Table 5. Medium and Low Priority/Long-Term Improvements Recommendation
Location
Close slip lane* (medium priority)
Lake Merced at Winston Dr.
Implementing Party
Construction Timeline
Lake Merced Blvd. at Sunset Blvd. Lake Merced Blvd. at Font Blvd. Install or improve pedestrian refuge island (medium priority)
Lake Merced Blvd. at Higuera Ave.
Install bike facilities (medium priority)
Lake Merced Blvd. between John Muir Dr. and Skyline Blvd.
Install lighting at pedestrian or street level* (medium priority)
Lake Merced Blvd. between Sunset Blvd./Winston Dr.
Install new pedestrian crossing (low priority)
Lake Merced Blvd. between Sunset Blvd./Middlefield Dr.
Lake Merced Blvd. at Lake Merced Hill Lake Merced Blvd.at John Muir Dr. To Be Determined- Based on future funding opportunities
Lake Merced Blvd. between Font Blvd./Higuera Ave. Lake Merced Blvd. at Lake Merced Hill Install or improve pedestrian refuge island (low priority)
Lake Merced Blvd. at Middlefield Dr.
Widen or add sidewalk (low priority)
Bulb or widening on Lake Merced Blvd. & Winston Dr. at path Add sidewalk on east side after Lake Merced Hill to John Muir Dr. Bulb-outs at intersection of Lake Merced and Skyline Blvd.
*Install lighting is under the confines of the SF Public Utilities Commission (SFPUC) and requires coordination and additional funding. *Slip lane closures are not supported unanimously by the Steering Committee. Further discussion and analysis regarding any slip lane closure can be included in the Lake Merced Quick-Build Project outreach process.