Sehyun Lee
929-366-6634
sehyunlee48@gmail.com Conventional Conventional Side Side by Side Side Arrangement Arrangement Conventional Conventional Conventional Stacking Stacking Arrangement Arrangement Conventional Side byby Side Arrangement Stacking Arrangement
Florence Airport
Conventional Side by Side Arrangement
Professional Work: Rafael Vinoly Architects Program: Airport Location: Florence, Italy Responsibility: Concept Design Proposal 3D Modeling (Rhino) Presentation (Rhino and Adobe Suite)
AERIAL VIEW FROM AIRSIDE
Conventional Stacking Arrangement
al al Aarrliv Arriv Arriv re rture rture aertpuaepa DepD D
Proposed Proposed Face Face to Face Face Arrangement Arrangement Proposed Face to to Face Arrangement
Proposed Face to Face Arrangement Allowing Allowing for a “Piazza” a “Piazza” Allowing for for a “Piazza” in Between in Between in Between
re rture rture aertpuaepa DepD D l l a arrliv rriva iv A A rr A
al al Aarrliv Arriv Arriv
rtuare rture tuare paer p ep De D D
Ariel View
RAFAEL RAFAEL VINOLY VINOLY ARCHITECTS ARCHITECTS | TOSCANA | TOSCANA AEROPORTI AEROPORTI ENGINEERING ENGINEERING | 24 JUNE, | 24 JUNE, 20192019 RAFAEL VINOLY ARCHITECTS | TOSCANA AEROPORTI ENGINEERING | 24 JUNE, 2019
4
4
4
Interior View I
DESIGN CONCEPT | REFERENCE TO TUSCAN LANDSCAPE NOITALUGATES CRIC DNA MARGORP Program & Circulation
View of Gates
AFAEL VINOLY ARCHITECTS | TOSCANA AEROPORTI ENGINEERING | 24 JUNE, 2019
Terminal is covered by a Productive Green Roof Section Diagram
RAFAEL VINOLY ARCHITECTS | TOSCANA AEROPORTI ENGINEERING | 24 JUNE, 2019
27
Productive Green Roof (vineyard) 9102 ,ENUJ 42 | GNIREENIGNE ITROPOREA ANACSOT | STCETIHCRA YLONIV LEAFAR
Land Use
Land Infill
Parking
Shopping Main Lobby View I Mall
Departure
Drop Off
Departure
Pick Up
Arrivals
SLA
Interior View II Airside
Sehyun Lee
929-366-6634
sehyunlee48@gmail.com
Hudson Courthouse
Professional Work: Rafael Vinoly Architects Program: Office Building Location: 826 Central Avenue, Jersey City, NJ Responsibility: Design Development Document(Revit) Presentation (Rhino, Adobe Suite)
Ariel View
Elevation
SLA
Sehyun Lee
929-366-6634
sehyunlee48@gmail.com
250 Church Street
Professional Work: Rafael Vinoly Architects Program: Office Building Location: 250 Church St, New York, NY Responsibility: Schematic Design Document(Rhino) 3D Modeling (Rhino) Presentation (Rhino and Adobe Suite)
Ariel View
EPT DESIGN - ALTERNATIVE 2
BLE / FIXED WINDOW WALL SYSTEM
Operable / Fixed Window Wall System
250 CHURCH STREET
24 JUNE 2019
65
View of Lobby Wall Section Detail
SLA
Sehyun Lee
929-366-6634
sehyunlee48@gmail.com
37 Plaza NY Baler Ocean Center 37 Plaza 37 Plaza NY 37 Plaza NY Baler Ocean Center Baler Ocean Center Mixed Used Building
Mixed Mixed Used Building Used Building Professional -Ransd Architecture CazaProfessional ArchitectureWork Work: Ransd Design Architects Professional WorkWork -Ransd Architecture -Ransd Architecture CazaProfessional Architecture Caza Architecture Under construction Team:Under Carlos, Jun deng,Alden,Sehyun Lee Under construction construction Team: Team: Carlos, Jun deng,Alden,Sehyun Carlos, Jun deng,Alden,Sehyun Lee Re-Thinking in the Future competition -1stBuilding Award Program: Mixed UseLee Re-Thinking in the Future competition -1st Award Re-Thinking in the Future competition -1st Award Team: Jace, Hansen,Jay Team: Jace,Jace, Hansen,Jay Team: Hansen,Jay
Location: 37-02 Queens Blvd, Queens, NY Responsibility: Construction Drawing (Auto CAD)
RANSD A RCHIT ECT R A N S D A R CRHAI TNESCDT
1270 BROADWAY S N O ARD1K 1 2E7 W 0 BY RO W A 0Y NBS Y 2 ,7 T E W2 1Y 2 N O R. NK6E, 8W N5 Y F 22 1 82 5 51 T 1 2 2 .. T 6 6 8 F 2 1 2 . F 6 82 51
A A
A.1 A.1 A
B B
A.1
C C
B
D D
C
D
D.9 D.9
F F
D.9
G G
F
G
Completion Photo I TOP OF ELEVATOR TOP OF ELEVATOR TOP OF ELEVATOR BULK HEAD BULK HEAD BULK HEAD
TOP OF ROOF TOP OF ROOF 74'-4" A.F.F. TOP OF ROOF 74'-4" A.F.F. 74'-4" A.F.F.
TOP OF STAIR TOP OF STAIR TOP OF STAIR BULK HEAD BULK HEAD BULK HEAD KEY PLAN KEY PLAN
KEY PLAN
SIXTH ROOF SIXTHA.F.F. ROOF 60'-4" SIXTH ROOF 60'-4" A.F.F. 60'-4" A.F.F.
BY BY
FIFTH FLOOR FIFTH FLOOR 50'-4" A.F.F. FIFTH FLOOR 50'-4" A.F.F. 50'-4" A.F.F.
DESCRIPTION DESCRIPTION
37 PLAZA LLC.
37-02 QUEENS BOULEVARD
3737PLAZA PLAZALLC. LLC.
BASE PLANE 0'-5" A.F.F. BASE PLANE BASE PLANE 0'-5" A.F.F.0'-5" A.F.F.
REV.REV. No. No.
ADJ. BLDG.
Physical Model l PhysicalPhysical Model Model l l
ADJ. ADJ.BLDG. BLDG.
SECOND FLOOR 15'-4" A.F.F. SECOND FLOOR FLOOR SECOND 15'-4" A.F.F. 15'-4" A.F.F.
DATE DATE
THIRD FLOOR THIRDA.F.F. FLOOR 30'-4" THIRD FLOOR 30'-4" A.F.F. 30'-4" A.F.F.
37-02 37-02 QUEENS QUEENS BOULEVARD BOULEVARD L OL TO 25, T 25, B LBOL C O KC K 224224 BO BR OO RU OG UH GH O FO QUEENS F QUEENS NEW NEW YORK YORK
TOP OF STAIR TOP OF STAIR TOP OF STAIR BULK HEAD BULK HEAD BULK HEAD
FOURTH FLOOR FOURTH FLOOR 40'-4" A.F.F. FOURTH FLOOR 40'-4" A.F.F. 40'-4" A.F.F.
PROJECT NAME :
PROJECT NAME : PROJECT N
ENLARGED PARTIAL ENLARGED PARTIAL ENLARG
FIRST FLOOR 0'-0" A.F.F. FIRST FLOOR FIRST FLOOR 0'-0" A.F.F.0'-0" A.F.F.
A A
A.1 A.1 A
B B
A.1
C C
B
D D
C
D
D.9 D.9
F F
D.9
G G
F
R A N S DC AHRACNHGI T ES COTOU RSEO PH S AOR G H OG F E SS S IO ON A C HL A R A N S DC AHRAPCRNRH TOAU AI TNESCDC R CENHP
1 2 7 0 B R O APL RD WFEEANSYSSI OES NUANILT 1F I O C O E .A R 0 PR OC N 2E7 W O ALRD K 1L E.D 0W 1 0 BY RO W AN0YSNB S YR UNO IT 10 I 1C E O 0 2E,7 A I C T E W2 1Y 2 N O R. NK6E, 8W N5 Y. O31R02K0 F 22 1 82 5 5 1 .. 2 33 . 226 T 1 2 2 .. T 6 6 8 F 2 SEAL 1 2 & .SIGNATURE: F 6 82 51 . 2 3 . 26
G
SEAL & SIGNATURE: SEAL & SIG
Completion Photo II
1 1
1 1
1
2 2
2
3 3
3
4 4
4
5-1 5-1
5-1
PROPOSED WEST ELEVATION 1 PROPOSED PROPOSED WESTWEST ELEVATION ELEVATION
A.402 A.402 A.402
TOP OF ROOF TOP OF ROOF 78'-4" A.F.F. TOP OF ROOF 78'-4" A.F.F. 78'-4" A.F.F. TOP OF ROOF TOP OF ROOF 74'-4" A.F.F. TOP OF ROOF 74'-4" A.F.F. 74'-4" A.F.F.
TOP OF STAIR TOP OF STAIR TOP OF STAIR BULK HEAD BULK HEAD BULK HEAD
drawing by
M.J
review drawingby by
STA drawingM.J by
review by date
STA review 07-1 by
date scale
date
07-1 AS
scale Drawing No.
scale
AS
A-402. A-402. A-
Drawing No.
Drawing No
KEY PLAN KEY PLAN
KEY PLAN
SIXTH ROOF SIXTH 60'-4"ROOF A.F.F. SIXTH ROOF 60'-4" A.F.F. 60'-4" A.F.F.
DESCRIPTION DESCRIPTION
37-02 QUEENS BOULEVARD L O T 25, B L O C K 224 B O R O U G H O F QUEENS NEW YORK
DATE DATE
3737PLAZA PLAZALLC. LLC.
37 PLAZA LLC.
ADJ. BLDG
SECOND FLOOR 15'-4" A.F.F. FLOOR SECOND FLOOR SECOND 15'-4" A.F.F. 15'-4" A.F.F.
REV.REV. No. No.
ADJ. ADJ.BLDG BLDG
THIRD FLOOR THIRD FLOOR 30'-4" A.F.F. THIRD FLOOR 30'-4" A.F.F. 30'-4" A.F.F.
37-02 37-02 QUEENS QUEENS BOULEVARD BOULEVARD L OL TO 25, T 25, B LBOL C O KC K 224224 BO BR OO RU OG UH GH O FO QUEENS F QUEENS NEW NEW YORK YORK
FOURTH FLOOR FOURTH FLOOR 40'-4" A.F.F. FLOOR FOURTH 40'-4" A.F.F. 40'-4" A.F.F.
BY BY
FIFTH FLOOR FIFTH FLOOR 50'-4" A.F.F. FIFTH FLOOR 50'-4" A.F.F. 50'-4" A.F.F.
PROJECT NAME : PROJECT NAME : PROJECT NAME :
BASE PLANE 0'-5"PLANE A.F.F. BASE BASE PLANE 0'-5" A.F.F.0'-5" A.F.F.
Physical Model ll PhysicalPhysical Model Model ll ll
ENLARGED PARTIAL ELEVAT ENLARGED PARTIAL ELEVAT ENLARGED PAR C H A N G
1 1
1
2 2
2
3 3
3
4 4
4
5-1 5-1
FIRST FLOOR 0'-0" A.F.F. FIRST FLOOR FIRST FLOOR 0'-0" A.F.F.0'-0" A.F.F.
5-1
S O O
S O H N ,
R
C H A OAHL A S AO H P RNO G F E SS S IO OC N C HNI S T,EO CR TO NR G L RI O C FEE N E NA N LO .A R 0C 3 1 T9 P S SSI O HS I4TS9EI O C PROFE N
SLA L I C E N S E
N OL . I C0 E3 N4 S 9 1 E 9
SEAL & SIGNATURE:
SEAL & SIGNATURE: SEAL & SIGNATURE:
Sehyun Lee
929-366-6634
sehyunlee48@gmail.com
Sempio - Culinary Studio
Professional Work: Ransd Design Architects Program: Commercial Location: 250 Front St, New York, NY Responsibility: Construction Design Drawings(Auto CAD) 3D Modeling (Rhino) Presentation (Rhino and Adobe Suite)
Interior View I
View of Main Lobby
Interior View I
Interior View II
Sehyun Lee
929-366-6634
sehyunlee48@gmail.com
Memphis Mission Hospital Memphis Mission Hospital Professional Mission HospitalWork: CAZA Architects Caza Architecture Program: Hospital Team: Carlos, Jun deng,Alden,Sehyun Lee, Patricia Location: Victorias City, Philippines Location: Victorias City, Philippines Status: Design Development Role: Skematric Design, 3d Modeling, Presentation Responsibility: Concept Design Proposal work 3D Modeling (Rhino) Presentation (Rhino and Adobe Suite)
The MissionHospital Hospital is the ground-up in the Philippines. TheMemphis Memphis Mission is the firstfirst ground-up charitycharity missionmission hospital hospital in the Philippines. It is locatIt ed is located 3 kilometers fromof the centerCity of Victorias City in Negros. The hospital is divided into 4 3 kilometers from the center Victorias in Negros Occidental and pays homage to the rich tropical landscape of the architectural region. The hospital is divided 4 inter-connected architectural volumes thatoffer in their inter-connected volumes that into in their distinctly semi-open arrangement sweeping distinctly arrangement sweeping vistas of a arrival differenttogarden from every window. Uponroof welvistas of a semi-open different garden fromoffer every window. Upon the hospital, a large curved arrivalvisitors to the hospital, a large curved welcomes visitors totree an open-air plaza with large banyan tree of new comes to an open-air plazaroof with a large banyan at its center thataservies as a kind at its center that serves as a kind of new community center for Victorias City. Under this shimmering light community center for Victorias City. Under this shimmering light blue metallic roof one finds a library blue metallic roof one finds a library, a health-focused restaurant, consultation rooms and a registration , aarea health-focused restaurant, consultation and a registration area for Large monufor patients. Large monumental steps lead rooms to the operating rooms contained in a patients. simple single-pitch mental steps to thestone operating roomsbycontained a simple single-pitch structure clad in natural structure cladlead in natural and bounded a vegetableingarden to the north. The doctor & nurse’s stone and bounded by a vegetable garden the privacy north. and Theenveloped doctor & innurse’s privaterain dormitory private dormitory is raised on a stone plinth to to ensure an aluminum screen is that resembles theplinth bamboo vernacular homes. bedroom faces flower that garden of raised on a stone to curtains ensure of privacy and Filipino envelpoed in Each an aluminum rain ascreen resembles swirling paths while morning light cascades down from a series of clearstory windows that sweep upwards the bamboo curtains of vernacular Filipino homes. to the sky. At the eastern edge of the Memphis Mission Hospital are two extraordinary public spaces: the artist studio and chapel
Isometric
Main Lobby Vi
SLA
Sehyun Lee
929-366-6634
sehyunlee48@gmail.com
Ocean Center
Professional Work: CAZA Architects Program: Mixed Use Building Location: Baler, Philippines Responsibility: Concept Design Proposal(1st Award) 3D Modeling (Rhino) Presentation (Rhino and Adobe Suite)
PROGRAM
Program
Apartment
Spa & Gym
ELEMENTS
Archipelagic Program
Restaurants
Convention Center
Figure and Site
Market
Museum
PROGRAM
ELEMENTS
Design a civic center for a coastal village with a booming Isometric tourism market. The center should provide structures with year- round public use that range from recreatinal to commercial with the goal of giving local artisans and farmers a place to engage with outsiders while ensuring that Figure centers Program Archipelagic Program and Site is integrated into the ocean-side landscape in a way that acknowledges the massive risks by architecture from climate changes. Retail Coastal Architecture inApartment the age of climate change hasMarket beRestaurants comeRetail an increasingly precarious proposition. At the Ocean Center project, we developed a way of building in a coastal environment that anticipates massive change. both ground and sturcture are designed as open systems that enable Spa & Gym Museum Center their surroundings to flow throughConvention in calculated and measured ways so that the forces of nature activate architectural spces at different intensities. The modulation of natural Market systems sucha s air movement, solar radiation, and tidal currents though the architectural techniques of walss, roofs and floor makes it possible to determine the materialization of program through nature.
Museum
Museum
Apartment
Market
Apartment Convention Center
Convention Center
Site Plan Recreation Area
Recreation Area Professionalwork I
View of Market
Professionalwork I
Sehyun Lee
929-366-6634
sehyunlee48@gmail.com
Hidden Hybrid Grid Grid Hidden Hybrid
- Guggenheim RethinkingMuseum Guggenheim Museum International Architectural Competition (Archasm) Personal Work: Competition Team: Janghee Lee, Dongsik Kim, Sehyun Lee Program: Museum Our proposed plan is to create a new space by Team: Janghee Lee following New York City’s grid onto the existing Location: 1071 Museum. 5th Ave, New NY level’s Guggenheim The York, diversity Responsibility: boxes provideConcept various Design spaces Proposal like special exhi bition or activities 3D Modeling (Rhino) space. Also several boxes are existing Guggenheim Museum connected with Presentation (Rhino and Adobe Suite) to provide a new space.
1. MAKE NEW PLATFORM FOLLOWING N.Y.C GRID
2. MAKE OPEN HOLE FOR EXISTING BUILDING’S SKY LIGHT
3. REACT WITH EXISTING SPACE(BLOW) & NEW SPACE (ABOVE)
SLA
Sehyun Lee
929-366-6634
sehyunlee48@gmail.com
Actibrary
- Activity + Library
Personal Work: Competition Program: Library Team: Janghee Lee Location: Tokyo, Japan Responsibility: Concept Design Proposal 3D Modeling (Rhino) Presentation (Rhino and Adobe Suite)
Perspective Section
View of Digital Library
View of Reading Area
Sehyun Lee
929-366-6634
sehyunlee48@gmail.com
Future Low-Carbon City
Academic Work: Syracuse University Program: Mixed Use Building Location: Shenzhen, China Responsibility: Concept Design Proposal(Honorable Award) 3D Modeling (Rhino) Presentation (Rhino and Adobe Suite)
SLA