DETAILING FORENSICS 21 OSSINGTON AVENUE INTD 4004 DECEMBER / 22 / 2017 PRESENTED BY // SHARON MURAD
Architect(s)
Daniel Libeskind
Location
100 Queens Park Toronto, ON M5S 2C6
Project Year 2007
Square Footage
[rom.on.ca]
214,000 sq. ft.
[torontoist.com] [payload.cargocollective.com]
Concept
"Why should one expect the new addition to the ROM to be 'business as usual'? Architecture in our time is no longer an introvert's business. On the contrary, the creation of communicative, stunning and unexpected architecture signals a bold re-awakening of the civic life of the museum and the city." - Daniel Libeskind (rom.on.ca)
INSPIRATIONAL PRECEDENT // ROM, TORONTO
/1/
[thegrumpyoldlimey.com]
[urbantoronto.ca]
[buildipedia.com]
DETAILING FORENSICS INTD 4004 DECEMBER / 22 / 2017 PRESENTED BY // SHARON MURAD
Architect(s)
K2S Architects
Location
Simonkatu 7 Helsinki 00100 Finland
Project Year 2012
Square Footage 3229 sq. ft.
Concept
"This small wooden chapel introduces a place for silence and peace in the lively commercial centre of Helsinki. The interior is warm and enclosed from the surrounding urban life. Indirect toplight enlightens the wooden chapel interior. The chapel provides services by both Helsinki Parish Union and the city of Helsinki." (k2s.fi)
DETAIL PRECEDENT // WOODEN CHAPEL, FINLAND
/2/
[k2s.fi]
[architectmagazine.com]
DETAILING FORENSICS INTD 4004 DECEMBER / 22 / 2017 PRESENTED BY // SHARON MURAD
Architect(s)
SARC Architects
Location
Yliopistokatu 6 80130 Joensuu Finland
Project Year 2004
Square Footage 82,344 sq. ft.
Concept
"Metla is the biggest forest research centre in Europe. The structure with long spans enables flexible use of the building. Simple volume saves heating costs while vertical wooden shades protect from excess heat." (sarc.fi) [archdaily.com]
DETAIL PRECEDENT // FINNISH FOREST RESEARCH INSTITUTE, FINLAND
/3/
[sarc.fi]
[archdaily.com]
DETAILING FORENSICS INTD 4004 DECEMBER / 22 / 2017 PRESENTED BY // SHARON MURAD
FORENSIC SKETCH ANALYSIS
/4/
DETAILING FORENSICS INTD 4004 DECEMBER / 22 / 2017 PRESENTED BY // SHARON MURAD
4
3
2
1A
1
12'-11 21 "
9’-8”
9'-9 41 "
EXPOSED EXTERIOR BRICK WALL PAINT FINISH
WOOD PLANK FLOORING PAINT FINISH 1’
25’-3”
13'-4"
13'-6"
12’-10”
EXTERIOR BRICK WALL PAINT FINISH
METAL STAIRS
POURED CONCRETE FLOORING UNFINISHED 0"
0"
3
1 SECTION //
/5/
2
NORTH SECTION 3/16" = 1'-0"
DETAILING FORENSICS INTD 4004 DECEMBER / 22 / 2017 PRESENTED BY // SHARON MURAD
STEEL COLUMN
1’
STEEL PLATE BOLT
1’
2’
CONCRETE FOUNDATION
2 DETAIL SECTION
/6/
ANGLED STEEL COLUMN DETAIL SECTION 1" = 1'-0"
DETAILING FORENSICS INTD 4004 DECEMBER / 22 / 2017 PRESENTED BY // SHARON MURAD
SPRUCE PLANKS, STAINLESS STEEL SCREWS AIR CAVITY
AIR GAP, VERTICAL FURRING STRIPS, LATH SHEATHING
WOOD BRACING MINERAL WOOL INSULATION LATH
OILED ALDER PLANKS
1’
2’-10 1/2”
CONCRETE FOUNDATION
3 DETAIL SECTION
/7/
ANGLED EXTERIOR WALL DETAIL SECTION 1" = 1'-0"
DETAILING FORENSICS INTD 4004 DECEMBER / 22 / 2017 PRESENTED BY // SHARON MURAD