Hs brochure 05 09 00

Page 1

Capital Campaign High School Renovations Ongoing High School Improvements

For additonal information, contact Charlie Arbogast, Director of Advancement, carbogast@stmarys.academy

stmarys.academy


Built in 1962, the St. Mary’s Academy High School building is structurally sound but in need of renovations and cosmetic updates. The first phase of construction has been completed and the second phase is underway.

PHASE

I

PHASE

II

FUTURE ELEMENTS

• Roof repairs • New lockers

COST:

$800,000

COMPLETED:

2016

COMPLETION • A new lunchroom/cafe and COST: DATE: outdoor patio. This will be $2.6 August located in the southeast corner Million of the High School. 2017 • Replacement of windows in the current choral wing area • Installation of fire sprinkler system in the renovated areas. • Renovation of the east corridor and classrooms including new ceilings, light fixtures, paint, and carpet and Inspiring Women murals • The SMAcafe, new college counseling offices and multi-use room will be air conditioned. • A new college counseling suite will be built in the current choral wing space. • Challenge Foundation offices will be created on the site of the

COMPLETION • New doors (safety upgrade) COST: DATE: • Elevator TBD Construcation • Renovated library relocated to may begin at the former commons area completion of • Outdoor teaching spaces the current • New Innovation Lab $10 million • New Robotics Lab Capital Campaign • Enhancements to all interior courtyards • Upgrade to remaining hallways and classrooms • Main entrance lobby/vestibule • Administration offices adjacent to the main entrance • Construction of Visual Arts Suite • Landcaping enhancements • Outdoor patio/lounge area near main entrance • Replacement of remaining windows


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.