Tips to Follow When Your Project Has been Red Tagged and Shut Down

By Helen Callier Contributing Writer

H

ave you ever been red tagged on a project? It happens and seeing a red tag posted on your construction project can be disheartening and it becomes worse when your project is shut down because of failure to pull a building permit. Failing to pull a building permit for whatever reason is costly to you as the contractor and to your customer. It is also unprofessional, unethical and in direct violation of jurisdiction codes and ordinances. Our team has received a lot of phone calls through our toll free line from contractors and project owners in dire straits requesting assistance after having their job sites red tagged and shut down by a city inspector for not having a permit. We hear all kinds of comments about being red tagged, such as the following: •  Do we need a permit for this type of work and is there anything you can do to get around meeting these codes? •  Our plans are wrong and the architect did not make changes as requested. •  We are cash-strapped and cannot afford the

building permit fees now. •  The contractor we used did not pull a permit and our roof is messed up and the building is half-finished. What do we need to do to resolve this? The bottom line is that most construction projects within a city’s jurisdiction will require a building permit of some magnitude and while you may be able to submit plans to the city as-is, if they are not designed to code, your plans will be rejected. Also, not having the money to pay permit fees is your problem, as the jurisdiction is focused on safety and not your money woes. If work provided was poor quality and does not meet code then you will need to bring work up to code to obtain necessary approval during inspection, but before that can happen, you need to pull a permit. To assist those that have been red tagged and shut down, we have listed 15 tips to assist contractors in getting a permit after being red tagged and shut down. 1.  Do not toss or ignore red tag 2.  Review violations and comments on red tag 3.  Alert project owner 4.  Contact inspector or code enforcement to acknowledge receipt

5.  Ask questions for clarification, steps to follow and timeline 6.  Contact your architect, if needed, to request assistance with plans 7.  Contact a plan reviewer to cover any areas of the project where there are concerns 8.  Prepare plans with pre-requisite documents 9.  Submit to jurisdictions following their permitting checklist 10.  Track status online and check for any rejections or RFI’s 11.  Respond quickly to jurisdiction comments and resubmit 12.  Pay for permit 13.  Post on job site 14.  Alert project owner of permit obtained and posted. 15.  Resume work

InInConclusion Conclusion The city code enforcement or inspector will continue to drop by your site until your project has been submitted to city permitting. That is the ball game and so the sooner you submit your plans for permitting, the quicker you can be on the path to righting the ship of your project with a permit. If you have any tips to share from your experience of being shut down, I’d love to hear from you. Connect with me on Linkedin or 1.844.PERMIT.4

Experience Our World of Advertising, Marketing, Media and Communication

#BuildSafe


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.