in
t
e
rio r d e s Sarah Johnson
portfolio 2018 - 2020
ig
n
about me Hi there, my name is Sarah. I consider myself one third Texan, one third Arkansan, and one third Midwestern, which throughout my life has given me a deep love and appreciation of both rural and urban spaces. Fortunately for me, design has allowed me to blend together these contrasting styles and provided an opportunity to develop a rich passion for the way in which people, architecture, and nature come together. I have a Bachelor’s in Interior Design from the Fay Jones School of Architecture + Design at the University of Arkansas. While design is a major focus in my life, in my free time I like to channel my creativity into pottery, weaving, cross-stitching, and baking sourdough bread. Oh, and I have a rescue dog who thinks I’m pretty cool.
design theory At its best, design should be: helpful, beautiful, respectful, conscious, protective, and accessible. At the core of design lies the human interaction. Every line, measurement, and selection drawn by a designer affects lives, and I believe that we as designers have a responsibility to maintain and strengthen that connection. Design should protect the user and the environment, and be helpful to all it encounters. It should be beautifully crafted and beautifully conscious. Additionally, design should be accessible. Whatever other challenges a person faces - effective and accessible design should not be on the list. As designers we have a duty to provide helpful, beautiful, respectful, conscious, protective, and accessible design to all, and throughout my career I strive to take this call seriously.
table of contents student work
1
detroit 7 1 grocery 5 re:fresh spa 8
professional work
1 1
performing arts 1 1 executive office 1 4 technical drawings 1 7
the detroit 7 PROJECT BRIEF The Detroit 7 is a concept founded in the idea of gathering people together 7 days a week for multiple different uses under one roof. These activities include a hotel, a bowling lounge, a food hall, and housing. This is all done in a 100,000 sqft warehouse in the heart of the Eastern Market in Detroit. The design of the space embraces the existing character of the building and the area, while bringing in color and modern touches. The spaces are laid out to utilize fluidity and openness between each of the programs. The people of Detroit are strong, vibrant, and value their city. This project seeks to honor the city and it’s people by enhancing a great area with new unique activities and spaces.
Proposed Exterior
1
SPRING 2019 Existing Building
Section Perspective Looking into Lobby
Reception Elevation
2
Floor Plan
Materials + Mood Board
3
View Looking into Bowling Lounge + Arcade Mezzanine
4 Section Diagram of Bowling Lounge
grocery store PROJECT BRIEF This project focuses on finding a successful solution for an out-ofuse grocery store in Fayetteville, AR. By evaluating the food presence in Fayetteville and seeing where any gaps are, the conclusion was made that this program should reflect the most important needs: to provide, to engage, and to shop local. The building incorporates a cafe, a local grocery market, a demonstration kitchen, and a flexible event space that could be used for local artisans or vendors. Spatially, the design uses fruits and vegetables as inspiration, and emphasizes a pomegranate concept throughout the space.
FALL 2018
Materials Palette
5
View of Demonstration Kitchen
Section Looking into Demonstration Kitchen
Floor Plan
6
View Looking into the Buy One Give One Cafe
7 Section Perspective Looking From Inside to Outside Experiences
re:fresh spa PROJECT BRIEF The Re:Fresh Spa is a spa concept within a resort casino in Mississippi. The design and concept is centered around the Tunica tribe in Mississippi. The Tunica were a people who moved often, directly down the Mississippi River. Because of that, the design of the spa utilizes the motif of the River throughout. Specifically focusing on two different aspects of a river: land/ stasis and water/movement. Each space is designed with that in mind, and should feel in every aspect down to the material selections - that you’re either on a movement path or in an area to stay and rest. This project was selected to represent the University of Arkansas as the Angelo Donghia Scholarship Nominee in 2018. 8
SPRING 2018 View of Women’s Pool Area
Initial Sketches
Parti Diagram
Conceptual Diagram
9
Materials Palette
View of Reception
Section Looking into Women’s Pool Area
10
performing arts center PROJECT BRIEF This project is a performing arts center lobby renovation for Kansas State University. The project includes an addition to the existing structure and a renovation of the existing interior lobby space. By adding space onto the building, we are able to utilize existing limestone walls as features throughout the space. The other finishes are kept simple and timeless, with dark terrazzo floors and walnut paneling. As a team member on this project I contributed to the design of the ticketing office, the concessions design, and multiple other aspects of the lobby.
View into Ticketing Office
SPRING 2020
11
ADA transaction area
Food service consultant to specify commercially rated bar prep sink
Ice pan opening (1@ each POS) Summit commercial refrigerator drawers (1@ each POS) S
PO
*Note: Food service prep equipment to be verified and specified by food service consultant Space allows for each POS to include condiment caddy and POS equipment.
S
PO
Summit UC Ice maker
CONCESSION AREA 3D
View of Concessions
Bottle Rail (1 @ each POS)
Trash under POS (1 @ each)
Concessions Axon
is building positive
Concessions is building positive
View Looking into Lobby
View Looking onto Lobby Bench and Signage
12
View Looking into Mezzanine and Offices
13
executive offices PROJECT BRIEF This project is a renovation of the executive suites of a local Kansas City insurance company. The project includes an expansion to their current board room and a rearrangement of their offices. Given the expansion of the board room with the renovation, there will be a new feature ceiling+wall piece in the space. The other finishes are kept simple, with neutral carpeting and walls. Walnut paneling is used to tie the space together as a common theme throughout the executive suites. As a team member on this project I contributed to the design of the board room, the offices, the corridor and multiple other aspects of the design and finishes.
FALL 2019
View of Board Room
14
Floor Plan
15
View Looking Executive Suite Hallway
16 View of Executive Entry
4' - 0" F.V 10' - 2" F.V.
11"
2' - 2"
2 1/4" 3 1/2"
COUNT DISPEN NIC
7' - 0"
2' - 8 1/2" 1' - 3 1/2"
9' - 0"
BR1
7' - 6"
A3
1' - 11 1/8" 1' - 1 7/8"
36" W EQUIP
FULL-H W/ TW
2' - 4" CLR
FLR TRANS. RE: E6/A030
G1 Level 2 Enlarged Break Room 1/4" = 1'-0"
221/3
ELEC UNIT HEATER RE: MECH A3
H
DRAPERY (122200)
3' - 0"
MO1 WD VENEER WD CABINET (064023)
2' - 11 1/2"
A1 A501.1
COUNT (10"W
E7
5"
COUNTERTOP ENCORE COFFEE DISPENSER. (22"W X 25"D X 30"T) - NIC
A13A501.1
A501.2
LINE OF WD VENEER CABINET & SHELF CAB ABOVE (064023)
4" DIA HOLE IN COUNTERTOP
J
GLASS WRITA
PAINT (099123)
A3
20' - 0"
COUNTERTOP BEVI DISPENSER, (10"W X 11"D X 19"T) - NIC
A501.1 G5
14' - 0 1/8"
technical drawings
SINK RE: PLUMB
A5 A501.1
PAINT (099123)
SOLID SURFACE COUNTER W/ WATERFALL END (064023)
A3
23' - 0" F.V.
GLASS BACKSPLASH SURFACE, WRITABLE/MAGNETIC (101100)
K
FLR TRANS. RE: E6/A030
3'
SOLID SURFACE COUNTER (064023)
G5 Interior Elevation - Break Room East
RE: A1 A101
1/4" = 1'-0"
G
RE: A1 A101
G
CABINET LIGHT FIXTURE RE: ELEC.
CAB LIGHT FIXTURE RE: ELEC.
3"
2' - 2 1/4"
3"
F
2" 3"
The selected works are construction drawings done for various projects at BNIM Architects.
2' - 4"
10 1/2"
WOOD PANELING CASEWORK PLYWOOD
2"
E
FINISHED RETURNS AT CAB ENDS. PLYWOOD SHELF UNDER CAB LIGHT FIXTURE RE: ELEC. SHELF REST
UNDER CAB LIGHT FIXTURE RE: ELEC.
COUNTERTOP BEVI DISPENSER, (10"W X 11"D X 19"T) - NIC
GLASS BACKSPLASH SURFACE, WRITEABLE / MAGNETIC (101100)
2' - 9 1/2"
2'-9 1/2".
CUTBACK BTM OF CABINET FOR 12.5 SQ IN OPEN VENT AREA @ BEVI BASE CAB
RUBBER BASE (096513)
4"
RUBBER BASE (096513)
4" 3"
RUBBER BASE (096513)
3"
3"
A1 Kitchenette Section Thru Casework 1" = 1'-0"
C
PARTITION AS SCHEDULED
FULL-HT DOOR ROLL-OUT W/ TWO (2) 50 QT. CONTAINERS AS OCCURS, RE: G10/A501.1
B
PULL 34" TO CENTER LINE DOOR FINISH, WALNUT
4" DIA HOLE IN COUNTERTOP AS INDICATED IN BEVI BASE CAB
4"
C
6' - 9"
1' - 0 3/8"
7' - 0"
GLASS BACKSPLASH SURFACE, WRITEABLE/MAGNETIC (101100)
7' - 0"
5"
1' - 10 1/2"
2' - 1"
WALL CAB BEYOND, FINISHED END
2'-9".
2' - 1"
D
A5 Kitchenette Section Thru Cabinet Sink
RE: G1 A501.1
1" = 1'-0"
A7 Kitchenette Section Thru Closet
RE: G1 A501.1
1" = 1'-0"
A
RE: G1 A501.1
A 1
FALL 2019 - SPRING 2020
2
3
4
5
6
7
8
10
9
17
3
4
5
6
7
8
9
10
11
12
13
14
15
VIDEO MONITOR CENTERED IN WOOD GRILL WALL SYSTEM. COORD. MONITOR SIZE WITH OPENING SIZE FOR TIGHT, TAILERED FIT. RE: ELEC, (MONITOR & MOUNT NIC)
A7 A501.2
13' - 11 3/4"
9' - 0"
PAINT (099123)
2.8
2.9
K
J13 Door 221/1 Plan Detail
RE: A1 A101
1/2" = 1'-0"
RE: E1 A501.2
A.5 A1 A501.2
E7
A.7
3
2.9
END CAP BOARDS (095423)
RECESSED LIGHTING RE:ELEC
4' - 6" F.V.
32' - 0" F.V.
HIGH CEILING 25' - 0"
P4 P4
B
D3
221/2
D3
21' - 0"
1' - 6"
PAINT (099123)
10"
RUBBER BASE (096513)
3 1/8"
A6 A030
F
METAL STUDS (092216) 3 5/8"
Sim
PNLS @ 6 EQUAL SPACES (F.V.)
LEVEL 2 14' - 8"
G
3/4" PLYWOOD BACKING PNL (061053)
3" O.C. SPACING
P4 P4
J13A501.2
Rev. #
SOUND ATTENUATION BLANKET (092900)
P4 ACOUSTIC FELT FACING MAT'L (095423)
2" CLR
P3
P3
221/1
9' - 0"
10' - 4"
D3 221/2
Construction
Issued: Novem
PAINT RECESSED FACE BLACK (099123)
AU1 ACOUSTIC WALL PANELS (098433)
P4
P3
H
2 7/8" METAL STUDS (092216)
ACOUST WALL PNLS (098436)
9' - 0"
221/1
6' - 0"
GYPSUM BOARD (092900)
7"
1/2"
1"
D3 SIM
7' - 6"
6' - 0"
Project No: 19
T.O. ROOF STL. (LOW POINT) 28' - 0"
3" SETBACK TO WALL EA END
17' - 0"
5' - 8 7/8"
7' - 5 5/8"
4' - 6" F.V.
GEHA E Renova
310 NE Mulb 64086
PAINT (099123)
8' - 0"
RETURN AIR GRILLES ABOVE IN BULK-HEAD RE: MECH.
LINES OF SOFFIT AND COVE ABOVE
G
D3 SIM
6"
J
A501.2 J7
A3
H
9201 E 63rd Street p. 816.358.1790 Certificate of Autho L
221/1
J7 Interior Elevaton - Board Room - East Wall
8' - 0" LINE OF WD CLG SYSTEM ABOVE.
Gibbens Drake
10 LINE OF GWB WALL ABOVE
LEVEL 2 14' - 8"
1/4" = 1'-0"
BNIM Architec
2460 East Pershing p.816.783.1500 f MO State Certificat
RUBBER BASE (096513)
E13A501.2
LINE OF BULK HEADS ABOVE. J
6"
6 3/8"
P4
A020
LINEAR WOOD WALL SYSTEM (095423) BEYOND
LINE OF TRANSITION TO EXIST 6" RAISED ACCESS FLOOR
A7 A501.2
K
HIGH CEILING 25' - 0"
9' - 0"
ALIGN WITH MULLIONS
8' - 0"
A 10' - 4"
ALIGN WITH MULLION
1' - 2"
9' - 5"
4"
0"
11"
L
221/3
14' - 2" F.V.
ALIGN
1' - 2"
Sim
2 1/2" 6" 2 1/2"
3 1/2" 2 1/2"
1' - 2"
C10 A501.1
M
GP-10
SURF MTD. LIGHTING RE: ELEC.
8' - 0" 15' - 10" F.V.
RECESSED LIGHTING RE: ELEC.
EQ EQ5 1/8"
Sim
30' - 0"
6"
1" OFFSET IN WALL SURFACE FOR ACOUST. PNLS.
13' - 7 3/8"
C10A501.1
LINE OF WD CEILING SYSTEM ABOVE
B
3 1/8"
4
A.5 A.7
3 1/8"
3
A
LINE OF BULK HEAD @ DRAPERY ABOVE.
6' - 0"
A1 A501.2
M
2.9
ELEC. HTG. UNIT AT FLOOR. RE: MECH.
5' - 8 7/8"
2
1
LINEAR WOOD WALL SYSTEM INTERMITTENT BACKING BOARDS (095423)
1"
4"
5 7/8"
F
5 5/16"
AREA OF EXISTING 6-INCH RAISED ACCESS FLOOR.
E1 LEVEL 2 Enlarged Board Room
E7 Interior Elevaton - Board Room - South Wall
N
RE: A1 A101
1/4" = 1'-0"
E13 Detail - Board Room Wall Grille
RE: A1 A101
1/4" = 1'-0"
Key Plan
RE: E1 A501.2
1 1/2" = 1'-0"
E
E
FF OF CORRIDOR, BOARD ENTRY 204
B
6' - 0"
A7 A501.2
A.7 A.5 8' - 0"
A
10 1/2"
A1 A501.2
3
DRAPERY (122200) BEYOND
8' - 0"
SURF MTD. LIGHTING RE: ELEC.
RECESSED LIGHT'G RE: ELEC.
Sim
T.O. ROOF STL. (LOW POINT) 28' - 0"
T.O. ROOF STL. (LOW POINT) 28' - 0" HIGH CEILING 25' - 0" SUSPENDED GRID SYSTEM (095423)
C
221/3
LIGHT FIXTURE RE: ELEC
ACOUST FELT FACING MAT'L (095423)
EXISTING WINDOW BEYOND
RETURN AIR DIFFUSER RE: MECH
C
7"
10' - 4"
221/1
EXISTING WINDOW BEYOND
10' - 0"
9' - 0"
GP-10
8' - 8" WALL PNLS.
D
Seal
HIGH CEILING 25' - 0"
6"
7"
C10A501.1
9"
A13A501.2
2"
EQ
5"
D
4 5/8"
3 1/8"
1" OFFSET IN WALL SURFACE FOR ACOUST PNLS.
2.9
DOUGL
PAINT (099123) RUBBER BASE (096513) LIGHT FIXTURE RE: ELEC
LEVEL 2 14' - 8"
4"
B
3" O.C. SPACING TYP.
LEVEL 2 14' - 8"
2" CLR
1" LINEAR WOOD CEILING GRILLE SYSTEM W/ INTERMITTENT BACKING BOARDS (095423)
B
License Name: Ber Profession Name: A Licensee Number:
INTERIOR DE
A1
A7
Section - Board Room - East Wall 1/4" = 1'-0"
RE: A7 A501.2
A13
Section - Board Room - North Wall 1/4" = 1'-0"
RE: A1 A501.2
Detail - Board Room Ceiling Grille 1 1/2" = 1'-0"
RE: A1 A501.2 A
A 1
2
3
4
5
6
7
8
9
10
11
12
13
14
A5
12/2/2019 11:33:4
15
18
1
2
3
2.1
4
5
6
7
8
1' - 1 3/4" FV
2 A
1' - 8 7/8" 3' - 0"
3' - 0"
1' - 11 1/4" 1' - 3 3/8"
3' - 0"
9
11
12
A.5 A.7
3' - 0" 1 3/4"
B
10' - 11" EQ
13
14
15
G1 A500.1
3' - 0"
3' - 0"
EQ
B.5
C
32' - 3 3/8"
1 3/4"
1 3/4"
P3
D3
10
J11 A500.1
EQ
9 @ 3' - 0" = 27' - 0"
5' - 4 1/2" 3' - 0"
EQ
EQ
1 3/4"
EQ M
3 3/8"
M
PS2
P3
Sim
E6 A500.1
234/1
F.V.
SHELVES SHOWN BEHIND DOOR
A501
Gibbens Drake S
9201 E 63rd Street p. 816.358.1790 Certificate of Author
214/1
LEVEL 2 14' - 8"
FLUSH WOOD PANELING (064023) SOLID WOOD BASE (064023)
J4
3' - 8"
2' - 11 1/8"
Interior Elevation -Corridor Level 2 East 1/4" = 1'-0"
RE: A1 A101 K
P3
E7 A501
J
4 1/2"
E4 A501
2' - 10 1/2"
3' - 2 1/4"
2' - 10 1/2" WOOD PANELING CASEWORK PLYWOOD
3' - 7 1/2"
PLYWOOD SHELF
D3
4 1/2"
G
SHELF REST
PULL 34" TO CENTER LINE
4' - 10"
220/1
J11 A500.1
PULL 34" TO CENTER LINE
PARTITION AS SCHEDULED
F
J6A500.1
1/2" = 1'-0"
1/2" = 1'-0"
RE: A1 A101
SOLID WD BASE RE: G1/A500.1 (SIM)
E7 Section - CEO Cabinet Shelving 1/2" = 1'-0"
WS1, WRITABLE SURFACE ASSEMBLY (101100)
RB1
G
PARTITION AS SCHEDULED
LEVEL 2 14' - 8"
RE: E1 A501
VIDEO MONITOR RE: ELEC, (MONITOR & MOUNT NIC)
PULL 34" TO CENTER LINE
BLOCKING
SOLID WD BASE RE: G1/A500.1 (SIM)
E4 Section - CEO Cabinet Coat Stoarge
E1 Detail Plan - CEO Office Casework
Rev. #
PULL 34" TO CENTER LINE
BLOCKING
LEVEL 2 14' - 8"
P3
Construction D
Issued: Novem
2.1
DOOR FINISH, WALNUT
PARTITION AS SCHEDULED
BLOCKING SOLID WD BASE RE: G1/A500.1 (SIM.)
2.2
DOOR FINISH, WALNUT
DOOR FINISH, WALNUT
9' - 0"
DOOR FINISH, WALNUT
P3
C11A500.1
WRITABLE SURFACE AS SPECIFIED
SHELF REST
CLOSET ROD
9' - 0"
1' - 2 1/2"
3 3/4"
1' - 5 1/8"
PLYWOOD SHELF
PLYWOOD SHELF
SHELF REST
6 5/8" 5"
Project No: 19 H
4' - 0"
2' - 11"
P3
GEHA E Renova
310 NE Mulbe 64086
WOOD PANELING CASEWORK PLYWOOD
3' - 4"
D3 H
WOOD PANELING CASEWORK PLYWOOD
9' - 0"
J
3' - 11 1/2"
5' - 2 1/4"
4 1/2"
E4 A501
220/1
L
A6
E10 A501 K
220/2
1' - 2 1/2"
1'-6" MIN.
L
9' - 0"
J6A500.1
220/2
BNIM Architects
2460 East Pershing p.816.783.1500 f.8 MO State Certificate
D3
LEVEL 2 14' - 8"
E10 Section - Admin Cabinet
RE: E1 A501
E13 Interior Elevation - CEO Office- South
RE: E1 A501
1/2" = 1'-0"
F
LEVEL 2 14' - 8"
1/4" = 1'-0"
Key Plan
RE: A1 A101
E
E
A
A.5
A.7
A10A501.1 Sim
D
D
Seal
2' - 0"
2' - 0"
2' - 0"
2' - 0"
2' - 0"
HIGH CEILING 25' - 0"
2' - 0"
5 3/8"
3' - 6 5/8"
3' - 11 1/2"
4 1/2"
3' - 8"
21' - 1"
J11 A500.1 2' - 0" 1' - 6 1/8"
C
A13A501.1 Sim
20' - 0"
J11 A500.1
C
DOUGLA 220/1
10' - 4"
220/2
9' - 0"
220/1
10' - 4"
10' - 4"
9' - 0"
WRITEABLE SURFACE SURFACE ASSEMBLY - WS1, (101100)
220/2
VIDEO MONITOR RE: ELEC (MONITOR & MOUNT NIC)
B
B
LEVEL 2 14' - 8"
A1
A6
Interior Elevation - CEO Office - West 1/4" = 1'-0"
RE: A1 A101
A11
Interior Elevation - CEO Office - West - Cabinet Doors Open 1/4" = 1'-0"
RE: A1 A101
INTERIOR DET
Interior Elevation - CEO Office - East RE: A1 A101
1/4" = 1'-0"
A
A 1
2
3
4
5
6
7
8
9
10
11
12
13
14
License Name: Berk Profession Name: Ar Licensee Number: 0
A50
12/2/2019 11:32:56
15
19
6
7
8
9
10
11
12
13
EQ
E9A021
WALL-MTD VIDEO MONITORS, RE: ELEC (MONITOR & MOUNT N.I.C.)
2' - 0"
5' - 1" TYP
E5A021
K
DASHED LINES OF GWB ABOVE
13' - 1 3/4"
A3
EQ
SIM A6 RE: SEC.
5'-5 7/8".
3' - 0"
4" 1' - 8"
2' - 6" 4' - 0"
1/4" = 1'-0"
7' - 0"
4' - 0"
9' - 0"
GP4
K10 Hotel North Wall
RE: G2 A500
1/4" = 1'-0"
RE: G2 A500
PAINT (099123)
K12 Hotel West Wall 1/4" = 1'-0"
K14 Hotel South Wall
RE: G2 A500
1/4" = 1'-0"
A1A021
11' - 6"
1.5
1.5
2' - 6"
4" 1' - 8"
K7
A500
CL FIXTURE
PAINT (099123)
WS1, WRITABLE SURFACE ASSEMBLY (101100)
LINEAR DIFFUSER, RE: MECH
5' - 9"
GYP CLG BAND (099123)
4' - 0"
CL FIXTURE
J
A3
ALIGN
PNL JT
RB1 (096513)
LEVEL 2 14' - 8"
A3 SIM RE: SEC.
D3
EQ PNL JT
PAINT (099123)
ALIGN HEADER
H D3
EQ
ALIGN B.O. SYSTEM W/ ADJ. EXISTING WINDOW
5' - 0"
EQ
1/4" = 1'-0"
310 NE Mulb 64086
Project No: 1
RB1 (096513)
LEVEL 2 14' - 8"
4' - 9"
G7 Elevation - Exec. Office Typ - North Wall
N
RE: A1 A101
PNL JT
PAINT (099123)
5'-0" +/- F.V. EQUAL
1' - 10 5/8"
G2 Enlarged Floor Plan - Exec. Corridor
GEHA E Renova
EQ
PNL JT
4' - 0"
P1 A3
H
2' - 6"
K14
VIDEO MONITOR RE: ELEC., (MONITOR & MOUNT (N.I.C.)
7' - 0"
HOTEL 1 229
G12
1/4" = 1'-0"
2' - 0"
6' - 0"
GP6
RELOCATED STORM PIPE RE: PLUMB'G.
G
SUSP LIGHT FIXTURE RE: ELEC
1.3
ACOUST. PNL CLG (095113)
4' - 0"
K12
PAINT (099123) WS-1,WRITABLE SURFACE ASSEMBLY (101100)
7' - 0"
A10
1.3 ACOUST. PNL CLG
K10
A500
RE: G2 A500
2' - 6"
7' - 9"
EXEC. 6 226
L
RB1 (096513)
4" 1' - 8"
A3
Gibbens Drake
9201 E 63rd Stree p. 816.358.1790 Certificate of Auth
GP2
LEVEL 2 14' - 8"
BNIM Architec
2460 East Pershin p.816.783.1500 MO State Certifica
WS1, WRITABLE SURFACE ASSEMBLY (101100)
K
2' - 6"
C L
EQ EQ
J5A021 E13A021
G7 A13
1' - 5 1/2"
COPY 228
WALL-MTD. VIDEO MONITOR RE: ELEC. (MONITOR & MOUNT N.I.C.)
J
4' - 10"
GP4
7' - 9"
5' - 6 3/4"
EQ TO CL FIX.
1' - 6"
RB1 (096513)
K7 Exec. Hotel Typ - East Wall
P1
EQ TO CL FIX.
5 1/8"
2' - 6"
LEVEL 2 14' - 8"
EQ
GP2
C11A500.1
7'-11 5/8".
A1 A500.1
3' - 0"
2' - 6"
SOLID WOOD BASE (064023)
FIRE PROTECTION CABINET (104413)
L
WS1, WRITABLE SURFACE ASSEMBLY (101100)
3' - 3"
2' - 6"
C11A500.1
ALIGN
PAINT (099123)
SUSP LIGHT FIX. RE: ELEC
EQ
4' - 5 1/8"
M
7' - 0"
G1 A500.1
J4
9' - 0"
A501
F11/A500.1
A5A021
9' - 0"
SUSP LIGHT FIX. RE: ELEC
P1
A3
1' - 6"
15
4"
FURNITURE (NIC) M
4' - 10"
2' - 6"
1' - 6"
EQ
1' - 8"
EQ
14
4" 1' - 8"
5
7' - 0"
4
2' - 6"
3
9' - 0" 4' - 0"
2
1
5' - 0"
Rev. #
G12 Elevation - Exec. Office Typ - South Wall
RE: G2 A500
1/4" = 1'-0"
Construction
Issued: Nove
5'-0" +/- F.V. EQUAL
G
RE: G2 A500
F
F
Key Plan
A1A021 E A3
J9
GP-4
1' - 6"
A9 MEET 2 207
HOTEL 4 232
2
EXISTG. WALL & MECH DIFFUSER
2.1
2.2
E
A500.2 J5 NEW GWD HORIZ. CEILING, PTD.
E9
D
SR-1 MANUAL, ROLLER WINDOW SHADE (122413)
SUSP LIGHT FIXTURE RE: ELEC
T.O. ROOF STL. (LOW POINT) 28' - 0"
P1
ACOUST. PNL CLG
EQ
FLUSH WOOD PANELING (064023)
SUSP LIGHT FIXTURE RE: ELEC
EQ
D
EQ
GLASS PARTITION SYSTEM (102219.63), RE: A/020
PS-1
A1 A030
GLASS PARTITION SYSTEM (102219.63), RE: A/020 OPEN TO BEYOND
Sim
9' - 0"
EXEC ENTRY 205
C
E9 A021
205/1
E1 A030
C
PAINT (099123)
C11 A500.1
RB2 (096513)
DOUGL
LEVEL 2 14' - 8" 1 5/8"
Enlarged Floor Plan - Exec Entry 1/4" = 1'-0"
EXIST. WINDOW
Sim
B
A2
W1
Seal
4" 1' - 8"
P1
7' - 0" 9' - 0"
C11A500.1
4" 1' - 8"
GP-1
A5 A500
EQ
3' - 10 7/8"
7' - 0"
3' - 11 1/8"
E9A021
9' - 0"
E13A021
A5
N
RE: A1 A101
3' - 11 1/8"
3' - 10 7/8"
1' - 4 1/2" 4"
B
SOLID WOOD BASE (064023)
Elev - Exec. Entry North Wall 1/4" = 1'-0"
EXISTING BLK RUBBER BASE (6")
A10
RE: A1 A101
A13
Elev - Exec. Office Typ - East Wall 1/4" = 1'-0"
RE: G2 A500
Elev - Exec. Office Typ - West Wall 1/4" = 1'-0"
INTERIOR D
RE: G2 A500
A
A 1
2
3
4
5
6
7
8
9
10
11
12
13
14
License Name: Be Profession Name: Licensee Number
A5
12/2/2019 11:31
15
20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
0 0.1
19
21
22
23
24
2
17' - 0"
25
26
3
20' - 8"
1' - 0"
Z
20
0.3 1
27
28
29
4
40' - 0"
2' - 0"
A
A
Y
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
20' - 8"
12
X
Z
Kansas State University
BASE WD2 RE: A33/A602
BNIM
B
Architect
2460 Pershing Road, Suite 100 Kansas City, MO 64108 p/ 816.783.1500
3
Walter P. Moore
X
Structural & Civil
PAPER TOWEL DISPENSER AS SPECIFIED
TC1-CEILING HUNG TOILET COMPARTMENT (102113) SOAP DISPENSER AS SPECIFIED
Rev
COUNTER BRACKET
T
1
TL2 COVE BASE
QA1
1
TL2 COVE BASE
Code
1330 Burlington St. North Kansas City, MO, 64116 p/ 816.931.3377
V
QA1
T e cto p yrig iC n 7 0 t2 h
20' - 0"
FP&C Consultants
TL2
C
U
Multipurpose Room 353 WF1 WD2 ST0, PA1 6
MEP
8345 Lenexa Drive, Suite 300 Lenexa, Kansas 66214 p/ 913.742.5000
W
U
316K.1
1100 Walnut, Suite 1825 Kansas City, MO 64106 p/ 816.701.2100
Henderson Engineers Inc.
Description
Date
Addendum 1
3/13/20
316K.2
J4f Elev EL302 TL1 --
1
S
R30
Men's Restroom - North Elevation 1/4" = 1'-0"
RE: A12 A501
R
Men's Restroom - South Elevation 1/4" = 1'-0"
S
RE: A12 A501
Prep Area 352 TL1 TL1 TL4 --
R
D
Q
--
BASE WD2 RE: A33/A602
20' - 0"
R14
T
North Stairwell 216K TR0 TR0 PA1 --
BASE WD2 RE: A33/A602 356.1
354.1
Women's Restroom 354 TL1 TL1 TL2, TL3 --
Q
P
1
H
G
G TL2 COVE BASE
F
A14 12
13
14
15
E
A21
Family Restroom - West Elevation 1/4" = 1'-0"
16
RE: A1 A511
17
18
19
20
21
22 D
23
Department of Administration Office of Facilities and Property Management Design, Construction & Compliance 800 SW Jackson, Suite 700 14' - 10Kansas 5/8" 66612-1216 Topeka, Phone 785-296-8899
F
K
H30
Family Restroom - North Elevation 1/4" = 1'-0"
H
G
G
F
1
G
Men's Restroom 358 TL1 TL1 TL2, TL3 --
357.1
Copy 351A CA1 RB1 PA1 --
J
RE: A1 A511
Storage 359 CS1 RB1 PA1 --
Janitor Closet 357 CS1 RB2 HC1 --
1
359.2
358.1
South Stairwell 216L TR0 TR0 PA1 --
Tech Suite 351F CA1 RB1 PA1, ST0 --
Open Office 351 CA1 RB1 PA1 --
TL3
Tech Director 351E CA1 RB1 PA1, ST0 --
E
TL2 COVE BASE
Assoc. Director 351D CA1 RB1 PA1, ST0 --
D
INTERIOR DETAILS - MEN'S RESTROOM & FAMILY RESTROOM
C
Conference Room 351B CA1 RB1 PA1 --
H A-013940
FINISH PLAN LEGEND
A30
Family Restroom - South Elevation 1/4" = 1'-0"
L
DRAWN BY:
J
G
PAINTED CEILINGS [PA1] UNLESS NOTED OTHERWISE. EQ TL2 COVE 1 BASE SEE A040 PARTITION TYPES FOR SUBSTRATE MATERIAL. SEE REFLECTED CEILING PLANS (RCP) SHEET A150 FOR CEILING HEIGHTS, MATERIALS, AND FINISHES UNLESS OTHERWISE NOTED. D. SEE A500 SERIES SHEETS INTERIOR ELEVATIONS FOR ADDITIONAL FINISH LOCATIONS, EXTENTS, AND INFORMATION E. EXPOSED OVERHEAD SHEET METAL DUCTWORK, STRUCTURAL & MISCELLANEOUS STEEL, CONDUITS AND OTHER MISCELLANEOUS METALS TO BE [HC1]. F. NOT USED RE: G.A1 A511 HOLLOW METAL DOORS AND FRAMES (081113) COLOR TO MATCH ADJACENT WALL UNLESS NOTED OTHERWISE. H. PROVIDE TRANSITION PROFILE BETWEEN FLOOR FINISHES PER (096513) AND (096813). PROVIDE METAL EDGE STRIP (093000) (096400) AT EXPOSED EDGES OF 3 SLAB RECESS AND AT DOOR OPENING TRANSITIONS. I. SPRINKLER ESCUTCHEONS AT ACOUSTICAL PANEL (095113) AND GYPSUM BOARD (092900) CEILINGS TO BE STANDARD WHITE. 1 J. REPAIR, PATCH, AND FINISH EXISTING CONSTRUCTION SCHEDULED TO REMAIN IMPACTED BY DEMOLITION WORK. PROVIDE NEW FINISH AS SCHEDULED TO ENTIRE EXISTING SURFACE IN PLANE WITH NEW CONSTRUCTION TO PROVIDE CONSISTENT FINISH (017300). K. FINISHES OF ELECTRICAL, AV, IT, LIFE SAFETY AND OTHER DEVICE COVER PLATES AND ASSOCIATED DEVICES AS FOLLOWS: B. DIRECTIONAL SATIN NO. 4 STAINLESS STEEL COVERPLATES (MANUFACTURER'S STANDARD) AND GREY DEVICES AT EXPOSED CONCRETE (033000). TL2 COVE C. WHITE COVERPLATES ANDBASE DEVICES WHERE INSTALLED ON WHITE-PAINTED GYPSUM BOARD (092900) WALLS AND CEILINGS, AND CERAMIC TILE FINISHES (093000). E. MATCH FINISHES OF EXISTING COVERPLATES AND DEVICES ON NEW COVERPLATES AND DEVICES. L. HVAC DIFFUSER FINISHES: WHITE UNLESS OTHERWISE INDICATED. M. FURR-IN PIPING, CONDUITS, AND DUCTS IN ALL ROOMS EXCEPT ELECTRICAL CLOSETS, TELEPHONE CLOSETS, MECHANICAL ROOMS, AND ROOMS DESIGNATED "OPEN TO A1 A511 RE: STRUCTURE". N. RE: DIVISION 14 CONVEYING EQUIPMENT SECTIONS FOR ELEVATOR CAB FINISH INFORMATION. O. LEVEL FLOOR AND PATCH WHERE CRACKED PRIOR TO FLOORING INSTALLATION. FEATHER CONCRETE 24 25 26 27 SLAB TO 28 ACCOMMODATE SMOOTH TRANSITION BETWEEN FLOOR FINISHES. PROVIDE OF MINIMUM OF 10'-0" FLOAT LENGTH FROM EDGE OF FLOORING MATERIAL TRANSITION. P. ALL FLOOR MATERIAL CHANGES SHALL OCCUR AT CENTER OF DOOR LEAF. EQ
Men's Restroom - West Elevation 1/4" = 1'-0"
M
DATE:
H21
RE: A1 A511
TL2 COVE BASE
20' - 0"
1/4" = 1'-0"
MIRROR
QA1
359.1
TL3
CA1
Family Restroom - East Elevation 1/4" = 1'-0"
A511
B
RE: A1 A511
EM1 ETR
30
A 31
32
316L.2
Construction Documents
CS1
29
Executive Director 351C CA1 RB1 PA1, ST0 --
316L.1
33
34
35
20' - 8"
H14
K
A. B. C.
Mezzanine CR307 TR1 WD2 ST0, PA1 6, 7, 8
E
1501 GOLDSTEIN CIRCLE, MANHATTAN, KS, 66502 BUILDING NUMBER: 36700-00133 20' - 1 3/8"
2' - 3"
L
Men's Restroom - East Elevation
MIRROR
7"
M
EQ
Finish General Notes
TL2
KANSAS STATE UNIVERSITY
1
TL2 COVE BASE
EQ 5 1/2" 3' - 4"
PAPER TOWEL DISPENSER AS SPECIFIED
N
2' - 4"
MCCAIN AUDITORIUM LOBBY REMODEL AND ADDITION
SOAP DISPENSER AS SPECIFIED
3' - 2 3/8"
TL2
1' - 9" 7" 1' - 9" 7" 1' - 9" 7" 1' - 9"
3' - 4"
N
TC1-CEILING HUNG TOILET COMPARTMENT (102113)
03/18/2020
P
3' - 9"
TL2
Storage 356 CS1 RB1 PA1 --
15' - 0"
3
LIMIT OF DISTURBANCE
2
BASE WD2 RE: A33/A602
V
TL2
MANUALLY OPERATED DRAPERY (122200); CONTINUOUS TRACK; 3 PANELS (CD1)
ST0
Y
2
Owner
Office of Campus Planning & Facilities Management 202 Dykstra Hall Manhattan, KS 66506 p/ 785.532.6377
W
36
Copyright © 2019 BNIM Architects
TL1 TL2 TR0 TR1
C
WF1
J
B N
A1 Finish Floor Plan - Level 3 -Mezzanine 1/8" = 1'-0"
A 1
2
3
0
1'
2'
4'
8'
21
RE: A1 A200
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
thank you references available upon request
snj124@gmail.com | 214.533.3997