ARC20001_2020_Courbe

Page 1

COURBE

Achol, James, Seda, Nisakya


Swinburne Hawthorn Main Site

Wakefie ld

Street

Lane

William S

treet

John Stre

et

A

Serpells

McLeod L

ane

Burwood

5m

Road

George

Street


Context Of Building - External

Front facade

Front enterance

Back enterance


Site Analysis

1. 1

2.

2 3

3.


Context Of Building - Internal

Main entry

Ground floor hallway

First floor hallway

First floor seating area


Water Flow Concept

Existing walls

Inspired by water flow

Recreating passage flow


Overall Site


Renovation Process

Area of renovation

Proposed structure

B

A


Proposed form


Precedent studies


Materials

Main materials

Terrocotta brick

Glass

Perforated Aluminium

Concrete

Steel

Timber

Construction materials


Digital production process

1. Create point grid

2. Create profile curves

4. Mapping brick geometry onto surface

3. Resulting curved surface

5. Resulting brick wall


Tectonic wall structure diagram


Final tectonic design outcome

Areas of renovation

Final proposed structure


Final tectonic design outcome

Areas of renovation

Proposed first floor


Existing Ground Floor Plan

0

1

5m


Proposed Ground Floor Plan

B

A

0

1

5m


Existing First Floor Plan

0

1

5m


Proposed First Floor Plan

B

A

0

1

5m


Sections

B

A

0

1

5m

Section A


Sections

B

A

0

1

5m

Section B


Elevations

East Elevation

West Elevation


Roof plan


Exploded axonometric


Qualities


Materials - Exploring brick colours


Structural experiment 1 and 2 - Steel frame arrangement

Existing wall

Steel frames

Tectonic wall

First steel frame arrangement - Steel frames

Second steel frame arrangement


Potential construction system

Existing wall connected to steel frames, joined to brick wall.

- Steel frames

Close structural detail of L plates


Dividing walls into prefabricated panels

1.

2.

3.


Final construction system Existing wall

Section B

Chosen system - panel frame


Final chosen construction system: Front view

Square hollow section

L steel plate Construction joints


Final chosen construction method: Back view

Flat L bracket

Brick panel

Back connection to existing wall


Manufacturing process of prefabricated brick panels

1. Timber formwork

2. Timber blocks

3. Brick layer

4. Concrete layer

Overall process


External walls construction

A

1

A

2

B

1.

2.


External wall construction process

1.

2.

Concrete strip footing

4.

3.

Concrete retaining wall layer

5.

Reinforced bars

Initial brick courses

6.

Reinforced bars supporting structure

Finished structure













Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.