Spanwright UK - Tolent Construction - BskyB Studios

Page 1

SpanWri ght SpanWright Case Study

TOLENT Construction Ltd BSkyB Biomass CCHP Plant - FiT Scheme UK

CLIENT:

Tolent Construction Ltd, Southern Region

LOCATION:

Osterley, West London

COMPLETION DATE: Q4 2011 SECTOR:

Commercial/Energy

ABOUT THE PROJECT SpanWright UK were appointed by Tolent to work on the construction of the new Sky Studios Complex at Osterley West London. The plant incorporates the UK and Ireland’s first biomass Combined Cooling Heating and Power system. Costing £250 million the complex completed in Q4 2011. SpanWright UK supplied precast concrete stairs and 250mm prestressed planks at first and second floor levels to the 16,000m2 energy centre on this (CCHP) project. The plant is part of the government supported FiT scheme (feed-in tariff ), commercial companies working to develop renewable on-site power –surplus to be fed into the national grid, and is expected to reduce the building’s carbon footprint by at least 20%. The project is expected to achieve an ‘excellent’ rating under the Building Research Establishment Environmental Assessment Model (BREEAM) a standard demonstrating progress towards corporate and organizational environmental objectives.

PROJECT CHALLENGES Spanwright UK again had to demonstrate the flexibility in design of planks, accommodating sufficient loadings and design requirements of the Clearpower designed CCHP system. SpanWright UK 250mm prestressed planks had additional reinforcement steel strand incorporated to withstand various equipment loadings and sizes including a thermal furnace and a turbo generator. Open cores and solid ends ensured continuity steel to avoid crushing and also reinforcing complete flooring structures. Some planks had to be designed to fit around heavy plant which spanned flooring levels. Lifting points to withstand weights of 3 Tonne were incorporated to the underside of some planks in order that a pully system may be used to lift equipment during servicing. SpanWright UK precast concrete stairs were also installed using 5Tn Halfen Deha lifters, providing a safe means of accessing multiple floors during construction.


PRODUCTS & SERVICES

PRECAST CONCRETE FLOORING

150mm

PRECAST CONCRETE FLOORING

210mm

PRESTRESSED CONCRETE FLOORING

150mm

PRESTRESSED CONCRETE FLOORING

150mm High Density

PRESTRESSED CONCRETE FLOORING

200mm

PRESTRESSED CONCRETE FLOORING

250mm

PLATE FLOORING CONCRETE STAIRS DESIGN

INSTALLATION BESPOKE PRODUCT DESIGN

PRODUCT DETAIL PRESTRESSED finishes to BS 8110 and is available in a range of depths and sizes and manufactured to comply with the recommendations of the PRECAST FLOORING FEDERATION. STAIRS manufactured and tailored to suit each project in compliance with RELEVANT BUILDING REGULATIONS.

TESTIMONIAL Tolent are recipients of the RoSPA Presidents Award 2011 ( Royal Society for the Prevention of Accidents) President’s award recipients have proven their record as previous recipients of 10-14 Gold Awards. Working with Tolent Construction Ltd on this project gave SpanWright UK the challenge and opportunity to further develop our expertise, increasing our competitiveness in a constantly developing industry.

SpanWright UK’s attention to detail, flexibility in design and safe delivery of service and product, served to enable Tolent Construction Ltd adhere to their core commitment of ‘Bringing contracts to conclusion, on time and on budget’ Richard Ball Snr Quantity Surveyor - Tolent Construction Ltd - Southern Region

SpanWri ght Windmill Hill Business Park, Whitehill Way, Swindon SN5 6QR Tel: 01793 441474 Fax: 01793 441401 Mob: 07543 180455 Email: sales@spanwright.co.uk

www.spanwright.co.uk


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.