4
Grade Establish each housing unit to have outdoor space 5
Inscribe Form a human scale by breaking up the surface at the ground floor
6
Carve Provide outdoor space to apartments that do not have a grade and further break the facade
31
Student Housing
3 Bedroom [3]
Square Footage: 1,650 Maximum Capacity: 7 1:10
Social Housing
4 Bedroom [3]
Square Footage: 2,204 Maximum Capacity: 8 1:10
32
Studio [21]
Square Footage: 750 Maximum Capacity: 2 1:10
2 Bedroom [27] Square Footage: 1,400 Maximum Capacity: 4 1:10
1 Bedroom [23]
Square Footage: 820 Maximum Capacity: 2 1:10
2 Bedroom [21]
Square Footage: 1,000 Maximum Capacity: 5 1:10
33
34
The Response I
Tulane Culinary School
Location
New Orleans, Louisiana
Date Completed
Spring 2015
Contribution
Individual Project
Programs Used
Sketchup, Revit, Photoshop, Illustrator
At Tulane University, the medical program is expanding to include nutrition courses, complete with cooking classes in order to learn healthy cooking and lifestyles. At Tulane, they feel the medical practice is expanding to not only treat patients but to promote healthy living in response to the growing poor nutrition and lifestyles of this time. This project works within the preexisting fabric of the city and establishes a connection back to Tulane University. The goal of this project is very similar to the overall goals of the school - promoting healthy living to the medical students attending classes. There is a secondary attempt to inspire the other students and the rest of the community, showing that integrating healthy decisions into your day is possible, easy, and fun. These objectives were accomplished by integrating the surrounding community, creating easy access to the site, establishing spaces that encouraged social interaction, and highlighting other amenities that encourage a healthy lifestyle.
35
Nightlife Nightlife BarsBars and andRestaurants Restaurants
Ammenities
Amenities Landmarks Landmarks Gyms Gyms Grocery GroceryStores Stores
Marie Laveaus House of Voodoo St. Louis Cathedral Jackson Square Law Library of Louisiana
n rbo
Bou
Residential Residential Aparnent Buildings Appartment Buildings
Transit Parkings Transit Streetcar (Blue Line) Streetcar Parking (Red Line) Streetcar (Blue Line) Streetcar (Red Line)
36
et
Stre
Incoming Housing Development
Zone to Accommodate Community Community Garden Gym Farmers Market
Zone to Accommodate Learning Teaching Kitchens Labs Library
Draw in the Public Streetcar Stop Restaurant Bakery Bar
Flexible Public Space Seating Steps Flexible Stage Space Farmers Market Space Sculptural Seating
37
Group Room
Group Room
Group Room
Group Room
Community Garden
Library Computer Lab
Classroom
Locker Room
Gym Office
Classroom Demo Lab
Teaching Kitchen Kitchen
Office
Office
Locker Room
Office
Staff Lounge Storage
Student Lounge
Kitchen
Storage Restaurant Bar
Teaching Kitchen
Storage
Storage
Kitchen
Kitchen Bakery Storage
Teaching Kitchen
Storage
Kitchen Mechanical Teaching Kitchen Kitchen
Storage
Iberville Street
38
Loading Area
Canal Street
na lS
et Str ee t
tre t
ee
Str
Str
B
Ca lle
sin
at
Cr oz
et
tre
eS
Tre m
tre
at S
Cr oz
rvi
Ba
t
ree
Ibe ee t
39
eS
Tre m
et
t re
40
Living Experience I
Eco Living Machine Center
Location
Lawrence, Kansas
Date Completed
Fall 2014
Contribution
Individual Project
Programs Used
Revit, Photoshop, Illustrator
An Eco Living Machine processes black water into gray water using filtration by plants and mechanical filters. This project aims to establish a living machine on the University of Kansas to educate students about the difficult and time consuming process of filtrating water and to promote awareness about water conservation using a sustainable filtration process. The tanks are visible and on display to create a feeling of walking through the mechanics of the filtration process. Any tours of the facility can be taken up to the classroom which overlooks the tanks to encourage further study. In order to promote water conservation, the roof drains to one location and then into a collection tank so that it can then be filtered by the machine. This whole cycle is put on display to be examined and celebrated.
41
Primary Tank
Equalization Tank The planted tanks alternatively fill and drain, supporting a diverse, productive micro-ecosystem below the surface
Stage 2
Stage 1
Wastewater enters the primary tank and solids settle and begin to degrade
Stage 3 A unique set of valves and pumps maximizes the use of gravity to drain and fill the series of cells, minimizing energy consumption
42
Microscopic plants and animals grow on gravel filling the cells. They consume the waste in the water, accelerating the natural process
Polishing Tank
Water goes to the equalization tank to and evens out through periods of low and high pressure
Equal. Tank
Stage 1
Stage 1
Primary Tank
Stage 1
Stage 1
Polish Tank
Water passes through final filtration disinfection known as “polishing� and water can recirculate when needed
Office Office
Classroom
43
44
Filling the Void I
Mixed Media Museum
Location
Copenhagen, Denmark
Date Completed
Fall 2015
Contribution
Group Research, Individual Project
Programs Used
Sketchup, Revit, Photoshop, Illustrator
Copenhagen’s sea forts and fortifications are in the process of evolving from historical military landmarks to recreational areas with culture. Filling the Void focuses on creating a new archive of art, bridging the gap between art and education. The museum studies, conserves, and presents significant works of art across all times and cultures in order to connect people to creativity, knowledge, and ideas. The Museum consists of four main galleries Memory, Action, Matter, and Object, transforming the historic Kastrup Fort into an area open to the public to learn about famous pieces and present local artists work. Each gallery represents a different media. Strategically placed courtyards allow patrons to walk outside and enjoy sculptures while also giving them hints to what is in the next gallery; creating an allusion of seeing through both time and media to make connections that otherwise, might not have been visible.
45
46
47
4
3
2
1
0
-1 48
Professional Work I Location
Paris, France
Date Completed
Ongoing
Contribution
Design Team
Programs Used
Rhino, Illustrator, AutoCAD
Tolilia + Gilliland
The studio completed a series of work for a high end watch retailer over the last several years. I participated in the re-designing of the atrium space. There were two major aspects to be considered; the first was a grand central staircase and the second was the creation of a new glass roof over the atrium space. My responsibility was to model the staircase and glass roof components using Rhino. Once I had the staircase modeled, I consulted with my superiors on the options for the handrail. I indicated critical details that were unforeseen by the design team in the plans and sections but were visible in the model. I also modeled the two glass roof options. The first roof option was traditional, reflected the historical aspect of the building, and was similar to the existing roof with more structural elements. The second roof option was modern and slim, with fewer structural elements, and reflected the column structure in the atrium. I put together a combined model to export and send to our visualization consultant. In order to facilitate decision making on three open items, I created a diagrammatic axon. The open items requiring decisions were; the column size and shape next to the atrium, the spiral stair and handrail options, and the glass roof and its structure.
49
50
Professional Work I Location
France
Date Completed
Ongoing
Contribution
Design Team
Programs Used
Rhino, Illustrator, AutoCAD
Tolilia + Gilliland
The studio entered a competition for a mixed use building in France. The program was very interesting as it incorporated dorms for music school students, offices, a laser tag facility, a brewery and tasting room, parking, and outdoor communal space. Incorporating all of these programmatic elements while meeting the height restrictions was challenging. Establishing a sunken shared outdoor space allowed us to address the site difficulties. The project manifested into an oversize pergola structure providing a cohesive space for the diverse program and establishing a sense of place. My task on this project was to create a detailed section perspective communicating the program without utilizing any titles. The section drawing was done during the design phase and was used as a tool to convey the space with more ease to the clients. As the shape and design of the project evolved, the drawing evolved and required constant updating with strict time constraints until the completion of the final drawing for the competition entry.
51
NORCLAY
OLD MAIN 88,000 SF
ADDITION 144,000 SF
52
Professional Work I
BNIM
Location
North Kansas Ciity, Missouri
Date Completed
Ongoing
Contribution
Programming
Programs Used
Revit, Illustrator, Indesign, Bluebeam, Excel
Upon starting my internship, I was assigned to a high school addition and renovation in North Kansas City that BNIM had just been awarded. During the summer, this project was in the programming phase. I performed studies to allow the clients to visually understand the possibilities based on their “wish list.” I researched and created a database of sizes of different departments of other area high schools. The data allowed us to compare the spaces the school sought against others in order to have an informed discussion. I generated a series of studies of the program that the school desired and compared it to our design team ideas to condense the program and make the project more affordable as seen below. I assisted in leading client meetings in which we had hard discussions about limiting programs and negotiating options in order to create a high quality project that accommodated its necessary use while reducing cost.
Music Industrial/Tech Auditorium Industrial + PLTW Auditorium Department Industrial Tech.Tech. +Auditorium PLTW MusicMusic Department Industrial Tech. Industrial + PLTW Tech. + PLTW tment Music Department
Athletics Auditorium Auditorium Gym 386’ - 0”
Ense. Edit Room
Percussion Storage
Commons/Break Out Space
Woods
Home Maintenance Finish Room
Dep. Studio
Vocal
Robotics/Metals Ense. Edit Lab
Engineering Lab
Room
Storage
CNC Lab
CAD Computer Science Lab
Woods
Home Maintenance Finish Room
Dep. Studio
Dep. Studio
Storage
CNC Lab
Robotics/Metals Lab
Engineering Lab
Woods Storage
Receiving Area
Finish Room
Dep. Studio
Storage
CAD Computer Science Lab
Woods Storage
W.C.
Storage
Receiving Area
Woods Home Maintenance AuditoriumHome Maintenance Finish (Seats 775) Dep. Dep. Room
Studio
Orch. Pit
Studio
Scene W.C. Shop
Receiving Area
Control Room
Stage
Dep. Studio
Dep. Studio
Auditorium (Seats 775)
Prop Storage
TV Studio Edit Rm.
TV Studio Edit Rm.
Ticket
CNC Lab
TV Studio and Control Room
Robotics/Metals Engineering Lab Lab
Robotics/Metals Lab
Black Box
Control Room
CNC Lab Dressing Room
Storage
Engineering Lab CAD Computer Science Lab
Piano Stor.
Makeup Room
Costume Ticket StorageTV
Storage
Studio and Control Room
Theater
Theater
CAD Prac. -Rm. Prac. Rm. Computer Science Lab
Theater Library
Theater Office
Stage
Orch. Pit
Makeup Room
Piano Stor.
Locker Room
Control Room
Auditorium (Seats 775)
TV Studio Edit Rm.
TV Studio Edit Rm.
Theater Theater Prac. Rm. Prac. Rm.
Theater Library
Theater Athletic Office Office
W.C. W.C.
Prop Storage Costume Storage
Locker Room
Black Box
Control Room
Officials PE PE Ticket Locker Athletic Staff Athletic Staff TV Room W.C. W.C. Studio and Control Athletic Room Office
Dressing Room
Theater Classroom
Locker Room
53’ - 0”
Woods
Woods Storage
Receiving Area
Dressing Room
Locker Room W.C. Scene W.C. Shop
85’ - 0”
Storage
W.C.
53’ - 0”
Woods Storage
Orchestra Vocal
Dressing Room Storage
W.C.
Locker Room
175’ - 0”
Voc. Office
Voc. Office
53’ - 0”
Prac. Room
53’ - 0”
Prac. Room
100’ - 0”
BandVocal
Orchestra
Prac. Prac. Prac.Voc. Prac. Prac. Prac. Prac. Prac. Music Library Music Library Room Room Room Room Room Room Room Office Room Prac. Prac. Room Room Prac. Prac. Room Room Prac. Prac. Room Room Prac. Band Orchestra Prac. Room Room Robe Robe Storage Storage Orch. Orch. Office Office Band Band Office Office Instrument Instrument Ense. Percussion Commons/Break + Marching Edit + Marching Ensemble Storage Out Space Ensemble Band Band Room Storage Storage
Music Library
100’ - 0”
Music Library
100’ - 0”
Prac. Room
146’ - 0”
146’ - 0”
146’ - 0”
381,443 sf
Commons/Break Out Space
Prac. Room
100’ - 0”
BandVocal
Percussion Storage
381,443 sf
Prac.Voc. Prac. Prac. RoomOffice Room Room Prac. Room Prac. Room Prac. Room Prac. Room Robe Storage Orch. Office Band Office Instrument + Marching Ensemble Band Storage
Music Library
146’ - 0”
PE Offices
PE Offices
Athletic Issue
Ticket TV Studio
Theater Classroom Community Room
and Athletic Control Room Storage
Locker Room Dressing
Auditorium Orch. (Seats 775) Pit
Makeup Room
Piano Stor.
Stage
Piano Makeup Theater Theater Theater Theater Stor. Room Library OfficePrac. Rm. Prac. Rm.
Concessions
AUX. Gym
Black Box
Prop Storage
Costume Storage Dressing Theater Room Bleacher Seating Classroom 2,000 people
Theater Theater Prac. Rm. Prac. Rm.
Athletic Director General Office
Scene Shop
Black Box
Main Competition Stage Orch. Gym Pit Prop Storage
Training Room Dressing Laundry Room
PE Storage
Athletic Director Office
Dressing
Room Scene Shop
Room
381,443 sf
Music Library
193’ - 0”
193’ - 0”
193’ - 0”
381,443 sf
381,443 sf
193’ - 0” 280’ - 0”
280’ - 0”
280’ - 0”
Costume Storage
Theater Library
Press Box
Theater Office Bathrooms
Fitness Room
Wrestling Room
AUX. Gym
Theater Classroom
Dance/ Multipurpose Room
Percussion Storage
Robotics/Metals Lab
Engineering Lab
Ense. Edit Room
CNC Lab
Storage
CNC Lab
Robotics/Metals Lab
Storage
Receiving Scene Area
(Seats 600)
CNC Lab
Ticket TV
Studio Robotics/Metals Engineering and Control Lab Lab Room
Dep.
Dep. Studio
W.C.
Black Box Control Room
Dep. Studio
StageStudio
Orch. Pit
Prop Storage
CNC Lab
Storage
Engineering Lab
W.C.
Shop
Home Maintenance
Finish Dep. Room Auditorium Studio
TV Studio Edit Rm.
Robotics/Metals Lab
Engineering Lab
Control Room
Storage
Storage
Costume Storage
Dressing Room
Theater Theater Library Office
Piano Stor.
TV Studio Edit Rm. Ticket TV Studio and Control Room
Auditorium (Seats 600)
230’ - 0” 85’ - 0”
Fitness Room
Dressing Room
Stage
Orch. Pit
Black Box
Prop Storage Costume Storage
Dressing Room
Theater Theater Library Office
Piano Stor.
Auditorium Athletic (SeatsOffice600)
Control Room
Orch. Stage Training 600) Pit (Seats Room
Athletic Storage
Ticket
Ticket
TV Studio and Control Room
TV Studio and Control Room
Prop Storage Costume Concessions Storage
Laundry
Dressing Room
Dressing Room
Officials Locker Room
Athletic Director General Office
PE Offices
PE Offices
PE Athletic Staff W.C.
PE Athletic Staff W.C.
Theater Theater Library Wrestling Office
Piano Stor.
Black Box
Stage Prop Storage Bleacher Seating 1,700 people Costume Press Box Storage
Orch. Pit
PE Storage
Athletic Issue
Main Competition Gym Scene Shop Black Box
Room Scene Shop
Auditorium
TV Studio Edit Rm.
Athletic Office
TV Studio Edit Rm.
230’ - 0”
Dressing
Dressing Room
Locker W.C. Room
W.C.
Control Room
Locker Locker Room 230’ - Room 0”
W.C.
W.C.
Scene Shop
85’ - 0”
Woods Home Maintenance Finish Room
Dep. Studio
Dressing Receiving Room Area
85’ - 0”
Vocal
Dep. Studio
Storage
W.C.
Woods
Home Maintenance Finish Room
Dep. Studio
Woods Storage
W.C.
162’ - 0”
Woods Dep. Studio
Woods Storage
Receiving Area
85’ - 0”
Orchestra Vocal
Storage
85’ - 0”
Home Maintenance Finish Room
Woods Storage
Receiving Area
100’ - 0”
Woods
Storage
100’ - 0”
90’ - 0”
90’ - 0” Ense. Edit Room
230’ - 0” Voc. Office
Voc. Office Woods Storage
100’ - 0”
BandVocal
Orchestra
Prac. Prac. Prac.Voc. Prac. Music Library Music Library Room Room Room Office Room Prac. Prac. Room Room Prac. Prac. Room Room Prac. Prac. Room Room Prac. Band Orchestra Prac. Room Room Robe Robe Storage Storage Orch. Orch. Office Office Band Band Office Office Instrument Instrument Ense. Percussion + Marching + Marching Edit Ensemble Ensemble Storage Band Band Room Storage Storage
Music Library
100’ - 0”
Music Library
302,000 sf
Percussion Storage
302,000 sf
BandVocal
280’ - 0”
280’ - 0”
280’ - 0”
Prac.Voc. Prac. RoomOffice Room Prac. Room Prac. Room Prac. Room Prac. Room Robe Storage Orch. Office Band Office Instrument + Marching Ensemble Band Storage
Music Library
Locker Room
Dance/ Multi-
Room
Theater Theater Library Officepurpose
Piano Stor.
302,000 sf
Music Library
193’ - 0”
193’ - 0”
193’ - 0”
302,000 sf
302,000 sf
268’ - 0” 193’ - 0”
Room
Instrument + Marching Band Storage
Ensemble
Storage
Ensemble
Robotics/Metals Lab
Engineering Lab
Dep. Studio
Finish Room
Storage
Robotics/Metals Lab
CNC Lab
Woods
Dep. Studio
Engineering Lab
Woods
Dep. Studio
Woods Storage
Storage Receiving Area
Finish Room
Control Room
Dep. Studio
Dep. Studio
Auditorium (Seats 600)
Stage
Orch. Pit
Prop Storage
Black W.C. Box W.C.
Control Room Piano Stor.
Storage
Storage
TV Studio
and ControlLab Room
Theater Office
Scene Shop
W.C. W.C.
Dep. Studio
Robotics/Metals Edit Rm. Engineering TV Lab Lab StudioCNC
Robotics/Metals Lab
CNC Lab
Theater Office
Engineering Lab
TV Studio Edit Rm.
Costume Storage
CNC Lab
TV Studio and Control Room
Auditorium (Seats 600)
85’ - 0”
Fitness Room
Stage
Prop Storage
Locker W.C. Room W.C.
W.C. Black Box W.C.
Control Room Piano Stor.
Auditorium Athletic (Seats Office 600) Athletic Office
TV Studio Edit Rm.
Costume Storage
Locker Locker Room207’ - 0”Room
207’ - 0”
Theater Office
Theater Office
Scene Shop Orch. Pit
Locker Room
85’ - 0”
Finish Room
Storage Receiving Area
85’ - 0”
Woods
Dep. Studio
Woods Storage
207’ - 0”
153’ - 0”
Dep. Studio
Storage Receiving Area
85’ - 0”
Finish Room
Woods Storage
85’ - 0”
Woods Vocal
Storage Receiving Area
100’ - 0”
Woods Storage
100’ - 0”
90’ - 0”
90’ - 0”
Instrument Percussion + Marching Storage Band Storage
Percussion Storage
Ensemble
Vocal
Prac. Room Prac. Room Prac. Room Robe Storage Vocal Office Band Office
100’ - 0”
Band
Vocal
Music Library
Prac. Room Prac. Room Prac. Band Room Robe Storage Vocal Office Band Office
284,020 sf
Instrument + Marching Band Storage
Music Library
Music Library
100’ - 0”
Music Library
Prac. Room Prac. Room Prac. Room Robe Storage Vocal Office Band Office
Band
Percussion Storage
284,020 sf
Music Library
207’ - 0”
Control Room
Athletic Storage TV Studio Edit Rm. TV Studio and Control Room
TV Studio and Control Room
PE Athletic Staff W.C.
Auditorium Stage Training (Seats 600)
Orch. Pit
PE Storage
Orch.
Room
Pit Prop Storage
Laundry
Costume Storage
Officials Locker Room
Athletic Director General Office
PE Offices
PE Offices
PE Athletic Staff W.C.
Main Competition Gym Scene Black Box Shop
Scene Shop
Piano Stor.
Black Box
Stage Bleacher Seating Prop Storage 1,500 people
Piano Stor.
Press Box
Concessions
Costume Storage
Wrestling Room
284,020 sf
Music Library
100’ - 0”
100’ - 0”
100’ - 0”
284,020 sf
284,020 sf
268’ - 0” 100’ - 0”
179’ - 0”
179’ - 0”
179’ - 0”
Dance/ Multipurpose Room
Ensemble Robotics/Metals Lab
Engineering Lab
Robotics/Metals Lab
Robotics/Metals Lab
Engineering Lab
Dep. Studio
W.C.
Finish Room
Robotics/Metals Engineering Lab Lab
Dep. Studio
Auditorium (Seats 600)
Control Room
Theater Office
Scene Shop
Stage
W.C.
Black Box W.C.
Prop Storage
Engineering Lab
Piano Stor.
Control Room
Costume Storage
Auditorium (Seats 600)
Fitness Room
85’ - 0”
100’ - 0”
192’ - 0”
Scene Shop
Stage
Locker Room
Theater Office
W.C.
W.C.
Black Box W.C.
Prop Storage
Athletic Storage
Theater Office
Control Room
Piano Stor.
PE Offices
PE Offices W.C. PE
PE
Locker Room 192’ - 0”
192’ - 0” Main Competition Gym Scene Shop
Athletic Office
Costume Storage
Athletic Office
Athletic Director General Office Officials Locker Room
Black Box
Bleacher Seating Stage Prop Storage 1,500 people
Piano Stor.
Press Box
Concessions
Costume Storage
Laundry
Scene Shop
Black Box
Training AthleticControl Athletic PE Auditorium Auditorium Staff Room Staff Stage Prop Storage Room W.C. W.C. Storage (Seats 600) (Seats 600)
85’ - 0”
Finish Room
Woods Storage Storage
Team Room
85’ - 0”
Dep. Studio
W.C.
No Change
No Change
No Change
Finish Room
Theater Office
85’ - 0”
Instrument + Marching Band Storage
Ensemble
Dep. Studio
Woods Storage Woods Storage
Woods
85’ - 0”
Finish Room
Woods Storage Storage
Woods
100’ - 0”
Woods Storage Storage
Woods Vocal
257 446 sf
192’ - 0”
Prac. Room Prac. Room Prac. Room Robe Storage Vocal Office Band Office
100’ - 0”
90’ - 0”
90’ - 0”
Vocal
Room Robe Storage Vocal Office Band Office
100’ - 0”
Prac. Room Prac. Room
Instrument Percussion + Marching Storage Band Storage
Percussion Storage
Ensemble
80’ - 0”
80’ - 0”
80’ - 0”
Music Library
Prac. Band
Band
Vocal
Music Library
100’ - 0”
257 446 sf
No Change
Instrument + Marching Band Storage
Music Library
Wrestling Room
Piano Stor.
Costume Storage Dance/ Multipurpose Room
257 446 sf
Prac. Room Prac. Room Prac. Room Robe Storage Vocal Office Band Office
Band
Percussion Storage
Music Library
80’ - 0”
179’ - 0”
179’ - 0”
179’ - 0” Music Library
257 446 sf
257 446 sf
256’ - 0”
Music Library
Ensemble
Percussion Storage
Ensemble
Ensemble
Robotics/Metals Lab
Robotics/Metals Lab
Storage
Finish Room
Dep. Studio
Woods
Robotics/Metals Lab
Woods Storage
Storage
Finish Room
Dep. Studio
Woods
Control Room
Robotics/Metals Lab
Woods Storage Finish Room
StorageAuditorium
(Seats 600)
Dep. Studio
Stage
Piano Stor.
Black Box
W.C.
Control Room
Auditorium (Seats 600)
Costume Storage
Stage
Piano Stor.
Office W.C.
Black Box
Athletic Storage
Theater Office W.C. W.C.
W.C.
Control Room
PE Offices
PE
PE Athletic Staff W.C.
PE Athletic Staff W.C.
180’ - 0”
180’ - 0” Locker Room
Offices Auditorium Control Room (Seats 600)
85’ - 0”
Woods
85’ - 0”
Dep. Studio
100’ - 0”
Storage
Finish Room
Woods Storage
100’ - 0”
Woods Vocal
Woods Storage
100’ - 0”
Band Vocal
100’ - 0”
Band 80’ - 0”
Vocal
Prac. Room Prac. Room Prac. Room Robe Storage Vocal Office Band Office Instrument + Marching Band Storage
85’ - 0”
Costume Storage
W.C.
Prac. Room Prac. Room Prac. Room Robe Storage Vocal Office Band Office Percussion Instrument Storage + Marching Band Storage
Fitness Room Theater
Prop Storage
85’ - 0”
W.C.
85’ - 0”
Theater Office
Team Room
180’ - 0”
105’ - 0”
Prop Storage
W.C.
232,270 sf
180’ - 0”
80’ - 0”
80’ - 0”
80’ - 0”
Theater Office
80’ - 0”
232,270 sf
Percussion Storage
80’ - 0”
143 - 0”
Athletic Director General Office
Locker Room
Prop Storage
Prop Storage
Main Competition Gym Costume Black Box Storage
Costume Storage Auditorium Stage Piano (SeatsStor.600)
PE Storage
Training Room
Athletic Office
Laundry
Athletic Office
Stage
Piano Stor.
Bleacher Seating 1,500 people Concessions
Wrestling Room
Press Box
Black Box
232,270 sf
Band
Prac. Room Prac. Room Prac. Room Robe Storage Vocal Office Band Office Instrument + Marching Band Storage
143 - 0”
232,270 sf
232,270 sf
245’ - 0”
143 - 0”
53
54
Sketches I
55
56
Photography I
57