00
A B O U T M Y S E L F
01
S K I L L S
SEISMIC URBAN PLANNING
RESEARCH PROJECT 2018-2022
THE QUALITY OF THE URBAN ENVIRONMENT IN TERMS OF IMPROVING THE REGULATORY FRAMEWORK FOR THE PLANNING AND FOR THE IMPROVEMENT OF THE SPATIAL STRUCTURE CAN BE IMPROVED BY MOVING TO A MOBILE AND DYNAMIC URBAN STRUCTURE THAT MEETS ALL PARTIES ' INTERESTS, THROUGH THE INTRODUCTION OF CONFLICT-A PREDICTIVE MODEL OF URBAN PLANNING, ONE RESULT OF WHICH IS THE ALLOCATION OF UNIVERSAL URBAN PATTERNS. SOCIO-SPATIAL ORIENTED PLANNING SYSTEM AS AN OBJECT OF PLANNING IS BASED ON RESEARCH.
1. BUFFERING NEW INTER-CENTER ZONE OF REGULATION OF BUILDING ON THE PRINCIPLE OF "TRANSITION BUFFER ZONE".DEPARTURE FROM THE POINT OF DEVELOPMENT TO THE GRADUATED DISPERSION OF POTENTIALS. FOR EXAMPLE, AN UNLIMITED AREA FOR DEVELOPMENT with SET DEVELOPMENT PARAMETERS, and RESPONSIBILITY CURVES, i.e. NEIGHBORING PLOTS AUTOMATICALLY RECEIVE PART of the DEVELOPMENT PARAMETERS
2. ELASTICITY THE FORMATION OF NEW ELASTIC CENTER-TO-CENTER CONNECTIONS.THE NECESSARY DENSITY OF LINEAR CONNECTIONS CREATES A PHYSICAL FIELD QUALITY THAT ALLOWS SPACE AND HORIZONTAL PROCESSES TO FUNCTIONALLY STRETCH AND CONTRACT, WHILE ERASING PHYSICAL BOUNDARIES.(EXAMPLE: BLURRING THE BOUNDARIES OF A BLOCK AND A STREET)
3. DEPRECIATION THE NEW ZONE OF REGULATION OF BUILDING DEVELOPMENT-UNDERDEVELOPMENT ON THE PRINCIPLE OF "SHOCK ABSORPTION".THE ABILITY OF THE ENVIRONMENT TO ABSORB DISTURBANCES BY INCREASING THE INTENSITY OF HORIZONTAL PROCESSES IN THE NODES OF DEVELOPMENT DUE TO MEASURES FOR SPATIAL DEVELOPMENT.FOR EXAMPLE, THE DEVELOPMENT OF THE SITE MUST BE CONDUCTED PRIORITY ACTIONS ON ARCHITECTURAL, INFRASTRUCTURAL, SOCIO-CULTURAL REVATIO TERRITORY IN GRADED ORDER
02
P R I N C I P A L S
4. PENDULUM THE NEW ZONE OF REGULATION OF BUILDING ON THE PRINCIPLE OF "PENDULUM STRATEGIC MASS".DUE TO THE ELASTICITY OF SPACE, NEW NODES, OR DEVELOPMENT NODES MUST HAVE THE ABILITY TO ADJUST THE PARAMETERS OF GROWTH IN THE PROCESS OF FUNCTIONING, REDISTRIBUTING POTENTIALS IN TIME AND SPACE.FOR EXAMPLE, THE TRANSITION TO A SYSTEM OF PHASED CONTRACTS FOR THE DEVELOPMENT OF TERRITORIES REGARDING THEIR FUNCTIONING IN THE ENVIRONMENT. That is, NOT IMMEDIATELY USE the FULL POTENTIAL of the GROWTH PARAMETERS, BUT FIRST 50%, AFTER 3 YEARS, 30%, AFTER 5 YEARS, 20%.
5. STRUCTURAL MEMORY A NEW ZONE REGULATION DEVELOPMENTS CERTAINTY-UNCERTAINTY ON THE PRINCIPLE OF " STRUCTURAL MEMORY."IDENTIFICATION AND CODING OF ESPECIALLY SIGNIFICANT EXISTING PARAMETERS OF THE URBAN ENVIRONMENT.
6. FUSES (POSSESSORS) ВНЕДРЕНИЕ ADMINISTRATIVE "FUSES" - IF THE SUM OF PROCEDURES EXCEEDS THE CONFLICT THRESHOLD OR THE DEVELOPMENT NODE IS DEFINED OUTSIDE THE BUFFER ZONE, IT IS PROPOSED TO "PLAY BACK" PART OF THE DECISIONS TO RETURN THE NODE TO THE ZONE. IT IS PROVIDED BY REGULATORY AND INFORMATION MODULES.
7. PROCEDURAL MEMORY INFORMATION FORMATION AND MAINTENANCE OF THE SYSTEM OF CONFLICT NODES IN THE SPECIFIED PARAMETERS IN ORDER TO AVOID LARGE DISTURBANCES.CALCULATION OF THE RANGE OF DEVELOPMENT OF THE URBAN ENVIRONMENT IN ACCORDANCE WITH THE STRUCTURAL MEMORY.
03
P R I N C I P A L S
04
INTERNATIONAL WORKSHOP Moscow 2050 Shenzhen Biennale Facing new urban challenges: towards the Zero emissions city PROPOSAL THE PROJECT IS AN INFORMATION STRUCTURE OF URBAN CONFLICTS IN THE PLANNING ORGANIZATION OF THE CITY OF MOSCOW, WHICH IS BUILT BY BUILDING CONFLICT ZONES FROM THE COLLISION OF VERTICAL AND HORIZONTAL URBAN PROCESSES (OR ON THE PRINCIPLE OF APPLICATION OF VERTICAL DEVELOPMENT POTENTIALS: ADMINISTRATIVE, PUBLIC, INVESTMENT; AND THEIR HORIZONTAL COUNTERPARTS: REAL URBAN PROCESSES). WORK IN THESE AREAS INVOLVES THE USE OF OTHER URBAN PLANNING TOOLS AND THE GENERATION OF "NON-CONFLICT" URBAN ENVIRONMENT THROUGH THE 7 PRINCIPLES: -
DEPRECIATION
-
BUFFERING
-
PENDULUM
-
SAFETIES
-
PROCEDURAL MEMORY
-
STRUCTURAL MEMORY
-
ELASTICITY
R E S E A R C H P R O J E C T S
05
R E S E A R C H P R O J E C T S
EUROPAN
06
INTERNATIONAL COMPETITION 2019 WARSAW
TYPE: RESEARCH ANALYSIS OF THE GUTA DISTRICT IN WARSAW PLACE OF WORK ON THE PROJECT: INTERNATIONAL COMPETITION FOR THE 2019 EUROPEAN STAGE OF INVOLVEMENT: CONCEPT, RESEARCH DEGREE OF PARTICIPATION: RESEARCH MANAGER RESPONSIBILITY: CONCEPT, MODELING, SEARCH FOR INNOVATIVE PARAMETERS, OPTIONS FOR BUILDING AND ORGANIZATION OF THE ENVIRONMENT DURATION OF PARTICIPATION: 3 MONTHS THE PROJECT IS AN ANALYSIS AND PROTOTYPING OF SOLUTIONS OF THE DEPRESSED DISTRICT OF GUTA IN WARSAW WITH AN ABANDONED METALLURGICAL PLANT. PROCEDURAL, ADMINISTRATIVE, REGULATORY, PROJECT, NORMATIVE, STRUCTURAL GROUPS OF CONFLICTS ARE ANALYZED USING SOFTWARE ALGORITHMS ON A CITY SCALE. THE OBTAINED DATA ALLOWED TO FORM THE INITIAL DATA FOR THE PRINCIPLES OF URBAN PLANNING OF THE QUARTER: DEPRECIATION, BUFFERING, PENDULUM, FUSES, ELASTICITY OF SPACE.
R E S E A R C H P R O J E C T S
07
R E S E A R C H P R O J E C T S
SOCHI - MACESTA
08
INTERNATIONAL COMPETITION 2017
U R B A N -
GRAND PRIX AUDIENCE VOTING
GOVERNMENT DIPLOMA
TYPE: URBAN PLANNING URBAN PLANNING CONCEPT OF FORMATION OF THE CARCASS OF MATSESTA RIVER IN SOCHI
THE THE
PLACE OF WORK ON THE PROJECT: INTERNATIONAL COMPETITION STAGE OF INVOLVEMENT: CONCEPT, RESEARCH DEGREE OF PARTICIPATION: RESEARCH MANAGER RESPONSIBILITY: CONCEPT, MODELING, SEARCH FOR INNOVATIVE PARAMETERS, OPTIONS FOR BUILDING AND ORGANIZATION OF THE ENVIRONMENT DURATION OF PARTICIPATION: 3 MONTHS
THE PROJECT IS AN ORGANIZATION OF THE MACESTA RIVER VALLEY, WHICH IS IN AN ABANDONED STATE. SCATTERED AND UNRELATED ZONES OF TRADE, RESIDENTIAL AND PUBLIC BUILDINGS ARE CONNECTED IN THE PROJECT INTO A SINGLE SYSTEM. PARTICULAR ATTENTION IS PAID TO THE CLUSTER FORMATION OF NEW RECREATIONAL AREAS ALONG THE MACESTA RIVER, AND CONNECTED BY A CONTINUOUS SYSTEM OF PUBLIC TRANSPORT
P L A N N I N G P R O J E C T S
STRELKA - 1
INTERNATIONAL COMPETITION 2017
-
- SHORT LIST AUDIENCE VOTING
TYPE: ARCHITECTURAL AND URBAN PLANNING TYPOLOGY OF BLOCKS RESIDENTIAL BUILDINGS
WITH
LOW-RISE
PLACE OF WORK ON THE PROJECT: INTERNATIONAL COMPETITION HOUSE. RF STAGE OF INVOLVEMENT: CONCEPT, RESEARCH DEGREE OF PARTICIPATION: RESEARCH MANAGER RESPONSIBILITY: CONCEPT, MODELING, SEARCH FOR INNOVATIVE PARAMETERS, OPTIONS FOR BUILDING AND ORGANIZATION OF THE ENVIRONMENT DURATION OF PARTICIPATION: 3 MONTHS
THE PROJECT IS A QUARTERLY UNIT WITH MIXED LOW-RISE RESIDENTIAL BUILDINGS, WHICH MANAGED TO FORM STRUKTURNY GRADIENT FROM THE ACTIVE WORKING ZONE WITH ACCESS TO THE CENTRAL AREA, NONRESIDENTIAL FIRST FLOORS TO PARKLAND AND ACTIVATION OF RECREATIONAL AREAS.
09 M I X E D P R O J E C T S A R C H P L A N N I N G
10 M I X E D P R O J E C T S A R C H P L A N N I N G
STRELKA - 2
INTERNATIONAL COMPETITION 2018
-
SHORT LIST
TYPE: ARCHITECTURAL AND URBAN PLANNING STANDARDIZATION OF THE RESIDENTIAL UNITS PLACE OF WORK ON THE PROJECT: INTERNATIONAL COMPETITION HOUSE. RF STAGE OF INVOLVEMENT: CONCEPT, RESEARCH DEGREE OF PARTICIPATION: PROJECT MANAGER RESPONSIBILITY: CONCEPT, MODELING, SEARCH FOR INNOVATIVE PARAMETERS, OPTIONS FOR BUILDING AND ORGANIZATION OF THE ENVIRONMENT DURATION OF PARTICIPATION: 3 MONTHS
THE PROJECT IS A BLOCK UNIT WITH A MIXED MEDIUM AND MULTI-STOREY RESIDENTIAL DEVELOPMENT WITH ACTIVE FRONTS ALONG THE STREETS, AS WELL AS A TRANSFORMABLE COURTYARD. THE RESULT IS A UNIFIED ORGANIZATION OF ARCHITECTURAL AND URBAN ELEMENTS ASSOCIATED WITH THE INTERNAL ORGANIZATION OF SPACE. THE ARCHITECTURE OF THE BUILDING FORMED A TYPOLOGY OF MODULAR APARTMENTS WITH 16 TYPES OF TRANSFORMABLE FUNCTIONAL STRUCTURES.
11 M I X E D P R O J E C T S A R C H P L A N N I N G
12 M I X E D P R O J E C T S A R C H P L A N N I N G
GOLDEN NEIGHBOURHOOD 2017 TYPE: ARCHITECTURAL AND URBAN PLANNING RESIDENTIAL COMPLEX " GOLDEN QUARTER» PLACE OF WORK ON THE PROJECT: MOSPROEKT-4 PARTICIPATION STAGE: CONCEPT, AGR, PROJECT DEGREE OF PARTICIPATION: ARCHITECT IN THE TEAM RESPONSIBILITY: CONCEPT, MODELING, SEARCH FOR BUILDING OPTIONS AND ORGANIZATION OF THE ENVIRONMENT DURATION OF PARTICIPATION: 6 MONTHS
13
A R C H I T E C T U R A L P R O J E C T S
PICTORIAL PUZZLES 2018-20//
ART PROJECT
TYPE: ARTISTIC THE CONCEPT OF CODING PUZZLES PLACE OF WORK ON THE PROJECT: PERSONAL STUDIO PARTICIPATION STAGE: CONCEPT, IMPLEMENTATION DEGREE OF PARTICIPATION: HEAD RESPONSIBILITY: CONCEPT, MODELING, IMPLEMENTATION DURATION OF PARTICIPATION: 18 MONTHS
THE PROJECT IS A DECORATIVE PUZZLES IN THE FORM OF ARTISTIC ABSTRACTIONS, EACH HAVING ARTISTIC VALUE. THE COMPOSITION ALGORITHM IS THE ENCODING OF A CHRONOLOGICAL LINE IN 12 COLORS. THE SOURCE OF INFORMATION IS THE ELECTRONIC TRACE OF A PERSON (SOCIAL NETWORKS) AS A RESULT, AN ABSTRACT PORTRAIT OF A PERSON IS BUILT-A PUZZLE OF HIS BIOGRAPHY IN CHRONOLOGICAL SEQUENCE. THE SIZE OF THE PUZZLE IS BOTH A PICTURE AND A SMALL TILE.UNIVERSAL FILLING AND FORMING OF THE WALL SURFACE IN THE INTERIOR.
14
A R T P R O J E C T S
15
O T H E R S
ADDITIONALS
16
UAR 2018
INTERNATIONAL COMPETITION
-
U R B A N
SHORT LIST
TYPE: URBAN PLANNING URBAN CONCEPT OF THE CHEREMUSHKI. MOSCOW
DISTRICT
20-21.
PLACE OF WORK ON THE PROJECT: INTERNATIONAL CONTEST OF THE RUSSIAN UNION OF ARCHITECTS STAGE OF INVOLVEMENT: CONCEPT, RESEARCH DEGREE OF PARTICIPATION: RESEARCH MANAGER RESPONSIBILITY: CONCEPT, MODELING, SEARCH FOR INNOVATIVE PARAMETERS, OPTIONS FOR BUILDING AND ORGANIZATION OF THE ENVIRONMENT DURATION OF PARTICIPATION: 3 MONTHS
P L A N N I N G P R O J E C T S
EVOLO 2018
17
INTERNATIONAL COMPETITION
-
SHORT LIST
P R O J E C T S
18
P R O J E C T S
19
P R O J E C T S
DSK NEIGHBOURHOOD
20
2015
-
DIPLOMA
P R O J E C T S
VOLGA RIVER CHANNEL 2015
21
P R O J E C T S
22
P R O J E C T S
MARCHI EXHIBITION
23
2015
-
WINNER
P R O J E C T S