Contents 09
Presentation
11
Definition
13
Story of Big Sky
Geology and Hydrology
Biology
Astronomical Alignments
Urban Analysis
National Parks
39
Design
Concept
Master Plan
Plot One
71
Energy performance
Four Ecologies
Five Capitals
Parameters 83
Gr o v e Bi g S k y , M o n t a n a
Set of plans
Presentation 8
Firstly, We would like to acknowledge and honor the land we plan to build the community of Grove with. It is home and habitat for magnificent old growth Firs and Pines, Ravens, Elk, Fungi, Geraniums, Whitetail Deer, Soils and so much more. We thank and ask the land for people to join this natural community and call it Home. We also acknowledge the disturbance this project can cause to the land. We aim to minimize and offset this disturbance by designing something that has a positive impact on the land, families, and community. We hope this project can be an exemplary starting point for a shift in how development is done and a challenge to conventional development to positively impact the greater community, ecosystem, and families whom will call it home. This challenge continues to inspire the creation of Grove. With Appreciation,
Gr o v e Bi g S k y , M o n t a n a
9
Definition 10
¿What is Grove? -A community that preserves and restores the natural ecosystem while introducing optimal living for both the human and non-human.
For a paradigmatic shift with a regenerative future and thriving forests we must look for the recognition of our elders and their knowledge.
-Twentyfive acres of biodiverse land with a well balanced flow of plant and wildlife that allows the harmonious coexistence between natural living ecosystems. -Fifteen living-building homes that recycle water, produce energy and share communal pathways and roads. These homes encircle a restored central wetland (pond) that services the greater habitat. -One Seed Barn that creates biodynamic space for co-work and co-creation, family gatherings, social impact events and a greenhouse for food growth. The barn will be beneficial impact for the watershed it belongs to.
Value: Empawering Interconnected Biodiversity
Process: Enabling Participatory Community
Essence triad* Purpuse : Pioneering Regenerative Stewardship ®Regenesis Group regenesisgroup.com Gr o v e Bi g S k y , M o n t a n a
-Seed Grove looks to honor the Earth that provides all that we need by building a community that harmoniously lives, actively restores, and passionately stewards the land on which it will reside.
11
Story of Big Sky 12
Every place is unique and has its own story to tell and in order to live harmoniously with it, we must learn to listen. From Geology to Urban Analysis, every piece of information can be transformed into principles of design. This place is a beautiful open canvas, a space that is primed for optimal living with dynamic people to flourish in a way they see fit. Being aware of its own Story will enable stewards to be creative within it.
Gr o v e Bi g S k y , M o n t a n a
13
Geology and Hydrology 15
Gr o v e Bi g S k y , M o n t a n a
16
17
Gr o v e Bi g S k y , M o n t a n a
18
19
Gr o v e Bi g S k y , M o n t a n a
Gr o v e Bi g S k y , M o n t a n a
Biology
The Gallatin Watershed is part of the Greater Yellowstone Ecosystem, which is home to the largest concentration of mammals in the lower 48 states. In addition to having a diversity of small animals, the National Park of Yellowstone is notable for its predator–prey complex of large mammals, including eight ungulate species (bighorn sheep, bison, elk, moose, mountain goats, mule deer, pronghorn, and white-tailed deer) and seven large predators (black bears, Canada lynx, coyotes, grizzly bears, mountain lions, wolverines, and wolves).
22
Subalpine fir
Lodgepole pine
Douglas fir
Shrub community
Princess pine
Twin flower
Spirea
Sagebrush
23
Buffalo berrie
Reed grass
Sedges
Upland Soil: Varied geologic rock types consisting of gneiss, limestone, shale, sandstone and volcanic rocks, covered with a thin mantle of soil.
Rushes
More than 6 Feet to Water Table Soil: Moderately fine and fine textured loess (wind desposited) and alluvial soils.
Snowberry
Black cottonwood
More than 6 Feet to Water Table Soil: Medium to moderately fine-textured alluvial soils varying in depth over sand and gravels.
Less than 6 Feet to Water Table
Gallatin River Source: Gallatin Watershed Sourcebook
Records of bird sightings have been kept in Yellowstone since its establishment in 1872. These records document nearly 300 species of birds to date, including raptors, songbirds, shorebirds, and waterfowl. The variation in elevation and broad array of habitat types found within Yellowstone contribute to the relatively high diversity. Many of the birds are migratory species. Reptiles are less studied than amphibians in Yellowstone. There are 6 confrmed species: bullsnake, prairie rattlesnake, rubber boa, sagebrush lizard, common garter snake and terrestrial garter snake. And 5 species of amphibians: Western tiger salamander, boreal chorus frog, Western toad, Columbia spotted frog, and plains spadefoot toad.
Source: National Park Service/Yellowstone
Gr o v e Bi g S k y , M o n t a n a
Settlements
Gr o v e Bi g S k y , M o n t a n a
25
26
27
Gr o v e Bi g S k y , M o n t a n a
Lone Mountain
Wilson Peak
Hyalite Peak
Astronomical Alignments 28
Pioneer Mountain
Levinsky Ridge
Cinnamon Mountain
Sage Peak
Ulerys Lake
Lake Levinski
Hidden Lake
Ennis Lake
Hebgen Lake
Gr o v e Bi g S k y , M o n t a n a
29
Levinsky Ridge
30
31 Gallatin River
Michener Creek
SUN PATH DIAGRAM
SUNRISE, SUNSET, DAWN AND DUSK TIMES GRAPH Gr o v e Bi g S k y , M o n t a n a
Urban Analysis 32
33
Gr o v e Bi g S k y , M o n t a n a
United States Main Watersheds
National Parks 34
The United States has 63 protected areas designated and known as national parks that are operated by the National Park Service, an agency of the Department of the Interior. National parks must be established by an act of the United States Congress.
35
National parks are designated for their natural beauty, unique geological features, diverse ecosystems, and recreational opportunities. National monuments, on the other hand, are frequently chosen for their historical or archaeological significance. While legislatively all units of the National Park System are considered equal with the same mission, national parks are generally larger and more of a destination, and hunting and extractive activities are prohibited. Montana lists 8 out of 63 National Parks and its imperative to be aware of the relevance they have in the sorrounding ecosystem.
Gr o v e Bi g S k y , M o n t a n a
United States National Parks
36
GLACIER NATIONAL PARK
LEWIS & CLARK.
Crown of the Continent. Glacier’s pristine forests, alpine meadows, rugged mountains, and spectacular lakes are a great experience. With over 700 miles of trails, Glacier is a hiker’s paradise for adventurous visitors seeking wilderness and solitude.
The Lewis and Clark National Historic Trail is approximately 4,900 miles long, extending from Pittsburgh, Pennsylvania, to the mouth of the Columbia River, near present day Astoria, Oregon. It follows the historic outbound and inbound routes of the Lewis and Clark Expedition as well as the preparatory section from Pittsburgh, Pennsylvania to Wood River, Illinois.
YELLOWSTONE NATIONAL PARK On March 1, 1872, Yellowstone became the first national park for all to enjoy the unique hydrothermal and geologic wonders. In the depths of winter, the hot springs of Yellowstone appear as colorful jewels amongst the snow.
BIGHORN CANYON. National Recreation Area The vast, wild landscape of Bighorn Canyon National Recreation Area offers visitors unparalleled opportunities to immerse themselves in the natural world, and experience the wonders of this extraordinary place. With over 120,000 acres, one can find an astounding diversity in ecosystems, wildlife, and more than 10,000 years of human history to explore.
BIG HOLE NATIONAL BATTLEFIELD On August 9, 1877 gun shots shattered a chilly dawn on a sleeping camp of Nez Perce. By the time the smoke cleared on August 10, almost 90 Nez Perce were dead along with 31 soldiers and volunteers. Big Hole National Battlefield was created to honor all who were there.
Gr o v e Bi g S k y , M o n t a n a
National Historic Trail
GRANT-KOHRS RANCH. National historic site
Wide open spaces, the hardworking cowboy, his spirited cow pony, and vast herds of cattle are among the strongest symbols of the American West. Grant-Kohrs Ranch National Historic Site preserves these symbols and commemorates the role of cattlemen in American history.
NEZ PERCE.
National historical park Since time immemorial, the valleys, prairies, mountains, and plateaus of the inland northwest have been home to the Nimiipuu (Nez Perce) people. Extremely resilient, they survived the settling of the United States and adapted to a changed world. Nez Perce National Historical Park consists of 38 places important to the history and culture of the Nimiipuu.
LITTLE BIGHORN BATTLEFIELD. National monument
This area memorializes the US Army’s 7th Cavalry and the Lakotas and Cheyennes in one of the Indian’s last armed efforts to preserve their way of life. Here on June 25 and 26 of 1876, 263 soldiers, including Lt. Col. George A. Custer and attached personnel of the US Army, died fighting several thousand Lakota and Cheyenne warriors.
Source: National Park Service
Integrated Design Process
38
Like every other process, design takes time and gets influenced by every person involved in it. The multifactorial nature of a project like this is always a challenge but in the end, is also its greatest strength. This series of back and forward iterations that we call Integrated Design Process (IDP) assembles a larger number of specialists in different and yet complementary subjects to define, evolve and refine every aspect of the global design. Despite the physical distance between the team members, work has been enhanced in digital environments in which collaboration is perfectly feasible.
Gr o v e Bi g S k y , M o n t a n a
39
Preliminaries: Data Collection It is never too much information. Every piece can lead to discovery and later become a strategy or design principle.
40
41
In this stage, general information as location, extension, restrictions, previous work and the current state of the land is processed and arranged in a legible way.
20'x20' SERVICE VEHICLE TURN AROUND MARKED AS "NO PARKING"
FOUR (4) PARKING SPACES
UPPER SHARED DRIVEWAY
' 20 E V PA
EXTEND FOR END UNIT BACK-OUT TURN-AROUND
' 24 E V PA
ER
S
ES
C
AC
LEVEL BUILDING PAD NOT POSSIBLE ON FIRST FOUR (4) LOTS
D
O
RA
W
LO
TURN-AROUND PER FIRE CODE
HORIZONTAL DESIGN DATA UPPER SHARED DRIVEWAY
· · · · ·
M:\182913\Drawings\C3D-ROAD-MP.dwg
PARTIAL BURRY 1ST FLOOR REQUIRED
Gr o v e Bi g S k y , M o n t a n a
MINIMUM HORIZONTAL CURVE RADIUS: 60' (RADIUS IS 60' AS DESIGNED) MAX LENGTH WITHOUT TURNAROUND: 300' (DESIGN LENGTH IS 260') MAX. DISTANCE FROM INTERSECTION: 75' (100' SEPARATION AS DESIGNED) ANGLE TO MAIN ROAD: 70-90 DEGREES (DESIGN IS 80 DEGREES AS DRAWN) MINIMUM TOTAL WIDTH: 12'
LOWER ROADWAY PER GALLATIN COUNTY ROADWAY STANDARDS. NO DEVIATION REQUESTED.
DATE :
2304 NORTH 7TH AVENUE STE. L P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1
WEB:
BOZEMAN, MT 59718 FAX: (406) 522-9225
www.hyaliteeng . com
CONCEPTUAL SITE PLAN BIG SKY, MT
SCALE :
10/10/2018 1" = 80'
JOB NUMBER : 182913 0
Feet
80
SHEET :
1 OF 1
Conceptual: Work Shaping. 42
After data collection, conceptualization becomes the most important aspect of design. This stage provides cohesion and a set of guidelines regarding the scope of work and the desired outcome where concepts is shaped in collaborative sessions. The most important aspects in this stage is the bifurcation of design subjects, although masterplan is still the main focus, housing units take their own relevance and design exploration starts.
Gr o v e Bi g S k y , M o n t a n a
43
Schematic: General Layout 44
It is never too much information. Every piece can become a strategy or design principle. In this stage, general information as location, extension, restrictions, previous work and the current state of the land is processed and arranged in a legible way.
Gr o v e Bi g S k y , M o n t a n a
45
46
47
Gr o v e Bi g S k y , M o n t a n a
48
49
Gr o v e Bi g S k y , M o n t a n a
Architectonic: Concept as a form 50
After numerous iterations, masterplan and housing units derive in a architectonic scale. Roofs, windows, materials and most important of all, interaction between them. This last stage before drawing construction documents is, perhaps, the most intense regarding collaborative work.
Gr o v e Bi g S k y , M o n t a n a
51
1. HONEY
2. CHOCOLATE
3. GRAY
4. DARK GRAY
BODY
BASEMENT
52
53 GROVE 1
GROVE 2
GROVE 3
GROVE 4
SOUTH FACADES
NORTH FACADES
Gr o v e Bi g S k y , M o n t a n a
Wetland restoration 54
Conceptually, wetland restoration was always the main topic in masterplan design. Since very early schemes, potential arrangements revolved around optimal hydrological performances. Natural water flow and projected water cycles were primary subjects to design and for early construction work on site.
Gr o v e Bi g S k y , M o n t a n a
55
56
57
Gr o v e Bi g S k y , M o n t a n a
58
59
Gr o v e Bi g S k y , M o n t a n a
60
61
Gr o v e Bi g S k y , M o n t a n a
Energy performance By Daniel Ibarra
62
Preliminary environmental considerations synthesis. The historic weather data was analyzed using the Bozeman Yellowstone Int. Ap. located 36 miles from Big Sky in order to establish the environmental design goals. During 2/3 of the year, the climate is too harsh to suggest any passive means to achieve comfort, during this period the design will aim to reduce the heating loads, focusing on energy efficiency and during the moderate and warm period during summer, the design will aim to achieve thermal comfort by passive means. The main strategies suggested after a rst round of parametric studies, were to procure south and west orientations to beneffit from the solar heat gains. An ideal window to wall ratio (WWR) was suggested for each orientation. Double glassing for all the orientation should be applied into the construction set adding up, air tightness and high insulation. High insulation can be achieved by many means; the design team chose thatch walls for some of the facades which has proven to be a thermal and sustainable material. Thermal Mass strategically placed in the interior can help to retain heat gains during winter and fresh up during summer, in combination with a proper natural ventilation strategy. A solarium was integrated into the upper floor linking the staircase, this guarantees even heat distribution during winter, and during summer it will function as a chimney exploiting the 37 stack effect During the future design stages, the environmental design team will evaluate the impact on thermal comfort and energy performance of specific design features, assisting the design to achieve our sustainability goals.
Gr o v e Bi g S k y , M o n t a n a
63
64
65
Gr o v e Bi g S k y , M o n t a n a
Five Capitals* 66
67
®Regenesis Group regenesisgroup.com Gr o v e Bi g S k y , M o n t a n a
Parameters 68
69
Gr o v e Bi g S k y , M o n t a n a
72
73
Concept
Mimicking the way tree groves are a small unit that reflects and improve the nature around the place, we want to create house groves that associate with nature and enhance its ecosystem by honoring and merging into the natural energetic flow.
A legacy of prehistoric traditions of nature conservation, sacred groves are patches of forest that rural communities in the developing world protect and revere as sacrosanct. Deeply held spiritual beliefs ensure that not a tree is felled no a creature harmed within its boundaries. Treasure troves for naturalists, the groves often serve as the last refuge for magnificent and ancient trees, as well as for species of lianas, medicinal plants, macaques, deer, birds, lizards, frogs and other creatures that have become rare elsewhere in the landscape. -Madhav Gadgil Gr o v e Bi g S k y , M o n t a n a
In this natural landscape, the wetlands are the very centre of these homes and, just like branches of a tree, each one of them is interconnected by water in a harmonious way.
Master Plan
74
75
Gr o v e Bi g S k y , M o n t a n a
76
77
Gr o v e Bi g S k y , M o n t a n a
Gr o v e Bi g S k y , M o n t a n a
Lot One 80
81
Gr o v e Bi g S k y , M o n t a n a
Grove 1 82
83 Basement
First Floor
Ground Floor
Roof
Gr o v e Bi g S k y , M o n t a n a
84
85 Section
Gr o v e Bi g S k y , M o n t a n a
86
87
Gr o v e Bi g S k y , M o n t a n a
Grove 2 88
89 Basement
First Floor
Ground Floor
Roof
Gr o v e Bi g S k y , M o n t a n a
90
91 Section
Gr o v e Bi g S k y , M o n t a n a
92
93
Gr o v e Bi g S k y , M o n t a n a
Grove 3 94
95 Basement
First Floor
Ground Floor
Second Floor
Gr o v e Bi g S k y , M o n t a n a
96
97 Section
Roof
Gr o v e Bi g S k y , M o n t a n a
98
99
Gr o v e Bi g S k y , M o n t a n a
100
101
Gr o v e Bi g S k y , M o n t a n a
Grove 4 102
103 Basement
First Floor
Ground Floor
Second Floor
Gr o v e Bi g S k y , M o n t a n a
104
105 Section
Roof
Gr o v e Bi g S k y , M o n t a n a
106
107
Gr o v e Bi g S k y , M o n t a n a
108
109
Gr o v e Bi g S k y , M o n t a n a
Particular ways of inhabiting these houses are possible thanks to a flexible room that has been designed to meet a large number of different dynamics inside the house. Families can adjust solariums to their specific needs. One can choose between an extra bedroom and a perfectly lighted workspace or between a tv room and a greenhouse.
Solarium 110
111
Gr o v e Bi g S k y , M o n t a n a
Option 1
Option 3
Option 2
Option 4
112
113
Gr o v e Bi g S k y , M o n t a n a
Barn 114
Ground Floor
First Floor
Gr o v e Bi g S k y , M o n t a n a
Roof Plan
115
116
117 Section
Gr o v e Bi g S k y , M o n t a n a
118
119
Gr o v e Bi g S k y , M o n t a n a
120
121
Gr o v e Bi g S k y , M o n t a n a
122
123
Gr o v e Bi g S k y , M o n t a n a
Set of plans 124
125
Gr o v e Bi g S k y , M o n t a n a
Site Plan Ground Floor SITE PLAN GROUND FLOOR
NORTH
LOCATION SITE
1-1'
PORCH
1-1
PARKING
STORAGE SEED SEEDLING
STORAGE STRAW SPACE
ADMIN
ENTRY MUDROOM
BATHROOMS KITCHEN
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX 2
WORK PAVILION
GROVE
SECTION
1
2 WORK PAVILION
3 4
7
3
5 8
6
FIREPIT
GROVE
PAVILION
POND
Transition
10
GROVE
4
9
11 12 GROVE 5
Transition
15 14
13
SYMBOLOGY A'
A
F
E
D
C
B
a
SECTION WALL
SEED STORAGE SEEDLING
LOW WALL
OFFICE
BATHROOMS UP
OPTIONS
PROJECTION
GROVE 1
ENTRY ENTRY
FREE SPACE
ENTRY
D A OL
H
2-2'
SECTION
ARCH XX
AREAS.
A
S G T L Y D R
S A L T D
Y D R O H G
2
3229 ft2 (300m2)
CONSTRUCTED AREA
6871.7 ft2 (638.4 m2)
UP
GR OV
MUDROOM
MUDROOM
ENTRY
ENTRY
LA
UN
DR
Y
BU
NK RO TVR OM OO / M
1
2
MU
DR OO
M
UP Y
RD
H
G D T A L S
EN
TRY
GROVE 2
STO
RA
GA
GE
RA
GE
MN
3
LA
UN
DR
Y
BU
NK RO TVR OM OO M
FOOTPRINT
UP
MN
O
WORK PAVILION
BEDROOM 4
STORAGE LAUNDRY
BEDROOM 4
STORAGE LAUNDRY
E
MN
BEDROOM
OFFICE TV ROOM
MN
BEDROOM
OFFICE TV ROOM
WORK PAVILION
GROVE 1
/
MU
FOOTPRINT
5683.3 ft2 (528m2)
CONSTRUCTED AREA
13,153.5 ft2 (1222 m2)
DR
OO
M
UP A Y D R
GH
O
D
T A L S
EN
TRY
Transition
STO
RA
GA
GE
RA
GE
4
MN
LA
UN
DR
Y
7
BU
NK RO TVR OM OO
M
/ MU
DR
OO
M
UP T S
L
D A
A
GROVE 3
L
Y D R O H G
EN
5
TRY
STO
RA
GA
GE
RA
GE
MN
FOOTPRINT
10,494.8 ft2 (975m2)
CONSTRUCTED AREA
18,186.7 ft2 (1689.6 m2)
LA
UN
DR
Y
DIN
UP
ING
FIRE PLAC
BU
E
NK RO TVR OM OO
M
/
MU
DR
D T A L
OO
M
UP
TO
ING
T
RD
T D A L S
SG Y D R O S A L
LIV
ILE
H Y
G L O
H
PAVILION
RO
OM
PA
NTR
Y
EN
TRY
KIT
CH
EN
STO
RA
GA
GE
RA
GE
LOT 4 1.02 AC
LOT 1 8.34 AC
6
GROVE 4
8
DIN
UP
ING
FIRE
PLAC E
A L S D T
FOOTPRINT
5651 ft2 (525m2)
CONSTRUCTED AREA
9881.3 ft2 (918 m2)
A L SO G D R
H Y
TO
LIV
ILE
ING
T
RO
OM
PA
NTR
Y KIT
CH
EN
WETLAND
FIREPIT
BARN FOOTPRINT
9 DIN
CONSTRUCTED AREA
UP
ING
FIRE
PLA CE
D
L A T
S A L
GH
Y D R O
TO
LIV
ING
T
RO
3
ILE
OM
PA
NTR
KIT
CH
DIN
GR
OV
EN
E
Y
10 UP
ING
2010 ft2 (186.8m2) 3444 ft2 (320 m2)
PAVILIONS FOOTPRINT
807 ft2 (75m2)
CONSTRUCTED AREA
807 ft2 (75m2)
FIRE
PLA
CE
11
G T A L S D R
Y
HL
TO
LIV
ILE
ING
T
RO
OM
PA
NTR
Y
O
KIT
CH
EN
DIN
UP
ING
FIRE
PLA
CE
S A L TG
O
A D
Y D R H
TO
LIV
ILET
ING
NTR
Y
KIT
CH
EN
DIN
UP
ING
RO
OM
PA
12
OWNER:
Big Country Development
FIRE
PLA
CE
TO
LIV
ILE
ING
T
Transition
13 14 TOIL
TRY
PAN
ET
M
HEN
ROO
KITC
UP
NG
LIVI L
M
HEN
ROO
KITC
NG
LIVI C
ING DIN
ET
LACE
FIREP
TRY
PAN
TOIL
M ROO
HEN KITC
UP
NG
LIVI D
KIT
CH
EN
LG Y D R O S A L
DESIGN STUDIO
TALLER 13 THE GROVE
LACE FIREP
ET
Y D R H G
D T A L S
A
Y
ING DIN
C
TRY
PAN
TOIL
UP
O
Y R H
NTR
PROYECT.
15
G D T O S A L
RO
OM
PA
H
D T A
GROVE 4
ADRESS.
C
ING DIN
LACE
FIREP
Partridge Hollow, Big Sky, MT
A
D R O YG L H
S
D T A L
DATE: 01 OCTOBER 2021 SCALE. 1:2000
Gr o v e Bi g S k y , M o n t a n a
SITE PLAN FIRST FLOOR
NORTH
LOCATION SITE
1-1'
PORCH
1-1
PARKING
SEED STORAGE
STORAGE
SEEDLING
STRAW SPACE
ADMIN
MUDROOM ENTRY
KITCHEN
BATHROOMS
GROVE 1
FREE SPACE
ARCH XX
SECTION
ARCH XX SECTION
GROVE
2
WORK PAVILION
1
2 WORK PAVILION
3 4 7 5 8
6
FIREPIT
GROVE
3
PAVILION
POND
Transition
GROVE
10
4
9
11 12 GROVE 5
Transition
15 14
13
2-2'
ARCH XX
SECTION
SYMBOLOGY F
E
D
C
B
A'
A
a
SECTION WALL
KITCHEN
LOW WALL
MULTIPURPOSE SPACE
COWORK
DOWN
PROJECTION
UP
GROVE 1
2-2'
SECTION
ARCH XX
AREAS. BEDROOM 2
BEDROOM 3
BEDROOM 2
BEDROOM 3
PANTRY
UP
PANTRY
UP
OV E
DOWN
2
DOWN
TOILET
MN
TOILET
MN
WORK PAVILION
GROVE 1 FOOTPRINT
3229 ft2 (300m2)
CONSTRUCTED AREA
6871.7 ft2 (638.4 m2)
FIREPLACE
FIREPLACE
GR
KIT
CH
EN
2
PA
NTR
Y
DIN
ING
TO
ILE
T
SO
LA
DOWN
1
KITCHEN
DINING
LIVING ROOM
KITCHEN
DINING
LIVING ROOM
MN
RIU
M
GROVE 2
UP
LIV
ING
WORK PAVILION
RO
OM
C
FIREP
LAC
E
3
MN
KIT
CH
EN
FOOTPRINT
5683.3 ft2 (528m2)
CONSTRUCTED AREA
13,153.5 ft2 (1222 m2)
PA
NTR
Y
DIN
TO
ING
ILE
T
SO
LA
DOWN
RIU
M
Transition
UP
LIV
ING
RO
OM
C
4
FIREP
LAC
E
MN
KIT
GROVE 3
CH
EN
PA
NTR
Y
DIN
TO
ING
ILE
T
SO
LA
DOWN
7
RIU
M
UP
LIV
ING
OM
C
MN
TRY
MU
DR OO
CONSTRUCTED AREA
18,186.7 ft2 (1689.6 m2)
CE
5
EN
PA
NTR
Y
DIN
ING UP
FIREP
LAC
E
UP
CH
LA
UN
DR
Y
DIN
TO
ING
ILE
ING
SO
LAR
STO
IUM
GE
KIT
CH
RO
FIREP
LAC
E
TRY
MU
DR
GROVE 4
MN
6
EN
EN
8
OM
LOT 1 8.34 AC
RO
OM
RA
UP
LIV
ING
C
LIV
T
C
10,494.8 ft2 (975m2)
PLA
DOWN
LOT 4 1.02 AC
FOOTPRINT M
FIRE
KIT
PAVILION
EN
MN
RO
OO
M
DIN
ING UP
FIRE
PLA
CE
C
FOOTPRINT
5651 ft2 (525m2)
CONSTRUCTED AREA
9881.3 ft2 (918 m2)
UP
LAU
ND
RY
LIV
ING
STO
GE
KIT
CH
WETLAND
FIREPIT
RO
OM
RA
EN
BARN FOOTPRINT
EN
TRY
9
MN
MU
DR
OO
M
DIN
CONSTRUCTED AREA
ING UP
FIREP
LAC
E
C
UP
LA
UN
DR
Y
LIV
KIT
CH
EN
MU
MN
DR
OO
GR
M
OV
GE
E
OM
RA
TRY
10
RO
3
ING
STO
EN
DIN
ING UP
2010 ft2 (186.8m2) 3444 ft2 (320 m2)
PAVILIONS FOOTPRINT
807 ft2 (75m2)
CONSTRUCTED AREA
807 ft2 (75m2)
FIRE
PLA
CE
C
UP
LAU
ND
EN
RY
TRY
11
LIV
ING
STO
RO
OM
RA
GE
MN
MU
DR
OO
M KIT
CH
EN
DIN
ING UP
FIRE
PLAC E C
UP
LA
UN
EN
DR
TRY
Y
LIV
ING
STO
GE
DR
OO
M KIT
CH
EN
DIN
ING UP
RO
OM
RA
MU
MN
12
OWNER:
Big Country Development
FIREP
LAC
E
C
UP
LA
UN
DR
Y
GROVE 4
LIV
ING
STO
Transition
13
KIT
CH
EN
DESIGN STUDIO
TALLER 13 PROYECT.
E RAG
M ROO
STO
MUD UP
LAU NDR
MN
Y
ENT RY
ET
TRY
TOIL
PAN
15
GE
Y
ENTR
14
RO
OM
RA
E
RAG
OM
STO
DRO
HEN KITC
ING
DIN
UP
MU UP
NG
C
NDR
LIVI
LAU
MN
Y
ENT
M
ACE FIREPL
ROO
ET
TRY
TOIL
PAN
RY
HEN
M
RAG
ROO
STO
KITC
ING DIN
UP
MUD
E
L
H G Y D R O
T L S A D
Y
NG
C
NDR
MN
LIVI
LAU
UP
ACE
M
ROO
TRY
ET
FIREPL
PAN
TOIL
UP
KITC
ING
DIN
HEN T Y R O S A L H G D
THE GROVE ADRESS.
C LACE
M
FIREP
G ROO
LIVIN
Partridge Hollow, Big Sky, MT
T Y R O S A L H G D
DATE: 01 OCTOBER 2021 SCALE. 1:2000
Gr o v e Bi g S k y , M o n t a n a
SITE PLAN SECOND FLOOR
NORTH
LOCATION SITE
1-1'
PORCH
1-1
PARKING
STORAGE SEED SEEDLING
STORAGE STRAW SPACE
ADMIN
ENTRY MUDROOM
BATHROOMS KITCHEN
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX 2
WORK PAVILION
GROVE
SECTION
1
2 WORK PAVILION
3 4
7
3
5 8
6
FIREPIT
GROVE
PAVILION
POND
Transition
10
GROVE
4
9
11 12 GROVE 5
Transition
15 14
13
SYMBOLOGY F
E
D
C
B
A'
A
a
SECTION WALL LOW WALL PROJECTION
GROVE 1 2-2'
SECTION
ARCH XX
AREAS. BEDROOM 1
BEDROOM 1 DOWN
2
WORK PAVILION
GROVE 1 3229 ft2 (300m2)
CONSTRUCTED AREA
6871.7 ft2 (638.4 m2)
C
GR OV
C
E
DOWN
FOOTPRINT SOLARIUM
SOLARIUM
MN
BED
OM
FIRE
PLA CE
2
1
2
DOWN
RO
BED
RO
OM
1
BED
GROVE 2
RO
OM
WORK PAVILION
3
C
3
MN
BED
FOOTPRINT
5683.3 ft2 (528m2)
CONSTRUCTED AREA
13,153.5 ft2 (1222 m2)
DOWN
RO
OM
FIRE
PLA
2
CE
BED
RO
OM
1
Transition
BED
RO
OM
3
C
4
MN
7
BED
OM
FIRE
PLA
2
CE
BED
BED
OM
1
RO
OM
OM
2
RO
OM
3
18,186.7 ft2 (1689.6 m2)
RO
OM
PLA
CE
BED
RO
OM
8
6
1
BED
RO
OM
CONSTRUCTED AREA
BED
DOWN
BED FIRE
2
10,494.8 ft2 (975m2)
C
DOWN
RO
FOOTPRINT MN
UP
BED
OM
LOT 4 1.02 AC
3
C
MN
RO
5
RO
BED
PAVILION
GROVE 3
DOWN
RO
3
C
LOT 1 8.34 AC
1
BED
RO
OM
2
GROVE 4
MN
C
BED
RO
UP
OM
DOWN
3
FOOTPRINT
5651 ft2 (525m2)
CONSTRUCTED AREA
9881.3 ft2 (918 m2)
BED
RO
OM
1
WETLAND
FIREPIT
BARN BED
FOOTPRINT
RO
OM
2
9
MN
C
CONSTRUCTED AREA
BED
RO
UP
OM
3
DOWN
OV
2
MN
GR
10
1
E
OM
RO
OM
3
BED RO
BED
C
2010 ft2 (186.8m2) 3444 ft2 (320 m2)
PAVILIONS FOOTPRINT
807 ft2 (75m2)
CONSTRUCTED AREA
807 ft2 (75m2)
BED
RO
UP
OM
3
DOWN
11
BED
RO
OM
2
BED
RO
OM
MN
1
C
BED
RO
UP
OM
DOWN
12
BED
RO
OM
2
BED
RO
OM
1
3
OWNER:
Big Country Development
MN
C
BED
RO
UP
OM
3
DOWN
GROVE 4
BED
RO
OM
Transition M
BED
ICE
OFF ROO TV
13 M2
ROO UP
M
BED
ICE
TALLER 13
M1
ROO
UP
BED
M2
MN
ROO
15
DESIGN STUDIO
PROYECT.
OFF ROO TV
14
1
C
DOWN
BED ROO
M
BED
ICE
M3
OFF ROO TV
M1
ROO
UP
BED
M2
MN
ROO
THE GROVE
C
DOWN
BED ROO M3
MN BED M1
ROO
ADRESS.
C
DOWN
BED ROO M3
Partridge Hollow, Big Sky, MT DATE: 01 OCTOBER 2021 SCALE. 1:2000
Gr o v e Bi g S k y , M o n t a n a
SITE PLAN THIRD FLOOR
NORTH
133
LOCATION SITE
1-1'
PORCH
1-1
PARKING
STORAGE SEED SEEDLING
STORAGE STRAW SPACE
ADMIN
ENTRY MUDROOM
BATHROOMS KITCHEN
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX 2
WORK PAVILION
GROVE
SECTION
1
2 WORK PAVILION
3 4
7
3
5 8
6
FIREPIT
GROVE
PAVILION
POND
Transition
10
GROVE
4
9
11 12 GROVE 5
Transition
15 14
13
F
E
D
C
B
A'
A
SYMBOLOGY a
SECTION WALL
GROVE 1
LOW WALL PROJECTION
2-2'
SECTION
ARCH XX
AREAS. C
OV
C
E
2
WORK PAVILION
GR
GROVE 1
2 WORK PAVILION
C
1
FOOTPRINT
3229 ft2 (300m2)
CONSTRUCTED AREA
6871.7 ft2 (638.4 m2)
3 GROVE 2
Transition
4
C
7
RO
OM
DOWN
8
6
C
MN
LOT 1 8.34 AC
CONSTRUCTED AREA
13,153.5 ft2 (1222 m2)
GROVE 3
C
BED
PAVILION LOT 4 1.02 AC
5683.3 ft2 (528m2)
MN
5
C
FOOTPRINT
C
FOOTPRINT
10,494.8 ft2 (975m2)
CONSTRUCTED AREA
18,186.7 ft2 (1689.6 m2)
C
BED
RO
OM
C
DOWN
GROVE 4
WETLAND
FIREPIT
5651 ft2 (525m2)
CONSTRUCTED AREA
9881.3 ft2 (918 m2)
MN
9
FOOTPRINT
BARN
C
BED
RO
OM
C
DOWN
3
FOOTPRINT
GR
MN
OV
E
10
C
BED RO
OM
CONSTRUCTED AREA
C
2010 ft2 (186.8m2) 3444 ft2 (320 m2)
DOWN
PAVILIONS MN
11
C
FOOTPRINT
807 ft2 (75m2)
CONSTRUCTED AREA
807 ft2 (75m2)
BED
RO
OM
C
DOWN
MN
12
C
BED
RO
OM
DOWN
GROVE 4
Transition
13
OWNER:
Big Country Development DESIGN STUDIO
INE
ICE
ZAN
OFF
MEZ
14
DOWN
MN
INE
ICE
ZAN
OFF
MEZ
M4
ROO
C
BED
15
C
TALLER 13
DOWN
MN
PROYECT.
M4
ROO
C
BED
INE
ICE
ZAN
OFF
MEZ DOWN
MN M4
ROO
C
BED
THE GROVE ADRESS.
Partridge Hollow, Big Sky, MT DATE: 01 OCTOBER 2021 SCALE. 1:2000
Gr o v e Bi g S k y , M o n t a n a
NORTH
GROVE 1
135
TV ROOM
1-1'
PORCH
1-1
PARKING
SEED STORAGE SEEDLING
STORAGE SPACE STRAW
ADMIN
ENTRY MUDROOM
KITCHEN
BATHROOMS
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX SECTION
2
WORK PAVILION
GROVE
4-4'
ARCH XX SECTION
5-5'
ARCH XX SECTION
4-4'
ARCH XX SECTION
5-5'
ARCH XX SECTION
LOCATION SITE
1
2 WORK PAVILION
3 4 7 5 8
6
FIREPIT
GROVE
3
PAVILION
POND
Transition
GROVE
4
9 10 11 12 GROVE 5
Transition
15 14
OPTION 1
13
SYMBOLOGY a
OPTIONS
SECTION WALL LOW WALL PROJECTION
A
G
L S
S A
H
D
T L
BEDROOM 4
Y O R D
E SJ
E
O M
D RI
H
RA
S
A S A
3-3'
ÑA B
3-3'
ARCH XX SECTION
ARCH XX SECTION
3-3'
3-3'
ARCH XX SECTION
ARCH XX SECTION
SOLARIUM
GROVE LOCATION BEDROOM 4
MN
2-2'
2-2'
STORAGE LAUNDRY
ARCH XX SECTION
ARCH XX SECTION
2-2' ARCH XX SECTION
2-2' ARCH XX SECTION
BEDROOM 1
OPTION 2
DOWN
OFFICE TV ROOM BEDROOM
ENTRY
1-1'
UP
ARCH XX SECTION
MUDROOM
2 1-1' ARCH XX SECTION
1-1'
1
1-1'
ARCH XX SECTION
ARCH XX SECTION
C
GF
ARCH XX SECTION
ARCH XX SECTION
4-4'
OPTION 3
BEDROOM 2
MN DINING
BEDROOM 3
4-4'
3-3'
3-3'
ARCH XX SECTION
2-2'
2-2'
ARCH XX SECTION
GROUND FLOOR CONSTRUCTION
1017 ft2 (94.5 m2)
FIRST FLOOR CONSTRUCTION
1485 ft2 (138 m2)
SECOND FLOOR CONSTRUCTION
933 ft2 (86.7 m2)
CONSTRUCTED AREA
3436 ft2 (319.2 m2)
GARAGE
603 ft2 (56 m2)
SOLAR AREA
539 ft2 (50.12 m2)
Big Country Development DESIGN STUDIO
1-1'
ARCH XX SECTION
1615 ft2 (150m2)
OWNER:
ARCH XX SECTION
LIVING ROOM
1-1'
FOOTPRINT
ARCH XX SECTION
UP
FIREPLACE
DOWN
2-2' ARCH XX SECTION
ARCH XX SECTION
5-5' 3-3' ARCH XX SECTION
GROVE 1 AREAS PER HOUSE
ARCH XX SECTION
4-4'
KITCHEN
PANTRY
TOILET
ARCH XX SECTION
ARCH XX SECTION
5-5' 2-2'
AREAS.
2F
3-3' ARCH XX SECTION
ARCH XX SECTION
5-5'
ARCH XX SECTION
4-4'
ARCH XX SECTION
5-5'
OFFICE
ARCH XX SECTION
1-1'
TALLER 13
1-1'
ARCH XX SECTION
ARCH XX SECTION
C
PROYECT.
ARCH XX SECTION
4-4'
ARCH XX SECTION
3F
5-5'
ARCH XX SECTION
4-4'
1F
ARCH XX SECTION
THE GROVE 5-5'
134
ADRESS. 0m
1m
3m
Partridge Hollow, Big Sky, MT DATE: 01 OCTOBER 2021 SCALE. 1:100
Gr o v e Bi g S k y , M o n t a n a
GROVE 1 SECTIONS
137
LOCATION SITE
SOLARIUM
SOLARIUM
MASTER
1-1'
PORCH
1-1
PARKING
SEED STORAGE SEEDLING
STORAGE SPACE STRAW
ADMIN
ENTRY MUDROOM
KITCHEN
BATHROOMS
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX SECTION
GROVE
2
WORK PAVILION
1
2 WORK PAVILION
3 4 7 5 8
6
FIREPIT
GROVE
3
PAVILION
POND
Transition
10
4
9 GROVE
136
NORTH
11 12 GROVE 5
Transition
15 14
BATHROOM
BEDROOM 3
LIVING ROOM
LIVING ROOM
DINING
KITCHEN
SYMBOLOGY a
MUDROOM TV ROOM
MUDROOM
13
SECTION
GARAGE
WALL LOW WALL
ENTRY
PROJECTION
GROVE LOCATION
SECTION 1-1'
SECTION 4-4' 01
2
DET-XX
SOLARIUM
SOLARIUM
1
AREAS.
BEDROOM 1
GROVE 1 AREAS PER HOUSE
BEDROOM 3
DINING
PANTRY
FOOTPRINT
1615 ft2 (150m2)
GROUND FLOOR CONSTRUCTION
1017 ft2 (94.5 m2)
FIRST FLOOR CONSTRUCTION
1485 ft2 (138 m2)
SECOND FLOOR CONSTRUCTION
933 ft2 (86.7 m2)
CONSTRUCTED AREA
3436 ft2 (319.2 m2)
GARAGE
603 ft2 (56 m2)
SOLAR AREA
539 ft2 (50.12 m2)
GARAGE DECK
BATHROOM
STORAGE LAUNDRY
BEDROOM 4
SECTION 2-2'
SECTION 5-5'
OWNER:
Big Country Development SOLARIUM BATHROOM
BEDROOM 2
DESIGN STUDIO
WALKING CLOSET
TOILET
TALLER 13 PANTRY
PROYECT.
KITCHEN
THE GROVE
GARAGE BEDROOM 4
ADRESS.
Partridge Hollow, Big Sky, MT DATE: 01 OCTOBER 2021 SCALE. 1:100
SECTION 3-3'
Gr o v e Bi g S k y , M o n t a n a
NORTH
138
139
LOCATION SITE
GROVE 1
1-1'
PORCH
1-1
PARKING
SEED STORAGE SEEDLING
STORAGE SPACE STRAW
ADMIN
KITCHEN
ENTRY MUDROOM
BATHROOMS
GROVE 1
FREE SPACE
2
WORK PAVILION
GROVE
FACADES
ARCH XX SECTION
ARCH XX SECTION
1
2 WORK PAVILION
3 4 7 5 8
6
FIREPIT
GROVE
3
PAVILION
POND
Transition
GROVE
10
4
9
11 12 GROVE 5
Transition
15 14
13
SYMBOLOGY a
SECTION WALL LOW WALL PROJECTION
GROVE LOCATION
2
EAST FACADE
1
NORTH FACADE
AREAS. GROVE 1 AREAS PER HOUSE
01 DET-XX
01 DET-XX
FOOTPRINT
1615 ft2 (150m2)
GROUND FLOOR CONSTRUCTION
1017 ft2 (94.5 m2)
FIRST FLOOR CONSTRUCTION
1485 ft2 (138 m2)
SECOND FLOOR CONSTRUCTION
933 ft2 (86.7 m2)
CONSTRUCTED AREA
3436 ft2 (319.2 m2)
GARAGE
603 ft2 (56 m2)
SOLAR AREA
539 ft2 (50.12 m2)
OWNER:
Big Country Development DESIGN STUDIO
TALLER 13 WEST FACADE
PROYECT.
SOUTH FACADE
THE GROVE ADRESS.
Partridge Hollow, Big Sky, MT DATE: 01 OCTOBER 2021 SCALE. 1:100
Gr o v e Bi g S k y , M o n t a n a
4-4'
ARCH XX SECTION
5-5'
ARCH XX SECTION
4-4'
GROVE 2
141
LOCATION SITE
ARCH XX SECTION
5-5'
140
ARCH XX SECTION
NORTH
1-1'
PORCH
1-1
PARKING
SEED STORAGE SEEDLING
STORAGE STRAW SPACE
ADMIN
MUDROOM ENTRY
KITCHEN
BATHROOMS
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX SECTION
GROVE
2
WORK PAVILION
1
2
WORK PAVILION
3 4 7 5 8
6
FIREPIT
GROVE
3
PAVILION
POND
Transition
GROVE
4
9 10 11 12 GROVE 5
Transition
15 14
13
SYMBOLOGY a
SECTION WALL LOW WALL
MN LAUNDRY
PROJECTION
MN
MUDROOM ENTRY
3-3'
3-3'
UP
ARCH XX SECTION
ARCH XX SECTION
3-3'
3-3'
ARCH XX SECTION
ARCH XX SECTION
BEDROOM 1
GROVE LOCATION
FIREPLACE
BUNKROOM/ TVROOM
2-2'
2-2'
ARCH XX SECTION
ARCH XX SECTION
2-2'
2-2'
DOWN
ARCH XX SECTION
3
ARCH XX SECTION
4
GARAGE BEDROOM 3
BEDROOM 2
5
R O
M
ID H
A S
A
S
A R E
JE
S
Ñ
A
B
A
1-1'
ARCH XX SECTION
4-4'
ARCH XX SECTION
ARCH XX SECTION
5-5'
ARCH XX SECTION
1-1'
1-1'
ARCH XX SECTION
F2
AREAS. GROVE 2
GF 4-4'
ARCH XX SECTION
5-5'
ARCH XX SECTION
4-4'
ARCH XX SECTION
5-5'
ARCH XX SECTION
AREAS PER HOUSE
OFFICE
UP
OPTIONS
MN
3-3'
OPTION 1
PANTRY
SOLARIUM KITCHEN
ARCH XX SECTION
6
ARCH XX SECTION
C
ARCH XX SECTION
STORAGE
1-1'
4-4'
T S L S
ARCH XX SECTION
A L
5-5'
O
G
D
DY
H R
2-2'
UP
ARCH XX SECTION
3-3' ARCH XX SECTION
TOILET
2-2' ARCH XX SECTION
DOWN
3-3'
3-3'
ARCH XX SECTION
ARCH XX SECTION
2-2'
2-2'
ARCH XX SECTION
FOOTPRINT
1421 ft2 (132m2)
GROUND FLOOR CONSTRUCTION
843 ft2 (78.3 m2)
FIRST FLOOR CONSTRUCTION
1223 ft2 (113.6 m2)
SECOND FLOOR CONSTRUCTION
1223 ft2 (113.6 m2)
CONSTRUCTED AREA
3288 ft2 (305.5 m2)
GARAGE
577 ft2 (53.6 m2)
SOLAR AREA
370 ft2 (34.38 m2)
ARCH XX SECTION
OWNER:
DINING
Big Country Development
LIVING ROOM
DESIGN STUDIO 1-1'
1-1'
ARCH XX SECTION
C
ARCH XX SECTION
FIREPLACE
1-1'
1-1'
ARCH XX SECTION
ARCH XX SECTION
C
TALLER 13 THE GROVE
ARCH XX SECTION
4-4'
ARCH XX SECTION
F3
5-5'
ARCH XX SECTION
4-4'
ARCH XX SECTION
F1
5-5'
PROYECT.
0m
1m
3m
ADRESS.
Partridge Hollow, Big Sky, MT DATE
01 OCTOBER 2021
SCALE. 1:100
Gr o v e Bi g S k y , M o n t a n a
GROVE 2 SECTIONS
NORTH
142
143
LOCATION SITE
BEDROOM 2
BEDROOM 3
BEDROOM 1
BEDROOM 3
1-1'
PORCH
1-1
PARKING
SEED STORAGE SEEDLING
STORAGE STRAW SPACE
ADMIN
KITCHEN
MUDROOM ENTRY
BATHROOMS
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX SECTION
GROVE
2
WORK PAVILION
1
2 WORK PAVILION
3 4 7 5 8
6
FIREPIT
GROVE
3
PAVILION
POND
Transition
10
DINNING
LIVING ROOM
LIVING ROOM
GROVE
4
9
11
TV ROOM
12 GROVE 5
Transition
15 14
13
SYMBOLOGY a BATHROOM
STORAGE
GARAGE
GARAGE
SECTION
MUDROOM
WALL LOW WALL PROJECTION
GROVE LOCATION
3
SECTION 1-1'
SECTION 4-4'
4
5
6 BATHROOM
AREAS. KITCHEN
GROVE 2
LIVING ROOM
AREAS PER HOUSE GARAGE TV ROOM
SECTION 2-2'
BATHROOM
FOOTPRINT
1421 ft2 (132m2)
GROUND FLOOR CONSTRUCTION
843 ft2 (78.3 m2)
FIRST FLOOR CONSTRUCTION
1223 ft2 (113.6 m2)
SECOND FLOOR CONSTRUCTION
1223 ft2 (113.6 m2)
CONSTRUCTED AREA
3288 ft2 (305.5 m2)
GARAGE
577 ft2 (53.6 m2)
SOLAR AREA
370 ft2 (34.38 m2)
STORAGE
WALKING CLOSET
OWNER:
BEDROOM 1
KITCHEN
Big Country Development DESIGN STUDIO
TV ROOM
LAUNDRY
MUDROOM
SECTION 5-5'
TALLER 13 PROYECT.
ENTRY
THE GROVE ADRESS.
Partridge Hollow, Big Sky, MT DATE
SECTION 3-3'
Gr o v e Bi g S k y , M o n t a n a
01 OCTOBER 2021
SCALE. 1:100
NORTH
GROVE 2
145
LOCATION SITE
FACADES 1-1'
PORCH
1-1
PARKING
SEED STORAGE SEEDLING
STORAGE STRAW SPACE
ADMIN
KITCHEN
MUDROOM ENTRY
BATHROOMS
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX SECTION
GROVE
2
WORK PAVILION
1
2
WORK PAVILION
3 4 7 5 8
6
FIREPIT
GROVE
3
PAVILION
POND
Transition
4
9 10
GROVE
144
11 12 GROVE 5
Transition
15 14
13
SYMBOLOGY a
SECTION WALL LOW WALL PROJECTION
GROVE LOCATION
3
4
5
6
WEST FACADE
AREAS. SOUTH FACADE
GROVE 2 AREAS PER HOUSE FOOTPRINT
1421 ft2 (132m2)
GROUND FLOOR CONSTRUCTION
843 ft2 (78.3 m2)
FIRST FLOOR CONSTRUCTION
1223 ft2 (113.6 m2)
SECOND FLOOR CONSTRUCTION
1223 ft2 (113.6 m2)
CONSTRUCTED AREA
3288 ft2 (305.5 m2)
GARAGE
577 ft2 (53.6 m2)
SOLAR AREA
370 ft2 (34.38 m2)
OWNER:
Big Country Development EAST FACADE
NORTH FACADE
DESIGN STUDIO
TALLER 13 PROYECT.
THE GROVE ADRESS.
Partridge Hollow, Big Sky, MT DATE
01 OCTOBER 2021
SCALE. 1:100
Gr o v e Bi g S k y , M o n t a n a
3-3'
ARCH XX SECTION
4-4'
ARCH XX SECTION
3-3'
ARCH XX SECTION
4-4'
ARCH XX SECTION
GROVE 3
SOLARIUM
147
LOCATION SITE
DOWN
OPTION 1
OPTIONS
C
MN
C
1-1'
PORCH
1-1
PARKING
SEED STORAGE SEEDLING
STORAGE STRAW SPACE
ADMIN
ENTRY MUDROOM
BATHROOMS
KITCHEN
SECTION
SECTION
2
WORK PAVILION
1
2 WORK PAVILION
3 4 7
5 3
PAVILION
A D L
RD Y
H
A
B
R
SA
E
H
D
A MO RI
8
6
ALG
J
EÑ
SA
FIREPIT
GROVE
SO
C TS
S
ARCH XX
GROVE 1
FREE SPACE
ARCH XX
GROVE
FIREPLACE UP
POND
Transition
GROVE
4
9 10 11
DINING
12 GROVE 5
Transition
15 14
2-2'
2-2'
ARCH XX SECTION
ARCH XX SECTION
BEDROOM
2-2' ARCH XX SECTION
2-2'
1-1'
a
ARCH XX SECTION
SECTION
DOWN
1-1' ARCH XX SECTION
1-1'
WALL
1-1'
ARCH XX SECTION
13
SYMBOLOGY
OFFICE
ARCH XX SECTION
DOWN
LIVING ROOM
OPTION 2
ARCH XX SECTION
LOW WALL PROJECTION
TOILET
GROVE LOCATION
C
KITCHEN
PANTRY
Transition
4 7 5
TV ROOM
GF
F2
8
6
POND
DOWN
OPTION 3
OV GR
10
E
4
9 GROVE 1
11 12
MN
ENTRY
FIREPLACE
C
Transition
C
UP
DINING
MUDROOM
2-2'
AREAS.
2-2'
ARCH XX SECTION
ARCH XX SECTION
LIVING ROOM
1-1'
UP
ARCH XX SECTION
GROVE 3 AREAS PER HOUSE
1-1' ARCH XX SECTION
LAUNDRY
KITCHEN
STORAGE
GF
F3
BEDROOM 2
ARCH XX SECTION
3-3'
ARCH XX SECTION
4-4'
0m
1m
3m
FOOTPRINT
1749 ft2 (162.5m2)
GROUND FLOOR CONSTRUCTION
1173 ft2 (109 m2)
FIRST FLOOR CONSTRUCTION
1354 ft2 (125.8 m2)
SECOND FLOOR CONSTRUCTION
504 ft2 (46.8 m2)
CONSTRUCTED AREA
3031 ft2 (281.6 m2)
GARAGE
577 ft2 (53.6 m2)
SOLAR AREA
478 ft2 (44.4 m2)
C
MN
BEDROOM 3
2-2'
2-2'
ARCH XX SECTION
ARCH XX SECTION
OWNER:
Big Country Development
DOWN
1-1' ARCH XX SECTION
1-1'
UP
ARCH XX SECTION
DESIGN STUDIO
TALLER 13 PROYECT.
THE GROVE
BEDROOM 1
ADRESS.
ARCH XX SECTION
3-3'
F1
ARCH XX SECTION
Partridge Hollow, Big Sky, MT
4-4'
146
NORTH C
DATE:
01 OCTOBER 2021
SCALE. 1:100
Gr o v e Bi g S k y , M o n t a n a
NORTH
149
LOCATION SITE
GROVE 3 SECTIONS
1-1'
PORCH
1-1
PARKING
SEED STORAGE SEEDLING
STORAGE STRAW SPACE
ADMIN
ENTRY MUDROOM
KITCHEN
BATHROOMS
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX SECTION
GROVE
2
WORK PAVILION
1
2 WORK PAVILION
3 4 7 5
8
6
FIREPIT
GROVE
3
PAVILION
POND
Transition
4
9 10
GROVE
11 12 GROVE 5
Transition
15 14
13
SYMBOLOGY a
SECTION WALL LOW WALL PROJECTION
BATHROOM
CLOSET
BEDROOM 3
GROVE LOCATION Transition
4
GARAGE
7 5
8
6
DINING
LIVING ROOM POND
LIVING ROOM 9
10
OV
GROVE 1
E
4
KITCHEN
GR
148
11 12
Transition
AREAS. SECTION 3-3'
SECTION 1-1'
GROVE 3 AREAS PER HOUSE
BATHROOM
BATHROOM
SOLARIUM
FOOTPRINT
1749 ft2 (162.5m2)
GROUND FLOOR CONSTRUCTION
1173 ft2 (109 m2)
FIRST FLOOR CONSTRUCTION
1354 ft2 (125.8 m2)
SECOND FLOOR CONSTRUCTION
504 ft2 (46.8 m2)
CONSTRUCTED AREA
3031 ft2 (281.6 m2)
GARAGE
577 ft2 (53.6 m2)
SOLAR AREA
478 ft2 (44.4 m2)
CLOSET
01 DET-XX
BEDROOM 2
BATHROOM
BEDROOM 3
BEDROOM 1
BATHROOM
OWNER:
GARAGE GARAGE
DINING
MUDROOM
Big Country Development
LIVING ROOM
DESIGN STUDIO
TALLER 13 PROYECT.
THE GROVE ADRESS.
SECTION 2-2'
SECTION 4-4'
Partridge Hollow, Big Sky, MT DATE:
01 OCTOBER 2021
SCALE. 1:100
Gr o v e Bi g S k y , M o n t a n a
NORTH
150
151
LOCATION SITE
GROVE 3 FACADES
1-1'
PORCH
1-1
PARKING
SEED STORAGE SEEDLING
STORAGE STRAW SPACE
ADMIN
ENTRY MUDROOM
KITCHEN
BATHROOMS
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX SECTION
GROVE
2
WORK PAVILION
1
2 WORK PAVILION
3 4 7 5
8
6
FIREPIT
GROVE
3
PAVILION
POND
Transition
GROVE
10
4
9
11 12 GROVE 5
Transition
15 14
13
SYMBOLOGY a
SECTION WALL LOW WALL PROJECTION
GROVE LOCATION Transition
4 7 5
8
6
POND
OV GR
10
E
4
9 GROVE 1
11 12
Transition
AREAS. WEST FACADE
SOUTH FACADE
GROVE 3 AREAS PER HOUSE FOOTPRINT
1749 ft2 (162.5m2)
GROUND FLOOR CONSTRUCTION
1173 ft2 (109 m2)
FIRST FLOOR CONSTRUCTION
1354 ft2 (125.8 m2)
SECOND FLOOR CONSTRUCTION
504 ft2 (46.8 m2)
CONSTRUCTED AREA
3031 ft2 (281.6 m2)
GARAGE
577 ft2 (53.6 m2)
SOLAR AREA
478 ft2 (44.4 m2)
OWNER:
Big Country Development DESIGN STUDIO
TALLER 13 PROYECT.
EAST FACADE
NORTH FACADE
THE GROVE ADRESS.
Partridge Hollow, Big Sky, MT DATE:
01 OCTOBER 2021
SCALE. 1:100
Gr o v e Bi g S k y , M o n t a n a
3-3'
ARCH XX SECTION
4-4'
ARCH XX SECTION
3-3'
ARCH XX SECTION
ARCH XX SECTION
4-4'
152
NORTH
GROVE 4
153
LOCATION SITE
1-1'
PORCH
1-1
PARKING
SEED STORAGE SEEDLING
STORAGE STRAW SPACE
ADMIN
KITCHEN
ENTRY MUDROOM
BATHROOMS
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX SECTION
GROVE
2
WORK PAVILION
1
2 WORK PAVILION
3 4 7
5
KITCHEN
GROVE
3
POND
Transition
2-2' ARCH XX SECTION
TOILET
OFFICE
2-2'
10
4
9
2-2' ARCH XX SECTION
8
6
FIREPIT
GROVE
PANTRY
PAVILION
11 12 GROVE 5
Transition
15
2-2'
ARCH XX SECTION
14
ARCH XX SECTION
13
SYMBOLOGY a
DOWN
SECTION WALL LOW WALL
DINING
1-1'
1-1'
ARCH XX SECTION
ARCH XX SECTION
LIVING ROOM
1-1'
PROJECTION
1-1'
BEDROOM 4
ARCH XX SECTION
ARCH XX SECTION
MEZZANINE H
ID R
GROVE LOCATION
O M
A
S
A S
J
RA
E
S E
Ñ
A B
DY
H
A T
D L R O G L A S S
UP
C
MN
FIREPLACE
C
11 12
STORAGE
2-2' LAUNDRY
ARCH XX SECTION
3-3'
13
14
ARCH XX SECTION
3-3'
Transition
15
KITCHEN
PANTRY
2-2' ARCH XX SECTION
ARCH XX SECTION
F2
4-4'
ARCH XX SECTION
3-3'
4-4'
ARCH XX SECTION
OPTIONS
GF
ARCH XX SECTION
TOILET
2-2'
AREAS.
2-2'
ARCH XX SECTION
ARCH XX SECTION
GROVE 4 AREAS PER HOUSE
UP
DINING
1-1'
1-1'
ARCH XX SECTION
ARCH XX SECTION
LIVING ROOM
1-1' ARCH XX SECTION
ARCH XX SECTION
MUDROOM A R
H S
ID R
A O M
Ñ
GROUND FLOOR CONSTRUCTION
1259 ft2 (117 m2)
FIRST FLOOR CONSTRUCTION
1615 ft2 (150 m2)
SECOND FLOOR CONSTRUCTION
420 ft2 (39 m2)
CONSTRUCTED AREA
3294 ft2 (306 m2)
GARAGE
624 ft2 (58 m2)
SOLAR AREA
555.6 ft2 (51.62 m2)
JE A
S
E
A
1884 ft2 (175m2)
S
ENTRY
FOOTPRINT 1-1'
Y R
H
B
UP
FIREPLACE
ARCH XX SECTION
3-3'
F3
ARCH XX SECTION
C
ARCH XX SECTION
3-3'
ARCH XX SECTION
C
4-4'
MN
4-4'
L
S
O
G L A S
GF
A T
D
D
0m
1m
3m
WN
BEDROOM 1
OWNER: 2-2'
2-2'
ARCH XX SECTION
Big Country Development
ARCH XX SECTION
OFFICE TV ROOM
SOLARIUM
DESIGN STUDIO
TALLER 13
UP
C
DOWN
1-1'
1-1'
BEDROOM 2 BEDROOM 3
ARCH XX SECTION
MN
PROYECT.
THE GROVE ADRESS.
Partridge Hollow, Big Sky, MT
C
F1
ARCH XX SECTION
3-3'
ARCH XX SECTION
DATE
4-4'
Gr o v e Bi g S k y , M o n t a n a
ARCH XX SECTION
OPTION 1
01 OCTOBER 2021
SCALE. 1:100
NORTH
155
LOCATION SITE
1-1'
PORCH
1-1
PARKING
SEED STORAGE SEEDLING
STORAGE STRAW SPACE
ADMIN
KITCHEN
ENTRY MUDROOM
BATHROOMS
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX SECTION
GROVE
2
WORK PAVILION
1
2 WORK PAVILION
3
4 7
5 8
6
FIREPIT
GROVE
3
PAVILION
POND
Transition
4
9 10
GROVE
154
GROVE 4 SECTIONS
11 12 GROVE 5
Transition
15 14
13
SYMBOLOGY a
SECTION
BEDROOM 3
WALL LOW WALL
MEZZANINE
PROJECTION BATHROOM
BEDROOM 2
BEDROOM 1
BEDROOM 1
MASTER
GROVE LOCATION 11
GARAGE 12
VEG
LIVING ROOM
LIVING ROOM
Transition
15
KITCHEN
13
14
SECTION 1-1'
SECTION 3-3'
AREAS. GROVE 4 AREAS PER HOUSE
BATHROOM
OFFICE
TV ROOM
BATHROOM
FOOTPRINT
1884 ft2 (175m2)
GROUND FLOOR CONSTRUCTION
1259 ft2 (117 m2)
FIRST FLOOR CONSTRUCTION
1615 ft2 (150 m2)
SECOND FLOOR CONSTRUCTION
420 ft2 (39 m2)
CONSTRUCTED AREA
3294 ft2 (306 m2)
GARAGE
624 ft2 (58 m2)
SOLAR AREA
555.6 ft2 (51.62 m2)
OFFICE
MASTER
CLOSET
BEDROOM 1
MASTER
OWNER: GARAGE
LAUNDRY
LAUNDRY TOILET
Big Country Development
STORAGE
DESIGN STUDIO
KITCHEN
TALLER 13 PROYECT.
THE GROVE ADRESS.
SECTION 2-2'
SECTION 4-4'
Partridge Hollow, Big Sky, MT DATE
01 OCTOBER 2021
SCALE. 1:100
Gr o v e Bi g S k y , M o n t a n a
NORTH
157
LOCATION SITE
1-1'
PORCH
1-1
PARKING
SEED STORAGE SEEDLING
STORAGE STRAW SPACE
ADMIN
KITCHEN
ENTRY MUDROOM
BATHROOMS
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX SECTION
GROVE
2
WORK PAVILION
1
2
WORK PAVILION
3 4
7 5 8
6
FIREPIT
GROVE
3
PAVILION
POND
Transition
10
4
9 GROVE
156
GROVE 4 FACADES
11 12 GROVE 5
Transition
15 14
13
SYMBOLOGY a
SECTION WALL LOW WALL PROJECTION
GROVE LOCATION 11 12
Transition
15
13
14
WEST FACADE
SOUTH FACADE
AREAS. GROVE 4 AREAS PER HOUSE FOOTPRINT
1884 ft2 (175m2)
GROUND FLOOR CONSTRUCTION
1259 ft2 (117 m2)
FIRST FLOOR CONSTRUCTION
1615 ft2 (150 m2)
SECOND FLOOR CONSTRUCTION
420 ft2 (39 m2)
CONSTRUCTED AREA
3294 ft2 (306 m2)
GARAGE
624 ft2 (58 m2)
SOLAR AREA
555.6 ft2 (51.62 m2)
OWNER:
Big Country Development DESIGN STUDIO
TALLER 13 PROYECT.
EAST FACADE
NORTH FACADE
THE GROVE ADRESS.
Partridge Hollow, Big Sky, MT DATE
01 OCTOBER 2021
SCALE. 1:100
Gr o v e Bi g S k y , M o n t a n a
NORTH
158
159 LOCATION SITE
BARN 1-1'
PORCH
STORAGE
1-1
PARKING
SEED STORAGE SEEDLING
STRAW SPACE
ENTRY ADMIN
KITCHEN
BATHROOMS
MUDROOM
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX SECTION
GROVE
2
WORK PAVILION
1
2
WORK PAVILION
3 4
7 3
5 8
6
FIREPIT
GROVE
PAVILION
POND
Transition
GROVE
4
9 10 11 12 GROVE 5
Transition
15 14
2-2'
ARCH XX
SECTION
2-2'
ARCH XX
SECTION
SYMBOLOGY a
A
A'
B
C
D
E
F
MULTIPURPOSE SPACE
A
13
A'
B
C
D
E
SECTION WALL
F
LOW WALL
OPTION 1
PROJECTION
01
01
02
GROVE LOCATION
02 SEED STORAGE SEEDLING
OFFICE
BATHROOMS
03
03
UP
OPTIONS
1-1'
1-1'
ARCH XX
ARCH XX
SECTION
SECTION
1-1'
1-1'
ARCH XX
ARCH XX
SECTION
SECTION
ENTRY
ENTRY
FREE SPACE
04
04
ENTRY
05
05 2-2'
SECTION
ARCH XX
2-2'
SECTION
ARCH XX
AREAS. BARN
F3
GF
FOOTPRINT
2-2'
ARCH XX
SECTION
A
A'
B
C
D
E
F
2010 ft2 (187m2)
GROUND FLOOR AREA
2010 ft2 (187 m2)
MEZANNINE AREA
808 ft2 (75 m2)
CONSTRUCTED AREA
2818 ft2 (262 m2)
SOLAR AREA
574 ft2 (53.3 m2)
01 02
KITCHEN COWORK
MULTIPURPOSE SPACE
DOWN
03
OWNER: UP
1-1' ARCH XX
1-1' ARCH XX
SECTION
SECTION
Big Country Development DESIGN STUDIO
TALLER 13
04
PROYECT.
05
THE GROVE 2-2'
SECTION
ARCH XX
ADRESS.
MEZZANINE
Partridge Hollow, Big Sky, MT DATE
JULY / 2021
SCALE. 1:100
Gr o v e Bi g S k y , M o n t a n a
NORTH
LOCATION SITE
160
161 1-1'
PORCH
STORAGE
1-1
PARKING
SEED STORAGE SEEDLING
STRAW SPACE
ENTRY ADMIN
KITCHEN
BATHROOMS
MUDROOM
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX SECTION
GROVE
2
WORK PAVILION
1
2 WORK PAVILION
3 4
7 3
5 8
6
FIREPIT
GROVE
PAVILION
POND
Transition
E
GROV
10
4
9
11
FACADES
12 GROVE 5
Transition
15 14
13
SYMBOLOGY a
SECTION WALL LOW WALL PROJECTION
GROVE LOCATION
SOUTH FACADE
EAST FACADE
AREAS. BARN
FOOTPRINT
NORTH FACADE
2010 ft2 (187m2)
GROUND FLOOR AREA
2010 ft2 (187 m2)
MEZANNINE AREA
808 ft2 (75 m2)
CONSTRUCTED AREA
2818 ft2 (262 m2)
SOLAR AREA
574 ft2 (53.3 m2)
WEST FACADE
OWNER:
Big Country Development DESIGN STUDIO
TALLER 13 PROYECT.
THE GROVE ADRESS.
Partridge Hollow, Big Sky, MT DATE
JULY / 2021
SCALE. 1:100
Gr o v e Bi g S k y , M o n t a n a
NORTH
162
163
LOCATION SITE
SECTIONS 1-1'
PORCH
STORAGE
1-1
PARKING
SEED STORAGE SEEDLING
STRAW SPACE
ENTRY ADMIN
KITCHEN
BATHROOMS
MUDROOM
GROVE 1
FREE SPACE
ARCH XX SECTION
ARCH XX SECTION
GROVE
2
WORK PAVILION
1
2 WORK PAVILION
3 4
7 3
5 8
6
FIREPIT
GROVE
PAVILION
POND
Transition
GROVE
4
9 10 11 12 GROVE 5
Transition
15 14
A
B
C
D
E
F
13
SYMBOLOGY a
SECTION WALL LOW WALL PROJECTION
GROVE LOCATION
SECTION 1-1'
AREAS. BARN
FOOTPRINT
01
02
04
05
2010 ft2 (187m2)
GROUND FLOOR AREA
2010 ft2 (187 m2)
MEZANNINE AREA
808 ft2 (75 m2)
CONSTRUCTED AREA
2818 ft2 (262 m2)
SOLAR AREA
574 ft2 (53.3 m2)
OWNER:
SECTION 2-2'
Big Country Development DESIGN STUDIO
TALLER 13 PROYECT.
THE GROVE ADRESS.
Partridge Hollow, Big Sky, MT DATE
JULY / 2021
SCALE. 1:100
Gr o v e Bi g S k y , M o n t a n a
164
165
Gr o v e Bi g S k y , M o n t a n a
G
R
O
V
E