LIGHT WHIRLPOOL Robin Le Macy Wang Nguyen Truong Harshil Dharmeshbhai Navadiya
GROUP 2|LIGHT WHIRLPOOL
EXISTING BUILDING CONTEXT GROUP 2|LIGHT WHIRLPOOL
PROJECT LOCATION AD Building Swinburnet
GROUP 2|LIGHT WHIRLPOOL
RENOVATION AREA GROUP 2|LIGHT WHIRLPOOL
LEVEL 1 F
OYER AR E
A + BAC
K ENTRA
NCE & L
EVEL 2 F
OYER AR E
A + COR
RIDOR +
ELEVATO
R AREA
RENOVATION AREA GROUP 2|LIGHT WHIRLPOOL
INTERIOR - LEVEL 1
FRONT ENTRANCE
FOYER AREA
EXISTING BUILDING IMAGES GROUP 2|LIGHT WHIRLPOOL
INTERIOR - LEVEL 2
FOYER AREA
GROUP 2|LIGHT WHIRLPOOL
EXTERIOR
BACK ENTRANCE
BACK ENTRANCE - FROM INSIDE TO OUT VIEW
GROUP 2|LIGHT WHIRLPOOL
CONCEPT
GROUP 2|LIGHT WHIRLPOOL
GROUP 2|LIGHT WHIRLPOOL
GROUP 2|LIGHT WHIRLPOOL
GROUP 2|LIGHT WHIRLPOOL
LIGHT CONCEPT
Smooth mesh structure embracing the flow of light GROUP 2|LIGHT WHIRLPOOL
ROUGH FORM
FRONT VIEW
BACK VIEW
CONCEPT MESH GROUP 2|LIGHT WHIRLPOOL
DOCUMENTATION
GROUP 2|LIGHT WHIRLPOOL
GROUND FLOOR PLAN
FIRST FLOOR PLAN
GROUP 2|LIGHT WHIRLPOOL
TOP VIEW GROUP 2|LIGHT WHIRLPOOL
0
2
4
6
8
10m
WEST ELEVATION Scale 1:150 GROUP 2|LIGHT WHIRLPOOL GROUP 2|LIGHT WHIRLPOOL
BACK ENTRANCE Scale 1:100 GROUP 2|LIGHT WHIRLPOOL
GROUP 2|LIGHT WHIRLPOOL
FOOTING DETAIL Scale 1:20 GROUP 2|LIGHT WHIRLPOOL
Towards Drainage
Towards Bathroom Utilities
Section
RAINWATER HARVESTING GROUP 2|LIGHT WHIRLPOOL
EXISTING ROOF
ROOF WINDOW FRAME
CUSTOMIZED ANGLE SUPPORT BEAM BOX GUTTER 360UB/44.7 352MM D x 171MM BF I BEAM EXISTING WALL MATERIAL BOARD 110MM x 75MM BRICK INSULATION
CLASS ROOM AREA TIMBER FINISHES TIMBER FLOOR TIMBER JOIST INSULATION
CEILING INSULATION CEILING JOIST BOARDS
SHORT SECTION SCALE 1:50 GROUP 2|LIGHT WHIRLPOOL
AXONOMETRIC GROUP 2|LIGHT WHIRLPOOL
INSPIRATION
SHADING CONCEPT GROUP 2|LIGHT WHIRLPOOL
TOP VIEW
A
A
DRAINAGE
IN
PERSPECTIVE
SHADING SYSTEM OUT GROUP 2|LIGHT WHIRLPOOL
SECTION A-A
GLASS
RUBBER SUPPORT
STEEL SUPPORT
SCREW
STEEL NODE
STEEL FRAME
SECTION DETAIL A-A
SCREW STEEL SUPPORT RUBBER SUPPORT GLASS RUBBER SUPPORT GLASS
STEEL FRAME SCREW
SHADING SYSTEM GROUP 2|LIGHT WHIRLPOOL
SECTION A-A
SHADING SYSTEM GROUP 2|LIGHT WHIRLPOOL
A
B SCREWS
SHADING
GLASS 12MM
SHADING
STEEL SUPPORT
RUBBER SUPPORT
RUBBER SUPPORT
STEEL FRAME
GLASS 8MM
STEEL FRAME
CONNECTION AND SEGMENTATION GROUP 2|LIGHT WHIRLPOOL
C
SHADING AREA
GROUP 2|LIGHT WHIRLPOOL
Step-1
Step-2
Step-5
Step-4
Step-1 : Select roof panel in the lying under demolition of roof, and unscrew the screw of that panels to take-off the sheets. Step-2 : Cut the rafters according to required size and unscrew it from the truss. Step-3 : Then, cut and unscrew the ceiling panels from ceiling joist of demolition area.
Step-3
Step-4 : Trim-off the ceiling joist and take it off by unscrewing it from the truss. Step-5 : Cut-Down the joints of trusses at the end, and after seperating each joint with the truss, lift it with the help of a crane without affecting other area.
CONSTRUCTION STRATEGIES ROOF DEMOLITION GROUP 2|LIGHT WHIRLPOOL
Step-1: Mark the area and take-off the railing in that area.
Step-2: Along with the marked curve with help of core cutter drill in the holes.
Slab cut-out
Step-3: Trim-off the uneven surface with the help of cutter.
Back Entrance
Step-4: Smooth the Edge with the help of cutter to have an even surface and replace the existing railing with the glass railing.
GROUP 2|LIGHT WHIRLPOOL
Slab cut-out
CONSTRUCTION STRATEGIES DEMOLITION AREA
Part 3
Part 2
Box Gutter Beam
Gutter Support Insulation
Part 1
CONSTRUCTION STRATEGIES
Cross-Section (Beam & Box gutter)
PLACING BEAM
GROUP 2|LIGHT WHIRLPOOL
Part 1 (364 Meshes)
Step-1 Create the concrete base andplace the first series of panels.
Step-2 Placing second series of panels and connecting it with the help of screws.
Step-3 Placing third series of panels and joining with the second layer of panels and provide some temporary supports.
Step-4 Now, add on the fourth series of panels and join those panels with the adjacent series of panels.
Step-5 Add the top border series of panels and connect with the beam placed on the walls to support structure and now we can take-off the temporary supports.
CONSTRUCTION STRATEGIES
MESH STRUCTURE
GROUP 2|LIGHT WHIRLPOOL
Part 2 (96 Meshes)
Step-1
Step-2
Step-3
Step-4
Step-5
By creating five horizonal series of panels, we can directly place each part with the help of crane and join them together, which further can be joined with the first part of mesh structure and can easily rest on the beams on the both sides.
CONSTRUCTION STRATEGIES
MESH STRUCTURE
GROUP 2|LIGHT WHIRLPOOL
Part 3 (315 Meshes)
Step-1
Step-2
Step-3
Step-4
CONSTRUCTION STRATEGIES
MESH STRUCTURE
GROUP 2|LIGHT WHIRLPOOL
EXTERIOR GROUP 2|LIGHT WHIRLPOOL
GROUP 2|LIGHT WHIRLPOOL
GROUP 2|LIGHT WHIRLPOOL
GROUP 2|LIGHT WHIRLPOOL
GROUP 2|LIGHT WHIRLPOOL
LEVEL 1 - MAIN ENTRANCE GROUP 2|LIGHT WHIRLPOOL
LEVEL 2 - FOYER AREA GROUP 2|LIGHT WHIRLPOOL
LEVEL 2 - FOYER AREA GROUP 2|LIGHT WHIRLPOOL
LEVEL 2 - CORRIDOR GROUP 2|LIGHT WHIRLPOOL
LEVEL 2 - ELEVATOR AREA GROUP 2|LIGHT WHIRLPOOL
GROUP 2|LIGHT WHIRLPOOL
NIGHT RENDER GROUP GROUP 2|LIGHT 2|LIGHT WHIRLPOOL WHIRLPOOL
GROUP 2|LIGHT WHIRLPOOL
CONNECTION METHOD GROUP 2|LIGHT WHIRLPOOL