Sehyun Lee Architectural Portfolio 2020(Selected Works)

Page 1

Sehyun Lee ‘s Architectural Portfolio

SLA 2020 Selected Work · Professional Work · Syracuse University 2015-2020


Work/living Space 2016

SLA


TABLE OF CONTENT Selected Work 2

1

3

4

1 5

6

7

8

9

10

11

2

3

4

5

6

7

8 PROJECT:

12

250 CHURCH STREET

GENERAL NOTES:

250 CHURCH STREET NEW YORK, NY 10013

A

250 CHURCH STREET

A

B

KEY NOTES:

LEGEND:

01

NEW YORK, NY 10013

SCHEMATIC DESIGN DOCUMENT DECEMBER 20, 2019

NYCFC Staduim

C

PROJECT NUMBER:

748.000

02

250 Church St

OWNER / CLIENT :

MAPLE C 250 CHURCH OWNER, LLC 53 MAPLE AVENUE, MORRITOWN, NJ 07960 ARCHITECT :

RAFAEL VINOLY ARCHITECTS 375 PEARL STREET, 31ST FL. NEW YORK, NY 10038 T: 212.924.5060 STRUCTURAL CONSULTANT :

MCNAMARA SALVIA 45 WEST 45TH STREET, 10TH FLOOR, NEW YORK, NY 10036 T. 212.246.9800 MEP ENGINEER :

HIGHLAND ASSOCIATES ONE EAST 33RD STREET, NEW YORK, NY 10016 T. 212.681.0200 CIVIL ENGINEER :

BOHLER ENGINEERING 225 W 34TH STREET, SUITE 814, NEW YORK, NY 10122 T. 646.661.4200 EXTERIOR ENCLOUSRE CONSULTANT :

ENTUITIVE 28 W 44TH STREET, NEW YORK, NY 10036 T. 718.280.5935

B

FACADE MAINTERNANCE :

Rafael Vinoly Architets I 2019 Design Development

Rafael Vinoly Architets I 2020 Design Development

D

E

ENTEK ENGINEERING, PLLC 166 AMES STREET, HACKENSACK, NJ 07601 T. 201.820.2803 FIRE PROTECTION :

CODE CONSULTANT, INC. 215 W 40TH STREET, 10TH FLOOR, NEW YORK, NY 10018 T. 212.216.9596 VERTICAL TRANSPORTATION :

FORTUNE SHEPLER SALING, INC. 8752 FORREST DRIVE, HIGHLANDS RANCH, CO 80126 T. 720.438.1540 LIGHTING CONSULTANT :

ZEROLUX 242 W 30TH STREET, LEVEL 2, NEW YORK, NY 10001 T. 212.209.1536 CODE CONSULTANT / EXPEDITOR :

RIZZO GROUP 1333 BROADWAY, SUITE 500, NEW YORK, NY 10018 T. 212.695.5980

AERIAL VIEW FROM LANDSIDE

C

F

PRE-DECISIONAL AND FOR DELIBERATIVE PURPOSES ONLY G

CONFIDENTIALITY NOTICE:

ORIGINAL, PROPRIETARY AND CONFIDENTIAL. UNAUTHORIZED USE, DUPLICATION, PUBLICATION AND / OR DISTRIBUTION IS PROHIBITED. VIOLATORS WILL BE PROSECUTED TO THE FULLEST EXTENT OF THE LAW.

ARCHITECT / ENGINEER SEAL

DOB STAMP & SIGNATURE:

D H

DOB JOB NUMBER:

LANDSCAPE ARCHITECTURE:

MEP / FP / AV / IT / SEC ENGINEERING:

ARCHITECTURE:

CODE CONSULTANTS PC 215 WEST 40TH STREET NEW YORK, NY 10018 T. 212.216.9596

MPFP PLLC 120 BROADWAY, 20TH FLOOR NEW YORK, NY 10271 T. 212.477.6366

ME ENGINEERS 29 WEST 38TH STREET, 5TH FLOOR NEW YORK, NY 10018 T. 212.447.6770

RAFAEL VINOLY ARCHITECTS PC 375 PEARL STREET, FLOOR 31 NEW YORK, NY 10038 T. 212.924.5060

SPORTS LIGHTING DESIGN:

PLAYING FIELD DESIGN:

FOOD SERVICE DESIGN:

STRUCTURAL ENGINEERING:

SITE / CIVIL ENGINEERING:

MUSCO SPORTS LIGHTING LLC 100 1ST AVENUE W OSKALOOSA, IA 52577 T. 641.673.0411

JEFFREY L. BRUCE & COMPANY 1907 SWIFT STREET, SUITE 204 NORTH KANSAS CITY, MO 64116 T. 816.842.8999

YOUNG CARUSO 8055 EAST TUFTS AVE, SUITE 1320 DENVER, CO 80237 T. 303.649.1600

SBP ENGINEERING PC 555 EIGHTH AVENUE, SUITE 2402 NEW YORK, NY 10018 T. 646.710.3962

LANGAN ENGINEERING 21 PENN PLAZA, 8TH FLOOR NEW YORK, NY 10001 T. 212.479.5400

ARCHITECT/ENGINEER SEAL:

PROJECT NAME & LOCATION

OWNER:

NEW YORK CITY FOOTBALL CLUB BRONX STADIUM

CFG STADIUM GROUP, LLC C/O NEW YORK CITY FOOTBALL CLUB, LLC 600 3RD AVENUE, 30TH FLOOR NEW YORK, NY 10016 T. 212.738.5817

45 RIVER AVENUE 10 MAJ. WILLIAM DEEGAN BLVD. BRONX, NY 10451

COST ESTIMATOR:

DHARAM CONSULTING 37 WEST 35TH STREET NEW YORK, NY 10001 T. 917.710.3903

KEY PLAN:

DOCUMENT ISSUANCE SUMMARY:

DRAWING ORIGINATOR:

DRAWING TITLE:

K

N

A B H J G F

C D E

REV NO:

DESCRIPTION:

RENDERING #8 EAST PLAZA

DATE:

DRAWING SCALE:

DRAWING SIZE:

36" X 48"

DRAWING NUMBER:

PROJECT PHASE:

CONSTRUCTION DOCUMENTS

G-008

03

04

Florence Airport

Baler Ocean Center

Rafael Vinoly Architets I 2019 Competition

Caza architect I 2018 Concept Idea Re-Thinking in the future 1st Award -Mixused

E

F

SUBMISSION / REVISION

100% SCHEMATIC DESIGN

2019.12.20.

REV DESCRIPTION

DATE

DOB STAMP AND SIGNATURE

N

KEY PLAN: FRANKLIN STREET

CODE COMPLIANCE & ACCESSIBILITY:

LEONARD STREET

DOB SCAN CODE:

VERTICAL TRANSPORTATION:

FORTUNE SHEPLER SALING INC. 37 WOODLAND ROAD MAPLEWOOD, NJ 07040 T. 862.400.6382

CHURCH STREET

PROJECT PHASE:

SCHEMATIC DESIGN DRAWING SIZE:

SCALE:

N.T.S.

24" x 36"

DRAWING TITLE:

COVER SHEET

SHEET NUMBER:

DOB REV

A-000 .00

© 2019 RAFAEL VINOLY ARCHITECTS PC

RAFAEL VINOLY ARCHITECTS | TOSCANA AEROPORTI ENGINEERING | 24 JUNE, 2019

05 Field of Terra Fluxes DND architect I 2012 Concept Idea AC-CA Competition

22

06 Floating

Syracuse University Academic Work I 2016 Concept Idea Shen zhen Low carbon City -Honorable Award

SLA


Professional Work

01/ 1

NYCFC Staduim Rafael Vinoly Architect 2019.11 - 2020.11(1year)/SD/DD50,DD100 Staduim 2

3

4

1.Performs original design work utilizing specifications, sketches and ideas on developing designs. 2. Assists in preparation of layout and draws preliminary sketch of project to present to client. 3. Assists in conducting preliminary studies of proposed projects to obtain information as to space and design requirements, obtaining measurements and making sketches preliminary to the preparation of drawing (AutoCAD, Rhino, Grasshopper, Photoshop, Illustrator, and Indesign) 4. Design developing with 3D modeling and Rendering 5

6

7

8

9

10

11 GENERAL NOTES:

KEY NOTES:

LEGEND:

PRE-DECIS DELIBERATIV CONFIDENTIALITY NOTICE:

ORIGINAL, PROPRIE UNAUTHORIZED USE,


Site & Design Approach

1

2

3

4

5

6

7

8

10

9

11 GENERAL NOTES:

A

Site

B

Field Orientation

Building Footprints

KEY NOTES:

LEGEND:

C

D

E

F

PREDELIBE


Main Concourse Level Plan


B

KEY NOTES:

LEGEND:

C

D

E

1

2

3

4

5

6

7

8

10

9

11

A

F

PRE-DECISIONAL AND F DELIBERATIVE PURPOSES B

G

CONFIDENTIALITY NOTICE:

North Plaza

H

ORIGINAL, PROPRIETARY AND CONFIDE UNAUTHORIZED USE, DUPLICATION, PUBL AND / OR DISTRIBUTION IS PROHIBIT VIOLATORS WILL BE PROSECUTED THE FULLEST EXTENT OF THE LAW

DOB STAMP & SIGNATURE:

DOB JOB NUMBER:

C

DOB SCAN CODE:

VERTICAL TRANSPORTATION:

CODE COMPLIANCE & ACCESSIBILITY:

LANDSCAPE ARCHITECTURE:

MEP / FP / AV / IT / SEC ENGINEERING:

ARCHITECTURE:

FORTUNE SHEPLER SALING INC. 37 WOODLAND ROAD MAPLEWOOD, NJ 07040 T. 862.400.6382

CODE CONSULTANTS PC 215 WEST 40TH STREET NEW YORK, NY 10018 T. 212.216.9596

MPFP PLLC 120 BROADWAY, 20TH FLOOR NEW YORK, NY 10271 T. 212.477.6366

ME ENGINEERS 29 WEST 38TH STREET, 5TH FLOOR NEW YORK, NY 10018 T. 212.447.6770

RAFAEL VINOLY ARCHITECTS PC 375 PEARL STREET, FLOOR 31 NEW YORK, NY 10038 T. 212.924.5060

SPORTS LIGHTING DESIGN:

PLAYING FIELD DESIGN:

FOOD SERVICE DESIGN:

STRUCTURAL ENGINEERING:

SITE / CIVIL ENGINEERING:

MUSCO SPORTS LIGHTING LLC 100 1ST AVENUE W OSKALOOSA, IA 52577 T. 641.673.0411

JEFFREY L. BRUCE & COMPANY 1907 SWIFT STREET, SUITE 204 NORTH KANSAS CITY, MO 64116 T. 816.842.8999

YOUNG CARUSO 8055 EAST TUFTS AVE, SUITE 1320 DENVER, CO 80237 T. 303.649.1600

SBP ENGINEERING PC 555 EIGHTH AVENUE, SUITE 2402 NEW YORK, NY 10018 T. 646.710.3962

LANGAN ENGINEERING 21 PENN PLAZA, 8TH FLOOR NEW YORK, NY 10001 T. 212.479.5400

ARCHITECT/ENGINEER SEAL:

PROJECT NAME & LOCATION

OWNER:

NEW YORK CITY FOOTBALL CLUB BRONX STADIUM

CFG STADIUM GROUP, LLC C/O NEW YORK CITY FOOTBALL CLUB, LLC 600 3RD AVENUE, 30TH FLOOR NEW YORK, NY 10016 T. 212.738.5817

45 RIVER AVENUE 10 MAJ. WILLIAM DEEGAN BLVD. BRONX, NY 10451

COST ESTIMATOR:

DHARAM CONSULTING 37 WEST 35TH STREET NEW YORK, NY 10001 T. 917.710.3903

KEY PLAN:

N

A B C H J D K G F E

DOCUMENT ISSUANCE SUMMARY:

REV NO:

01

DESCRIPTION:

DOCUMENT RELEASE 2

DRAWING ORIGINATOR:

DRAWING TITLE:

RENDERING #7 SUPPORTERS PLAZA

DATE:

31-AUG-2020 DRAWING SCALE:

DRAWING SIZE:

36" X 48" DRAWING NUMBER:

PROJECT PHASE:

CONSTRUCTION DOCUMENTS

D

E

F

G

South Plaza

G-007


Other Event - Concert

Concert Layout

Lyout 1 ( Ed Sheeren)

Lyout 2 ( Taylor Swift)

Lyout 3 ( Gradation)


B

KEY NOTES:

LEGEND:

C

D

E

F

PRE-DECIS DELIBERATIVE G

CONFIDENTIALITY NOTICE:

ORIGINAL, PROPRIET UNAUTHORIZED USE, D AND / OR DISTRIB VIOLATORS WILL THE FULLEST E

DOB STAMP & SIGNATURE:

H

DOB JOB NUMBER:

DOB SCAN CODE:

VERTICAL TRANSPORTATION:

CODE COMPLIANCE & ACCESSIBILITY:

LANDSCAPE ARCHITECTURE:

MEP / FP / AV / IT / SEC ENGINEERING:

ARCHITECTURE:

FORTUNE SHEPLER SALING INC. 37 WOODLAND ROAD MAPLEWOOD, NJ 07040 T. 862.400.6382

CODE CONSULTANTS PC 215 WEST 40TH STREET NEW YORK, NY 10018 T. 212.216.9596

MPFP PLLC 120 BROADWAY, 20TH FLOOR NEW YORK, NY 10271 T. 212.477.6366

ME ENGINEERS 29 WEST 38TH STREET, 5TH FLOOR NEW YORK, NY 10018 T. 212.447.6770

RAFAEL VINOLY ARCHITECTS PC 375 PEARL STREET, FLOOR 31 NEW YORK, NY 10038 T. 212.924.5060

SPORTS LIGHTING DESIGN:

PLAYING FIELD DESIGN:

FOOD SERVICE DESIGN:

STRUCTURAL ENGINEERING:

SITE / CIVIL ENGINEERING:

MUSCO SPORTS LIGHTING LLC 100 1ST AVENUE W OSKALOOSA, IA 52577 T. 641.673.0411

JEFFREY L. BRUCE & COMPANY 1907 SWIFT STREET, SUITE 204 NORTH KANSAS CITY, MO 64116 T. 816.842.8999

YOUNG CARUSO 8055 EAST TUFTS AVE, SUITE 1320 DENVER, CO 80237 T. 303.649.1600

SBP ENGINEERING PC 555 EIGHTH AVENUE, SUITE 2402 NEW YORK, NY 10018 T. 646.710.3962

LANGAN ENGINEERING 21 PENN PLAZA, 8TH FLOOR NEW YORK, NY 10001 T. 212.479.5400

ARCHITECT/ENGINEER SEAL:

PROJECT NAME & LOCATION

OWNER:

NEW YORK CITY FOOTBALL CLUB BRONX STADIUM

CFG STADIUM GROUP, LLC C/O NEW YORK CITY FOOTBALL CLUB, LLC 600 3RD AVENUE, 30TH FLOOR NEW YORK, NY 10016 T. 212.738.5817

45 RIVER AVENUE 10 MAJ. WILLIAM DEEGAN BLVD. BRONX, NY 10451

COST ESTIMATOR:

DHARAM CONSULTING 37 WEST 35TH STREET NEW YORK, NY 10001 T. 917.710.3903

KEY PLAN:

N

A B C H J D K G F E

DOCUMENT ISSUANCE SUMMARY:

REV NO:

01 02

DESCRIPTION:

DOCUMENT RELEASE 1 DOCUMENT RELEASE 2

DRAWING ORIGINATOR:

DRAWING TITLE:

RENDERING #5 HOME FOR NYCFC

DATE:

31-JAN-2020 31-AUG-2020 DRAWING SCALE:

DRAWING SIZE:

36" X 48" PROJECT PHASE:

CONSTRUCTION DOCUMENTS

DRAWING NUMBER:

G-005


Professional Work

02/

250 Church St

1.Performs original design work utilizing specifications, sketches and ideas on developing designs. 2. Assists in preparation of layout and draws preliminary sketch of project to present to client. 3. Assists in conducting preliminary studies of proposed projects to obtain information as to space and design requirements, obtaining measurements and making sketches preliminary to the preparation of drawing (AutoCAD, Rhino, Grasshopper, Photoshop, Illustrator, and Indesign) 4. Design developing with 3D modeling and Rendering

Rafael Vinoly Architect 2019.06 - 2019.09(4year)/Concept Design/ SD Office Building

1

2

3

4

5

6

The 250 Church Street Office building was erected in the mid-1940s and designed by Victor Mayper, Eng. as a functional office building marketed towards tenants looking for a custom-made modern office environment.

250

Spanning a full block between Franklin Street and Leonard Street and facing onto Church Street, the building offered retail space on the ground level with convenient access to the #1 subway line and vehicular access to the Holland Tunnel and Brooklyn, Manhattan, and Williamsburg Bridges. The building is still afforded with many of the views from the upper floors that made the building so marketable when it was first completed. 250 Church Street was built for the future 70 years ago, and although the building is now in need of a major intervention to continue its initial promise, the rigorous and consistent structural grid still provides for the opportunity to reimagine this building in forming flexible and creative work environments.

SCHE DECE

A

B

C

The Schematic Design phase has been marked by the development of the building entry and the double-height lobby/lounge thatprovides all the building tenants with a unique amenity space connected to the activity of the surrounding streetscape. In addition, the building enclosure has developed with the proposed polished stainless steel cladding that dematerializes the building faรงade and provides an architectural counterpoint to the adjacent public art sculptural installation. D

E

F

NEW


5.

ROOF SLOPE, CRICKET SLOPE, TAPERED INSULATION SLOPE EFFITIVELY 1/4" PER FT. MIN UNO.

6.

ALL DOORS SHALL BE LOCATED 4" FROM FACE OF NEAREST PARTITION TO THE INSIDE EDGE OF THE JAMB AT HINGE SIDE, UNO.

STRUCTURAL CONSULTANT :

MCNAMARA SALVIA 45 WEST 45TH STREET, 10TH FLOOR, NEW YORK, N T. 212.246.9800 MEP ENGINEER :

HIGHLAND ASSOCIATES ONE EAST 33RD STREET, NEW YORK, NY 10016 T. 212.681.0200 CIVIL ENGINEER :

A-203

BOHLER ENGINEERING 225 W 34TH STREET, SUITE 814, NEW YORK, NY 10 T. 646.661.4200

1

EXTERIOR ENCLOUSRE CONSULTANT :

4

5

6

7

8

9

100' - 0" 1' - 4 3/4"

19' - 8 3/4"

FACADE MAINTERNANCE :

ENTEK ENGINEERING, PLLC 166 AMES STREET, HACKENSACK, NJ 07601 T. 201.820.2803

100' - 2"

19' - 8 3/4"

19' - 8 3/4"

1

2

A-304

A-304

PARTY WALL TO REMAIN UPTO LEVEL 07

19' - 8 3/4"

19' - 8 3/4"

SERVICE ROOM 0108 94 SF

19' - 8 3/4"

19' - 8 3/4"

20' - 0 7/8"

19' - 8 3/4"

1

2

A-305

A-305

1

VERTICAL TRANSPORTATION :

FORTUNE SHEPLER SALING, INC. 8752 FORREST DRIVE, HIGHLANDS RANCH, CO 801 T. 720.438.1540

UNISEX RESTROOM ELECTRICAL ROOM B 0106 0107 43 SF 63 SF

UP

15' - 7 1/8"

LOADING 0110 274 SF

LOADING PLATFORM

LOADING BERTH

DN

PARTY WALL TO REMAIN UPTO LEVEL 06

+9'-7" FROM LEVEL 01 2HR HORINONTAL PARTITION

CORRIDOR 0104 443 SF

STAIR A UP

PE-1

PE-2

PE-3

RECEPTION

DN

PE-4

18' - 1 7/16"

A UNISEX RESTROOM TO BE INSTALLED AS PART OF FUTURE RETAIL FIT-OUT

RETAIL A 0101 2954 SF

A-202 2

C

STAIR C

SECURITY TURNSTILE

D

DN

LOBBY 0103 2067 SF

A UNISEX RESTROOM TO BE INSTALLED AS PART OF FUTURE RETAIL FIT-OUT

1

DN

VESTIBULE WITH SELF-CLOSING DOORS2TO BE INSTALLED AS PART OF FUTURE RETAIL FIT-OUT: PRIOR TO OCCUPANCY / USE OF THE SPACE, THE TENANT / USER/ 1 OWNER SHALL SUBMIT ALTERATION JOB APPLICATION DOCUMENTS DEMONSTRATING THAT VESTIBULES ARE CONFIGURED IN COMPLIANCE A-303 ALL DIMENSIONS ARE TO FACE OF FINISHED SURFACE, WITH NYCECC CURRENT AT THE TIME OF SUBMISSION, AND SHALL UNLESS SHOWN OR NOTED OTHERWISE ATTAIN APPROVAL FROM THE NYC DOB.

3

4

5

RETAIL B 0102 1885 SF

6

THE GENERAL CONTRACTOR SHALL PROVIDE ALL BLOCKING REQUIRED TO ANCHOR WALL AND CEILING MOUNTED ITEMS, INCLUDING BUT NOT LIMITED TO TOILET ROOM ACCESSORIES, MILLWORK, CASEWORK, HANDRAILS, DOOR STOPS, ETC. AND ALL EQUIPMENT IDENTIFIED BY DRAWINGS OR SPECIFICATIONS AS CONTRACTOR INSTALLED. THE GENERAL CONTRACTOR SHALL CONFIRM AND COORDINATE ALL CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING ITEMS

4.

THE GENERAL CONTRACOR SHALL FIELD VERIFY ALL DIMENSIONS AND REPORT ANY DISCREPANCIES TO ARCHITECT.

22' - 10 1/2"

22' - 10 1/2"

3

3

A-552

A-562

22' - 10 1/2"

PROJECT:

250 CHURCH STREET 100% SCHEMATIC DESIGN

PROJECT NUMBER:

22' - 10 1/2"

748.000

E

OWNER / CLIENT :

ARCHITECT :

76' - 1"

RAFAEL VINOLY ARCHITECTS 375 PEARL STREET, 31ST FL. NEW YORK, NY 10038 T: 212.924.5060 KEY PLAN:

62' - 0 1/4"

200' - 1 1/2"

ROOF SLOPE, CRICKET SLOPE, TAPERED INSULATION SLOPE EFFITIVELY 1/4" PER FT. MIN UNO.

6.

ALL DOORS SHALL BE LOCATED 4" FROM FACE OF NEAREST PARTITION TO THE INSIDE EDGE OF THE JAMB AT HINGE SIDE, UNO.

STRUCTURAL CONSULTANT :

MCNAMARA SALVIA 45 WEST 45TH STREET, 10TH FLOOR, NEW YORK, N T. 212.246.9800 MEP ENGINEER :

1

Ground Level Floor Plan

A-203 A-201 1

HIGHLAND ASSOCIATES ONE EAST 33RD STREET, NEW YORK, NY 10016 CHURCH STREET T. 212.681.0200 CIVIL ENGINEER :

BOHLER ENGINEERING PROJECT PHASE: 225 W 34TH STREET, SUITE 814, NEW YORK, NY 10 T.SCHEMATIC 646.661.4200 DESIGN EXTERIOR ENCLOUSRE CONSULTANT : SCALE:

1

2

3

4

CHURCH STREET

5

6

7

8

100' - 0" 1' - 4 3/4"

19' - 5"

19' - 8 3/4"

9

10

19' - 8 3/4"

2

A-304

A-304

19' - 8 3/4"

19' - 8 3/4"

JANITOR 0604 23 SF

19' - 8 3/4"

21' - 5 3/8"

19' - 8 3/4"

2

A-305

A-305

FIRE PROTECTION :

7/8"

CODE CONSULTANT, INC. 215 W 40TH STREET, 10TH FLOOR, NEW YORK, NY T. 212.216.9596

OVERALL FLOOR PLAN - LEVEL 01 SCALE: 1/8" = 1'-0" 2' - 0 7/8"

PARTY WALL TO REMAIN UPTO LEVEL 07

19' - 8 3/4"

1

A-301

210 SF

SERVICE ELEVATOR LOBBY 0605 90 SF

C

MALE RESTROOM 3 0602 DN

ELECTRICAL 0607 94 SF

57' - 0 3/8"

PE-1

A

PE-2

PE-3

PE-4

CODE CONSULTANT / EXPEDITOR :

RIZZO GROUP 1333 BROADWAY, SUITE 500, NEW YORK, NY 10018 T. 212.695.5980

UP

C

OFFICE 0601 10399 SF

ARCHITECT / ENGINEER SEAL

60' - 0"

18' - 11 5/8"

A-202 2

ZEROLUX 242 W 30TH STREET, LEVEL 2, NEW YORK, NY 1000 T. 212.209.1536

B

OPERABLE WINDOW SYSTEM REFER TO A-522

D

DOB REV

A-101 .00

FORTUNE SHEPLER SALING, INC. 8752 FORREST DRIVE, HIGHLANDS RANCH, CO 801 T. 720.438.1540

UP

DN STAIR A

2

PARTY WALL TO REMAIN UPTO LEVEL 06

SHEET NUMBER: VERTICAL TRANSPORTATION :

LIGHTING CONSULTANT :

STAIR B

FEMALE RESTROOM 0603 228 SF

A-302

MECHANICAL 0606 252 SF

15' - 7 1/8"

A-582

SE-1

1

© 2019 RAFAEL VINOLY ARCHITECTS PC

18' - 11 5/8"

1

24" x

OVERALL FLOOR PLA ENTEK ENGINEERING, PLLC 166 AMES STREET, HACKENSACK, NJ 07601 T.LEVEL 201.820.2803 01 FACADE MAINTERNANCE :

100' - 2"

19' - 8 3/4"

1

DRAWING

ENTUITIVE 1/8" = 1'-0" 28 W 44TH STREET, NEW YORK, NY 10036 T. 718.280.5935 DRAWING TITLE:

11

15' - 11 7/8"

B F

D

250 CHURCH STREET NEW YORK, NY 10013

MAPLE C 250 CHURCH OWNER, LLC 53 MAPLE AVENUE, MORRITOWN, NJ 07960

62' - 0 1/4"

5.

2

REV DESCRIPTION

DOB STAMP AND SIGNATURE

LEONARD STREET

3.

SUBMISSION / REVISION

8

VESTIBULE WITH SELF-CLOSING DOORS TO BE INSTALLED AS PART OF FUTURE RETAIL FIT-OUT: PRIOR TO OCCUPANCY / USE OF THE SPACE, THE TENANT / USER/ OWNER SHALL SUBMIT ALTERATION JOB APPLICATION DOCUMENTS DEMONSTRATING THAT VESTIBULES ARE CONFIGURED IN COMPLIANCE WITH NYCECC CURRENT AT THE TIME OF SUBMISSION, AND SHALL ATTAIN APPROVAL FROM THE NYC DOB.

22' - 1"

22' - 1"

7

1' - 5"

A E

19' - 0 1/4"

2.

ARCHITECT / ENGINEER SEAL

D

GENERAL NOTES 1.

A-202

18' - 11 5/8"

1

RIZZO GROUP 1333 BROADWAY, SUITE 500, NEW YORK, NY 10018 T. 212.695.5980

B

18' - 11 5/8"

40' - 8 5/8"

2 A-302

CODE CONSULTANT / EXPEDITOR :

18' - 11 5/8"

DN

ZEROLUX 242 W 30TH STREET, LEVEL 2, NEW YORK, NY 1000 T. 212.209.1536

18' - 1 7/16"

FIRE ALARM PANELS

18' - 11"

LIGHTING CONSULTANT :

A

ENTRY MARQUEE ABOVE

STAIR B

76' - 0"

CODE CONSULTANT, INC. 215 W 40TH STREET, 10TH FLOOR, NEW YORK, NY T. 212.216.9596

SE-1

A-301

C

LEONARD STREET

FIRE PROTECTION :

1' - 5 1/4"

UNISEX RESTROOM A 0105 43 SF

DN 16' - 3 1/8"

ENTUITIVE 28 W 44TH STREET, NEW YORK, NY 10036 T. 718.280.5935

11

2' - 0 7/8"

19' - 5"

10

FRANKLIN STREET

3

FRANKLIN STREET

2

15' - 11 7/8"

1

60' - 0"

B

76' - 0"

1

A-202

SUBMISSION / REVISION

D 1

100% SCHEMATIC DESIGN

18' - 11 5/8"

TERRACE 608 348 SF

E

D

E

180' - 4 3/4" KEY PLAN:

200' - 1 1/2"

Typical Floor Plan

FRANKLIN STREET

19' - 8 3/4"

2

REV DESCRIPTION DOB STAMP AND SIGNATURE

LEONARD STREET

A-303

1' - 5"

18' - 11 5/8"

Drawing

1

CHURCH STREET

A-201 PROJECT PHASE:

SCHEMATIC DESIGN


RAFAEL VINOLY ARCHITECTS Office Lobby and Lounge

BUILDING ENTRY, OFFICE LOBBY AND LOUNGE

Translucent Glass

The Office Entry is on Franklin Street and is recessed from the property 250 line to create a gracious entry to the building. A marquee CHURCH STREET extends over the sidewalk and within 2’ of the curb line to provide protection from inclement weather and to demarcate the building entry. Generously proportioned steps and an accessible lift mediate the level difference between the sidewalk and the ground floor lobby. The entry sequence is clad in black stone with the reception desk at the south end providing a visual marker that bring visitors and tenants into the space.

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

PROJECT:

4

5

6

7

4

8

5

6

7

8

250 CHURCH STREET NEW YORK, NY 10013

PROJECT NUMBER:

A

748.000

A

EXISTING PARTY WALL TO REMAIN UPTO LEVEL 07

OWNER / CLIENT :

MAPLE C 250 CHURCH OWNER, LLC 53 MAPLE AVENUE, MORRITOWN, NJ 07960 ARCHITECT :

A

2T

TEL.ROOM 011 253 SF

B

6B

2

6B

2

0F

0F 0F

6B

6B

6A

0F

2

120P 6B

2

UNISEX RESTROOM 005 67 SF

2

6B

6B

2

B 6B

120P

6B

STAIR B

6B

6S

2

6S

2

6B

2

6B

6S

2

2

6B

2

PE-1

2

2T

2T

FIRE PROTECTION :

8A

36"

36"

2

2T

EXIT DOOR B1

2F

STAIR B

6A

36"

EXISTING PARTY WALL TO REMAIN UPTO LEVEL 06

120P

6S

VERTICAL TRANSPORTATION :

22' - 1"

120P

6B

2

0F

AIR INTAKE SHAFT

2

2T

BOILER ROOM 013 758 SF

EXIT DOOR H2

2

36"

6S

ZEROLUX 8B 242 W 30TH STREET, LEVELCORRIDOR 2, NEW YORK, NY 10001 T. 212.209.1536

FIRE PURGE SMOKE SHAFT

EXIT DOOR F2

36"

120P

120P

CODE CONSULTANT / EXPEDITOR :

UNISEX RESTROOM A 0105 43 SF

2

FORTUNE SHEPLER SALING, INC. 6S 8752 FORREST DRIVE, HIGHLANDS RANCH, CO 80126 T. 720.438.1540 LIGHTING CONSULTANT : 2

2

6B

0F

2

4S

0F

2

6S

6S

2

8A

FIRE PURGE SMOKE SHAFT

2

4S

ELEVATOR PIT

6B

6S

8A

0F

8A

0F

0F

6A

2

ELECTRICAL ROOM 4S 0107 0F 63 SF

2

6B

0F

36"

36"

120P

PE-2

PE-3

PE-4

8A

120P

RETAIL A 001 1704 SF

STEEL FRAMED GLASS FLOOR ABOVE

STAINLESS STEEL BRACKETS AND HANDRAIL

UP

STONE WALL CLADING

4S

STONE FLOORING

2

STAIR PRESSURIZATION SHAFT

4S

STONE FLOORING

RECEPTION DESK

2

C

4A

4A

POLISHED STAINLESS STEEL ELEVATOR DOORS AND SURRONDS

ARCHITECT / ENGINEER SEAL

8A

120P

1

4A

4S

2

PEDESTRIAN CONTROL DEVICE FOR ADA

POLISHED STAINLESS STEEL ELEVATOR DOORS AND SURRONDS

RETAIL A 0101 2954 SF

D

1

LOBBY 0103 2067 SF

PEDESTRIAN CONTROL DEVICE

LAMINATED GLASS FLOOR WITH TRANSLUCENT INTERLAY

RETAIL B 002 1788 SF

TEXTURED LAMINATED GLASS STAIR TREADS WITH TRANSLUCENT INTERLAYER

2T

FIRE COMMAND CENTER

STAIR A

0F

C

120P

LOUNGE 003 2765 SF

1

2T

2

EXIT DOOR D

EXIT DOOR E1

POLISHED STAINLESS STEEL ELEVATOR DOORS AND SURRONDS

2

6A

0F

0F

STONE FLOORING

1

RESINOUS MATRIX TERRAZZO FLOORING

8A

PE-1

0F

0F

1

6B

UP

2

0F

6A

2T

+9'-7" FROM LEVEL 01 2HR HORINONTAL PARTITION

2

6A

6A

STAIR PRESSURIZATION SHAFT

0104 443 SF

RIZZO GROUP 1333 BROADWAY, SUITE 500, NEW YORK, NY 10018 0F T. 212.695.5980

UNISEX RESTROOM B 0106 43 SF 4A

C

2

B

120P

0F

36"

D

SUBMISSION / REVISION

GENERAL NOTES 1.

ALL DIMENSIONS ARE TO FACE OF FINISHED SURFACE, UNLESS SHOWN OR NOTED OTHERWISE

2.

THE GENERAL CONTRACTOR SHALL PROVIDE ALL BLOCKING REQUIRED TO ANCHOR WALL AND CEILING MOUNTED ITEMS, INCLUDING BUT NOT LIMITED TO TOILET ROOM ACCESSORIES, MILLWORK, CASEWORK, HANDRAILS, DOOR STOPS, ETC. AND ALL EQUIPMENT IDENTIFIED BY DRAWINGS OR SPECIFICATIONS AS CONTRACTOR INSTALLED.

STEEL FRAMED GLASS FLOOR ABOVE

D

3.

100% SCHEMATIC DESIGN

2019.12.20.

REV DESCRIPTION

GE 1. 2.

DN

DATE

DOB STAMP AND SIGNATURE

8A

THE GENERAL CONTRACTOR SHALL CONFIRM AND COORDINATE ALL CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING ITEMS

D

1

3.

The lobby and lounge are connected with a spiral glass stair cantilevered from the adjacent column. This sculptural element in the 4.

SUPPORTING CANTILIVERED GLASS STAIR TREADS

E

5.

8A

8A

1

1

6.

1

ALL DOORS SHALL BE LOCATED 4" FROM FACE OF NEAREST PARTITION TO THE INSIDE EDGE OF THE JAMB AT HINGE SIDE, UNO.

PARTIAL PLAN LEGEND ROOM NAME 101 150 SF

2T 2T

2T 2T

2T 2T

2T

ROOM NAME ROOM NUMBER ROOM AREA (SF)

MECHANICAL SHAFT

2T 2T

5. RETAIL B 0102 1885 SF

6.

N

KEY PLAN:

ILLUMINATED LIGHT BOXES

4.

ROOF SLOPE, CRICKET SLOPE, TAPERED INSULATION SLOPE EFFITIVELY 1/4" PER FT. MIN UNO.

STAINLESS STEEL HANDRAIL

2T 2T

8A

lounge contrasts with the orthogonal walls and columnar grid and provides a physical connection to these 2 levels. Two passenger elevators (PE-1 and PE-2) have been extended to the Cellar Level to further provide access to both levels. 8A

1

THE GENERAL CONTRACOR SHALL FIELD VERIFY ALL DIMENSIONS AND REPORT ANY DISCREPANCIES TO ARCHITECT.

PAR

FRANKLIN STREET

E

F

4B

CODE CONSULTANT, INC. 215 W 40TH STREET, 10TH FLOOR, NEW YORK, NY 10018 T. 212.216.9596

EXIT DOOR B3

2T

2T

2

4S

0F

PE-2

EXIT DOOR E2

36"

NEW 1HR SEPARATION WALL

0F

1

2

EXIT DOOR F

6A

UP

DN

0F

FACADE MAINTERNANCE :

AIR INTAKE SHAFT

EXISTING MASONRY WALL

6B

EXTERIOR ENCLOUSRE CONSULTANT :

2

TOILET EXHAUST SHAFT

0F

2

0F

6B

2T

2

4S

6S

CORRIDOR 006 1288 SF

6B

6B

BOHLER ENGINEERING 225 W 34TH STREET, SUITE 814, NEW YORK, NY 10122 T. 646.661.4200

ENTEK ENGINEERING, PLLC EXIT DOOR B2 166 AMES STREET, HACKENSACK, NJ 07601 T. 201.820.2803

B

6A

2

STAIR PRESSURIZATION SHAFT

0F

FIRE PUMP 009 336 SF

2

ENTUITIVE 0F 28 W 44TH STREET, NEW YORK, NY 10036 T. 718.280.5935 22' - 1"

2

2

ARCS ROOM 008 45 SF

2

6' WIDTH MOTOR MOUNTED ROLL-UP DOOR

C

6S

2F

CIVIL ENGINEER :

As one passes through the entry sequence, the adjacent and parallel light-filled lobby is revealed - a double-height space that engages and overlooks the Lounge on the Cellar Level. The lobby has a visual connection to the activity of Church Street which activates the lobby and lounge, and the recessed parabolic glass enclosure along the Church Street façade reduces visual reflections and creates an intimate connection with the lobby and lounge. The lobby floor is translucent glass allowing light to pass through as well as silhouetting the movement of people; the translucent floor serves to connect the lobby above and the lounge below through the passage of light and the movement of people. In contrast to the entry which is dark, the lobby and lounge are white and filled with light. The glazed parabolic façade along Church Street and the light wall directly beneath it on the Cellar level fill the space with both natural and temperaturecontrolled artificial light 6S

EXIT DOOR B1

36"

36"

SERVICE ELEVATOR LOBBY 016 226 SF

0F

2

EXIT DOOR B2

HIGHLAND ASSOCIATES ONE EAST 33RD STREET, NEW YORK, NY 10016 T. 212.681.0200

6A

6B

SERVICE ROOM 0108 94 SF

MEP ENGINEER :

LEONARD STREET

6B

2

2HR-RATED HORIZONTAL CONNECTION

UP

MCNAMARA SALVIA 45 WEST 45TH STREET, 10TH FLOOR, NEW YORK, NY 10036 T. 212.246.9800 SE-1

0F

LOADING 0110 274 SF

OFFICE 004 156 SF

A

2

2F

STRUCTURAL CONSULTANT :

SE-1

0F

6S

RAFAEL VINOLY ARCHITECTS 375 PEARL STREET, 31ST FL. NEW YORK, NY 10038 T: 212.924.5060

2T

TOILET EXHAUST SHAFT

FIRE ALARM PANELS

2T

RO

CHURCH STREET

PROJECT PHASE:

SCHEMATIC DESIGN

2T

EXISTING CONCRETE STRUCTURE

E

F

EXISTING MASONRY WALL NEW PARTIONS REFER TO SCHEDULES

Enlarged Plan - Cellar Level

CORE AND LOBBY FLOOR PLAN - CELLAR SCALE: 1/4" = 1'-0"

3A

1

101.1

WALL TAG REFER TO PARTITION SCHEDULES DOOR TAG

24" x 36" DRAWING TITLE:

PARTIAL FLOOR PLAN CORE AND LOBBY CELLAR

SHEET NUMBER:

© 2019 RAFAEL VINOLY ARCHITECTS PC

E

DRAWING SIZE:

SCALE:

A-120

DOB REV

Enlarged Plan - Ground Level CORE AND ELEVATOR LOBBY FLOOR PLAN - LEVEL 01 ELEV. LOBBY SCALE: 1/4" = 1'-0"

1


SCHEMATIC DESIGN REPORT - ARCHITECTURE Office Lobby and Lounge

B

T e

G e i

A a l

i t t

f c

T l

e

C

T r w

P f p 3


Professional Work

03/

Florence Airport Rafael Vinoly Architect 2019.03 - 2020.06 (3month) Competition Airport

1.Performs original design work utilizing specifications, sketches and ideas on developing designs. 2. Assists in preparation of layout and draws preliminary sketch of project to present to client. 3. Assists in conducting preliminary studies of proposed projects to obtain information as to space and design requirements, obtaining measurements and making sketches preliminary to the preparation of drawing (AutoCAD, Rhino, Grasshopper, Photoshop, Illustrator, and Indesign) 4. Design developing with 3D modeling and Rendering

AERIAL VIEW FROM LANDSIDE


Proposed Proposed FaceFace to Face to Face Arrangement Arrangement Conventional Conventional SideSide by Side by Side Arrangement Arrangement Conventional Conventional Stacking Stacking Arrangement Arrangement Proposed Face to Face Arrangement Conventional Stacking Arrangement

Side by Side Arrangement DesignConventional Concept / Airport Typology

DESIGN CONCEPT | REFERENCE TO TUSCAN LANDSCAPE

al al al Arriv Arriv Arriv ture ture ureeparDepar artD Dep

SITE PLAN

Conventional Side by Side Arrangement

RAFAEL RAFAEL VINOLY ARCHITECTS VINOLY ARCHITECTS | TOSCANA | TOSCANA AEROPORTI AEROPORTI ENGINEERING ENGINEERING | 24 JUNE, | 24 2019 JUNE, 2019 RAFAEL VINOLY ARCHITECTS | TOSCANA AEROPORTI ENGINEERING | 24 JUNE, 2019

Allowing Allowing for a “Piazza” for a “Piazza” Allowing for a “Piazza” in Between in Between in Between

ture ture ureeparDepar artD Dep al al al Arriv Arriv Arriv

Conventional Stacking Arrangement

al al al Arriv Arriv Arriv

e e rtur partur turepa par De De De

Proposed Face to Face Arrangement

Tuscan Landscape

RAFAEL VINOLY ARCHITECTS | TOSCANA AEROPORTI ENGINEERING | 24 JUNE, 2019

4 4

4

6


Program and Circulation

PROGRAM AND CIRCULATION

CIRCULATION Schengen Extra Schengen Schengen Departure Extra Schengen Departure Transfer PROGRAM Retail Departure Hall Security Check Arrival Hall Baggage Claim Restroom / Storage Egress RAFAEL VINOLY ARCHITECTS | TOSCANA AEROPORTI ENGINEERING | 24 JUNE, 2019

29


Terminal Circulation

TION TERMINAL CIRCULATION DESIGN CONCEPT | REFERENCE TO TUSCAN LANDSCAPE

MEZZANINE LEVEL GROUND LEVEL

GROUND LEVEL

Land

Land Infill

Parking

Terminal is covered by a Productive Green Roof

Shopping

Departure

Mall

Use

Duty Free

MEZZANINE LEVEL CONCOURSE LEVEL

Security +24.2m +20.2m

DutyVIP Free

Gates Arrival Platform

Drop Off

Departure

Pick Up

Arrivals

VIP

Airside

Gates Arrival Platform


ROOF DETAIL | VINE POT SYSTEM

Details

STRUCTURAL ELEMENTS

VINES

SKYLIGHT PRECAST CHANNEL BEAM

VINE POST

WELDED STEEL BOX GIRDER

RAFTER INSULATED LAMINATED GLASS

PIAZZA

IRRIGATION SYSTEM SOIL/PLAN MEDIUM FOR VINES

TENSION TIE

PRECAST CONCRETE CAST STEEL STRUCTURAL NODES

STYROFOAM

COMPRESSION SHAFT

FILTER FABRIC ROOT BARRIER

CAST COLUMN HEAD

WATERPROOFING MEMBRANE

COLUMN WITH PYRAMIDAL CAPITAL NEST

RAFAEL VINOLY ARCHITECTS | TOSCANA AEROPORTI ENGINEERING | 24 JUNE, 2019

Structural Detail

35

RAFAEL VINOLY ARCHITECTS | TOSCANA AEROPORTI ENGINEERING | 24 JUNE, 2019

Roof Detail(Vine Pot System)


GATES

Gates

RAFAEL VINOLY ARCHITECTS | TOSCANA AEROPORTI ENGINEERING | 24 JUNE, 2019


Professional Work

04/

Professional Work

Ocean Center

Caza Architect 2017.09 - 2017.12 (5months)/ Concept/SD/DD Mixed Used Building Re-Thinking in the Future 1st Award

01 Ocean Center

1.Performs original design work utilizing specifications, sketches and ideas on developing designs. 2. Assists in preparation of layout and draws preliminary sketch of project to present to client. 3. Assists in conducting preliminary studies of proposed projects to obtain information as to space and design requirements, obtaining measurements and making sketches preliminary to the preparationCaza of drawing (AutoCAD, Architect ¡ 2017 Rhino, Grasshopper, Photoshop, Illustrator, and Indesign) 4. Design developing with 3D modeling and Rendering Mixed Used Building

Re-Thinking in the Future 1st Award

Designa acivic civiccenter centerfor fora acoastal coastalvillage villagewith witha abooming boomingtourism tourismmarket. market.The Thecenter centershould shouldprovide providestructures structureswith withyear-round year-roundpublic publicuse usethat thatrange rangefrom fromrecreational recreationaltotocommercial commerDesign cial the withgoal the of goal of giving artisans and farmers a place to engage with outsiders ensuring that centers is integrated intoocean-side the ocean-side landscape in athat way acknowledges that acknowlwith giving local local artisans and farmers a place to engage with outsiders whilewhile ensuring that centers is integrated into the landscape in a way edges the massive by architecture from climate the massive risks by risks architecture from climate change.change. CoastalArchitecture Architectureininthe theage ageofofclimate climatechange changehas hasbecome becomean anincreasingly increasinglyprecarious precariousproposition. proposition.AtAtthe theOcean OceanCenter Centerproject, project,we wedeveloped developeda away wayofofbuilding buildinginina acoastal coastalenviCoastal environment that anticipates massive change. Both ground and structure are designed as open systems that enable surroundings to through flow through in calculated and measured ronment that anticipates massive change. Both ground and structure are designed as open systems that enable their their surroundings to flow in calculated and measured ways so ways soforces that the forces of naturearchitectural activate architectural at intensities. different intensities. The modulation naturalsuch systems as air movement, solar radiation, and tidal through currentsthe that the of nature activate spaces at spaces different The modulation of naturalofsystems as airsuch movement, solar radiation, and tidal currents through the techniques architectural walls, anditfloor makes it possible to the materialization of program through nature. architectural of techniques walls, roofsofand floorroofs makes possible to determine thedetermine materialization of program through nature.


CULTURE & GEOGRAPHY

Economy & Hisotry

Filipino Ethnicities

Ocean Center·


PROGRAM

ELEMENTS

Museum Program

Archipelagic Program

Figure and Site

Retail Apartment

Restaurants

Market

Apartment

Spa & Gym

Convention Center

Museum

Market

Convention Center

Recreation Area

Professionalwork I


PARALLEL ORTHOGRAPHY

1. Museum 2. Market 3. Drop- off 4. Recreational Area 5. Restraurant 6. Convention Center 7. Artificial Beach 8. Cafe 9. Retaining Pool 10. Botanical Garden 11. Power Hiouse 12. Bahia 13. Grand Stand

Ocean Center·


FORM & GEOMETRY

Professionalwork I


Ocean Center¡


ENVIRONMENTAL STRATEGY

Professionalwork I


SECTION

Ocean Center·


VIEW-APARTMENT

Professionalwork I


VIEW - MARKET I

Ocean Center·


VIEW - CONVENTION CENTER

Professionalwork I


VIEW - MARKET II

Ocean Center·


Professional Work

05/

Field of Terra Fluxes DND Architecture 2012.09 - 2012.12 (4months)/ Concept/Competition Bridge AC-CA Architectural Competition

Professional Work 1.Performs original design work utilizing specifications, sketches and ideas on developing designs. 2.Used multiple design programs to create photo-realistic renderings. 3.Conducted research and site survey for the design team. 4.Prepared working drawings and managed presentation drawings.

07 Field of Terra Fluxes Professional work· 2012 ·DND Architecture AC-CA Competition

This proposal is started from reconsideration of bridge as a byproduct from industrial society as visual and functional perspective by placing nature and human on the dichotomy thought. Experience of relationship as a main concept the revelation of ‘visual’ function from bridge is allowed to be feasible in the consideration of characteristics of Amsterdam This and proposal is startedand from reconsideration of bridge as a byproduct society as visual and functional perspective by placing nature and human on the flow, dichotomy city its continuity; making figuration for short story of memoryfrom withindustrial experiential formation. The Characteristic of geography in Amsterdam, which is a flexible is to be thought. Experience of tis relationship as aa tool mainproviding concept the revelation of ‘visual’ function bridge is allowed to be feasible inrelationship the consideration of characteristics of Amsterdam configured and it gives meaning as various social and cultural events.from The proposed bridge has a symbiotic with nature in the everyday life which city andenjoying its continuity; and making figuration for short story of memory experiential The Characteristic of city. geography in Amsterdam, which isthe a flexible is to be allows spare times and seeks for various cultural activities. Newwith bridge provides formation. various experiences as a part of Through this, it is to confirm identityflow, of city and configured and it gives tis meaning as a tool providing various social and cultural events. The proposed bridge has a symbiotic relationship with nature in the everyday life which raise the city value for Amsterdam. allows enjoying spare times and seeks for various cultural activities. New bridge provides various experiences as a part of city. Through this, it is to confirm the identity of city and raise the city value for Amsterdam. The juxtaposition that is not planned between the programs. The possibility of eventual space is to be found with horizontal field that is laminated, non-hierarchy and fluid. The space allows three-dimensional experience from two-dimension is to be formed and allows multi-level experiences by placing program. The natural boundary vertically formed The juxtaposition that is not planned between the programs. The possibility of eventual space is to be found with horizontal field that is laminated, non-hierarchy and fluid. The between sky and water is controlled and the relationship of city landscape is horizontally to be intimated. The playground, observation platform, resting place provided inside of space allows three-dimensional experience from two-dimension is to be formed and allows multi-level experiences by placing program. The natural boundary vertically formed bridge will make various stories through natural and artificial experiences within the city and relationship with nature and human. between sky and water is controlled and the relationship of city landscape is horizontally to be intimated. The playground, observation platform, resting place provided inside of bridge will make various stories through natural and artificial experiences within the city and relationship with nature and human.


CONCEPT & PROCESS

Bridge for memory of City As a part of city, the interest towards bridge as a revealing tool that configures reappearance of memory and experiences is shaped through the relationship between geographical form and liquidity that canal has. These phenomenon’s are experienced as everyday life in the city and this is used as an important factor to make the formation of city the proposed bridge adopts configured pattern of city at visual level to transform and configure the experiences to 3-dimensional space. Memory and desire through the spatial experiences; and through this, the bridge realized the geographical, social and imaginative space that seeks for the possibility and relationship with society.

Bridge beyond Functional figure

Bridge as Landform

This proposal, as a truth of goal-oriented function based on the speed and direction as a vector, is to reject the bridge. New bridge reveals potential poetic meaning and ‘relationship Through the concept of ‘filed’. The logic of effciency0 focused and goal-oriented in the functionalism is excluded; and as a meaning of bridge, which is not for aesthetic values, the rich event of potential spatial experiences in the city is to be revealed. It recovers the sense of planeness through the represent of daily experiences of detouring, slowness, wandering and parking in the city. In other words, it focuses on the reconfiguration of bridge as a tool recovering potential poetic meaning and interrelationship.

The continuity of city is drawn and the interrelationship with city, nature and peoples to be made by shape of landform. This goes beyond the image of rupture that bridge has and has its’ meaning as a tool controlling the relationship to be created at the equipment maximizes the movement. The allness is recovered through the controls of bridge’s continuity and boundary and combination of relationship with surroundings. New network of topology is to be realized through reiteration, repeating, and distortion of land.

Field of Terra Fluxes


DESIGN PROCESS

Academicwork I


PLAN & ELEVATION

Field of Terra Fluxes


Floating; Public Center of Low Carbon City Academic Work

06/

Floating; Public Center

Syracuse University · 2015 · Team (Mei Fupeng, Sehyun Lee) Type: Mixed Used (Hotel · Office · Dormitory) Shenzhen Low Carbon City Competition - Honorable Award)

n Low Carbon City hasSyracuse beenUniversity under construction since 2010. By1.Performs rethinking the between and tower, Floating intends to create a public center not o original design workrelationship utilizing specifications, sketches and ideaspodium on developing designs. 2.Collaborated all discipline’s 3d Rhinobeen models and 2015.09for - 2015.12 (4months)/ Concept Low Carbon City area, but Pingdi city more widely. In this design, our aim has todrawings(AutoCAD) maximize the potential of Low Carbon City by inserting a series of public activ new creative ideas and innovative programs such as REVIT and Illustrator to better designs for competition. Used (Hotel · Office · Dormitory) otherwise inactivatedMixed spaces. The project’s contention is that3.Introduced Low Carbon City is best conceived as a Green building-Public Center – that is, as a neighborhood capabl 4.Created physical architecture models for presentation purposes. Shenzhen Low Carbon City Competition - Honorable Award) ng the wider population about the benefits of a low carbon lifestyle through the construction of a series of public events. Visitors to the Green Building Public Center c nce a range of sustainable technologies via a series of calibrated activities. The building’s form matters. The thinner-than usual tower permits daylight to permeate the traditional podium is dissolved to produce a number of public platforms. In the daytime, theses steel platforms are designed to reflect the sky, and at night the densit Shenzhen Low Carbon City has been under construction since 2010. By rethinking the relationship between podium and tower, Floating intends to create a public center not only ed stainless steel plates permits light from the building’s interior to escape into the neighboring public spaces. for the Low Carbon City area, but for Pingdi city more widely. In this design, our aim has been to maximize the potential of Low Carbon City by inserting a series of public activially, the ties proposed building contains threeThe systems organization: system vertical system of horizontal circulation across the platforms, into otherwise inactivated spaces. project’sofcontention is that aLow CarbonofCity is best circulation, conceived as aa Green building-Public Center – that is, as a neighborhood capableand of a system connectinforming the building to its surrounding environments. Our thesis is that this simple combinatory strategy is capable of creating a vertical building typology the wider population about the benefits of a low carbon lifestyle through the construction of a series of public events. Visitors to the Green Building Public Center can suitable fo bon city.experience a range of sustainable technologies via a series of calibrated activities. The building’s form matters. The thinner-than usual tower permits daylight to permeate the interior. The traditional podium is dissolved to produce a number of public platforms. In the daytime, theses steel platforms are designed to reflect the sky, and at night the density of perforated stainless steel plates permits light from the building’s interior to escape into the neighboring public spaces. Generally, the proposed building contains three systems of organization: a system of vertical circulation, a system of horizontal circulation across the platforms, and a system that seeks to connect the building to its surrounding environments. Our thesis is that this simple combinatory strategy is capable of creating a vertical building typology suitable for a Low carbon city.


PUBLIC PODIUM

CONCEPT & PROGRAM

Vertical Module system

Horizontal Podiums System

Public Connection

Floating : Public Center


BUILDING CIRCULATION & PROGRAM

PLANS

Academicwork I


PUBLIC ACTIVITIES

Floating : Public Center


SUSTAINABLE ANALYSIS

Academicwork I


MODULE SYSTEM

Floating : Public Center


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.