11th Street Info Packet

Page 1


construction in process, stunning views, in coveted triangle park.

Unique Opportunity with Construction in Progress

A unique opportunity awaits a savvy Buyer looking for new construction in the heart of Old Town Steamboat. Have you been wishing you could build a home downtown but can’t find a lot or come to realize that most builders are several years out? That can be discouraging and if that is your scenario, then this just might be your dream come true with plans completed, permits issued, and builder on board, ready to finish the project. The fun part of building remains with the ability to select finish details that reflect your own personal style. Currently under construction and framed-in to accommodate 5 bedrooms, 5.5 baths and 2-car garage, this home offers amazing potential. The location is coveted, right across from the triangle park and offering 0.39 of an acre with ski area views.

5 BEDROOMS

5 BATHS, 1 HALF BATH

4,873 SQ FT

0.39 ACRE LOT

CUSTOMIZABLE

new construction downtown

FLOORPLANS

MAIN

SCALE: 1/8" = 1'-0"

CUSTOMIZABLE

LOCATION

NORTHWEST COLORADO

This New Construction Single Family Home is located in the northwestern part of Colorado in beautiful Steamboat Springs—a charming community with approximately 13,000 residents. Steamboat is unique, famous for its world-class skiing, but still bursting with ranching tradition. The town still maintains its western heritage, small-town character and strong sense of community.

The town boasts good schools and wonderful restaurants as well as the regional health care center. People of all ages are attracted to Steamboat not just because of the vibrant, active community but also because of the thriving businesses that are based here. You won’t find any malls but you can shop at an eclectic array of quality stores, many of which are housed in 100+ year-old buildings along the main street.

STEAMBOAT SPRINGS, CO

Steamboat Springs, also known as Ski Town USA®, is part of the Yampa Valley and is a 3-hour drive from Denver. From skiing and fly fishing, to camping, hiking, rodeos and golf, Steamboat Springs is a destination for year round activities. Steamboat is best known for its epic skiing, with an average of over 330" of Champagne Powder® each winter. Besides skiing, Steamboat is also known for its other vibrant seasons, its gourmet restaurants, fashionable shopping, arts and culture, and its western heritage. With a population of about 13,000, the American West is alive and well in Steamboat Springs with its strong economic base grounded in agriculture and tourism. The town offers 4 golf courses, endless hiking, biking and riding terrain, and the beautiful Yampa River flowing through town. Steamboat is a unique mountain town with a true sense of community, a family friendly place enriched by a diverse economy and rooted in its western heritage.

EMERALD MOUNTAIN
HOWELSEN HILL

CUSTOMIZABLE

3D Rendering
3D Rendering
3D Rendering
3D Rendering
3D Rendering
3D Rendering
3D Rendering
3D Rendering
3D Rendering

CUSTOMIZABLE

SITE PLAN & ELEVATIONS

PROPOSED TELEPHONE PROPOSED CABLE

PROPOSED TELEPHONE

PROPOSED COMBINED ELECTRIC, TELEPHONE, AND & CABLE TRENCH

PROPOSED WATER

PROPOSED SEWER

PROPOSED GAS

EXISTING ELECTRIC

EXISTING SEWER

EXISTING GAS

11THSTREET

(80FOOTRIGHTOFWAY)

11THSTREET (80FOOTRIGHTOFWAY)

sediment shall be removed from control measures when the sediment level reaches ½ the height of the control measure.

5.) The contractor shall promptly remove all sediment, mud, and construction debris that may accumulate in the right of way, private property, or water ways as a result of the construction activities.

6.)

access points on to the disturbed site must be stabilized with a vehicle tracking control pad. Access shall only be via approved locations as shown on approved CSMP.

6.) All ingress and egress access points on to the disturbed site must be stabilized with a vehicle tracking control pad. Access shall only be via approved locations as shown on approved CSMP.

7.) Temporary soil stabilization measures shall be implemented where ground disturbances have temporarily or permanently ceased for 14 days or for areas of land disturbance within one growing season.

7.) Temporary soil stabilization measures shall be implemented where ground disturbances have temporarily or permanently ceased for 14 days or for areas of land disturbance within one growing season.

8.) Concrete waste and washout water from mixing trucks shall be contained on site, removed from the site, and properly disposed. Materials shall not be allowed to enter state waters.

8.) Concrete waste and washout water from mixing trucks shall be contained on site, removed from the site, and properly disposed. Materials shall not be allowed to enter state waters.

9.) Contractor is responsible for complying with all local, state, and federal laws. In addition contractor must obtain required permits.

9.) Contractor is responsible for complying with all local, state, and federal laws. In

ELEVATION

$2,675,000 #S1050474

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.