StonFlow Martin Collegiate High School Case Study

Page 1

MARTIN COLLEGIATE HIGH SCHOOL JOB DETAILS: MARKET: Education PRODUCT: StonFlow Commercial AREA: Physical Fitness Training Room

BEFORE

INSTALLATION

AFTER

AFTER

DATE: 2014 SQUARE FOOTAGE: 2,230 Square Feet LOCATION: Regina, SK

The Solution Stonhard Construction Solutions prepared the floor by Blastrac to remove the old coatings. The floor was primed with an epoxy primer, then aggregate was broadcast to provide the desired mechanical key. Finally, a leveling layer of StonFlow was applied to achieve the The Challenge desired flatness. The floor was available for foot traffic An old motor mechanic classroom was to be converted 2 hours after installation, and the new sports floor was into a physical fitness training area. Many decades of installed 2 days later. use meant numerous issues needed to be addressed, including removal of old coatings, filling of sumps and StonFlow Commercial is a special blend of fast-curing pits and old hydraulic zones, prior to installing a level cements designed to provide a working surface quickly floor suitable for this new environment. and efficiently, ensuring an ideal level surface for finishes such as carpet, vinyl and tile. Martin Collegiate High School, located in the Rosemont/ Mount Royal neighbourhood in the north end of Regina, Saskatchewan, contracted StonCor Group to resurface flooring in order to repurpose a motor mechanic lab into a fitness lab.

www.stonhard.ca | 800.263.3112

#4007-11/14


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.