Grove, Big Sky

Page 1

G

R

O

V

E



G

R

O

Big Sky, Montana.

Credits Big Sky

Brooks Tyrrell. BCD

Tucker Tyrrell. Remedium

Cole Robertson. PLUM

James Connolly. Hyalite Engineers

Zachary Weiss. Elemental Ecosystems

Jeremy Henrichon BCD

Nick Tenney. Holo Film

Taller 13

Elias Cattan

Federico de Antuñano

Sharon Salamanca

Gustavo Iturbe

Daniel Ibarra BDA MX

V

E


Contents 09

Presentation

11

Definition

13

Story of Big Sky

Geology and Hydrology

Biology

Astronomical Alignments

Urban Analysis

National Parks

39

Design

Concept

Master Plan

Plot One

71

Energy performance

Four Ecologies

Five Capitals

Parameters 83

Gr o v e Bi g S k y , M o n t a n a

Set of plans


Presentation 8

Firstly, We would like to acknowledge and honor the land we plan to build the community of Grove with. It is home and habitat for magnificent old growth Firs and Pines, Ravens, Elk, Fungi, Geraniums, Whitetail Deer, Soils and so much more. We thank and ask the land for people to join this natural community and call it Home. We also acknowledge the disturbance this project can cause to the land. We aim to minimize and offset this disturbance by designing something that has a positive impact on the land, families, and community. We hope this project can be an exemplary starting point for a shift in how development is done and a challenge to conventional development to positively impact the greater community, ecosystem, and families whom will call it home. This challenge continues to inspire the creation of Grove. With Appreciation,

Gr o v e Bi g S k y , M o n t a n a

9


Definition 10

¿What is Grove? -A community that preserves and restores the natural ecosystem while introducing optimal living for both the human and non-human.

For a paradigmatic shift with a regenerative future and thriving forests we must look for the recognition of our elders and their knowledge.

-Twentyfive acres of biodiverse land with a well balanced flow of plant and wildlife that allows the harmonious coexistence between natural living ecosystems. -Fifteen living-building homes that recycle water, produce energy and share communal pathways and roads. These homes encircle a restored central wetland (pond) that services the greater habitat. -One Seed Barn that creates biodynamic space for co-work and co-creation, family gatherings, social impact events and a greenhouse for food growth. The barn will be beneficial impact for the watershed it belongs to.

Value: Empawering Interconnected Biodiversity

Process: Enabling Participatory Community

Essence triad* Purpuse : Pioneering Regenerative Stewardship ®Regenesis Group regenesisgroup.com Gr o v e Bi g S k y , M o n t a n a

-Seed Grove looks to honor the Earth that provides all that we need by building a community that harmoniously lives, actively restores, and passionately stewards the land on which it will reside.

11


Story of Big Sky 12

Every place is unique and has its own story to tell and in order to live harmoniously with it, we must learn to listen. From Geology to Urban Analysis, every piece of information can be transformed into principles of design. This place is a beautiful open canvas, a space that is primed for optimal living with dynamic people to flourish in a way they see fit. Being aware of its own Story will enable stewards to be creative within it.

Gr o v e Bi g S k y , M o n t a n a

13


Geology and Hydrology 15

Gr o v e Bi g S k y , M o n t a n a


16

17

Gr o v e Bi g S k y , M o n t a n a


18

19

Gr o v e Bi g S k y , M o n t a n a


Gr o v e Bi g S k y , M o n t a n a


Biology

The Gallatin Watershed is part of the Greater Yellowstone Ecosystem, which is home to the largest concentration of mammals in the lower 48 states. In addition to having a diversity of small animals, the National Park of Yellowstone is notable for its predator–prey complex of large mammals, including eight ungulate species (bighorn sheep, bison, elk, moose, mountain goats, mule deer, pronghorn, and white-tailed deer) and seven large predators (black bears, Canada lynx, coyotes, grizzly bears, mountain lions, wolverines, and wolves).

22

Subalpine fir

Lodgepole pine

Douglas fir

Shrub community

Princess pine

Twin flower

Spirea

Sagebrush

23

Buffalo berrie

Reed grass

Sedges

Upland Soil: Varied geologic rock types consisting of gneiss, limestone, shale, sandstone and volcanic rocks, covered with a thin mantle of soil.

Rushes

More than 6 Feet to Water Table Soil: Moderately fine and fine textured loess (wind desposited) and alluvial soils.

Snowberry

Black cottonwood

More than 6 Feet to Water Table Soil: Medium to moderately fine-textured alluvial soils varying in depth over sand and gravels.

Less than 6 Feet to Water Table

Gallatin River Source: Gallatin Watershed Sourcebook

Records of bird sightings have been kept in Yellowstone since its establishment in 1872. These records document nearly 300 species of birds to date, including raptors, songbirds, shorebirds, and waterfowl. The variation in elevation and broad array of habitat types found within Yellowstone contribute to the relatively high diversity. Many of the birds are migratory species. Reptiles are less studied than amphibians in Yellowstone. There are 6 confrmed species: bullsnake, prairie rattlesnake, rubber boa, sagebrush lizard, common garter snake and terrestrial garter snake. And 5 species of amphibians: Western tiger salamander, boreal chorus frog, Western toad, Columbia spotted frog, and plains spadefoot toad.

Source: National Park Service/Yellowstone

Gr o v e Bi g S k y , M o n t a n a


Settlements

Gr o v e Bi g S k y , M o n t a n a

25


26

27

Gr o v e Bi g S k y , M o n t a n a


Lone Mountain

Wilson Peak

Hyalite Peak

Astronomical Alignments 28

Pioneer Mountain

Levinsky Ridge

Cinnamon Mountain

Sage Peak

Ulerys Lake

Lake Levinski

Hidden Lake

Ennis Lake

Hebgen Lake

Gr o v e Bi g S k y , M o n t a n a

29


Levinsky Ridge

30

31 Gallatin River

Michener Creek

SUN PATH DIAGRAM

SUNRISE, SUNSET, DAWN AND DUSK TIMES GRAPH Gr o v e Bi g S k y , M o n t a n a


Urban Analysis 32

33

Gr o v e Bi g S k y , M o n t a n a


United States Main Watersheds

National Parks 34

The United States has 63 protected areas designated and known as national parks that are operated by the National Park Service, an agency of the Department of the Interior. National parks must be established by an act of the United States Congress.

35

National parks are designated for their natural beauty, unique geological features, diverse ecosystems, and recreational opportunities. National monuments, on the other hand, are frequently chosen for their historical or archaeological significance. While legislatively all units of the National Park System are considered equal with the same mission, national parks are generally larger and more of a destination, and hunting and extractive activities are prohibited. Montana lists 8 out of 63 National Parks and its imperative to be aware of the relevance they have in the sorrounding ecosystem.

Gr o v e Bi g S k y , M o n t a n a

United States National Parks


36

GLACIER NATIONAL PARK

LEWIS & CLARK.

Crown of the Continent. Glacier’s pristine forests, alpine meadows, rugged mountains, and spectacular lakes are a great experience. With over 700 miles of trails, Glacier is a hiker’s paradise for adventurous visitors seeking wilderness and solitude.

The Lewis and Clark National Historic Trail is approximately 4,900 miles long, extending from Pittsburgh, Pennsylvania, to the mouth of the Columbia River, near present day Astoria, Oregon. It follows the historic outbound and inbound routes of the Lewis and Clark Expedition as well as the preparatory section from Pittsburgh, Pennsylvania to Wood River, Illinois.

YELLOWSTONE NATIONAL PARK On March 1, 1872, Yellowstone became the first national park for all to enjoy the unique hydrothermal and geologic wonders. In the depths of winter, the hot springs of Yellowstone appear as colorful jewels amongst the snow.

BIGHORN CANYON. National Recreation Area The vast, wild landscape of Bighorn Canyon National Recreation Area offers visitors unparalleled opportunities to immerse themselves in the natural world, and experience the wonders of this extraordinary place. With over 120,000 acres, one can find an astounding diversity in ecosystems, wildlife, and more than 10,000 years of human history to explore.

BIG HOLE NATIONAL BATTLEFIELD On August 9, 1877 gun shots shattered a chilly dawn on a sleeping camp of Nez Perce. By the time the smoke cleared on August 10, almost 90 Nez Perce were dead along with 31 soldiers and volunteers. Big Hole National Battlefield was created to honor all who were there.

Gr o v e Bi g S k y , M o n t a n a

National Historic Trail

GRANT-KOHRS RANCH. National historic site

Wide open spaces, the hardworking cowboy, his spirited cow pony, and vast herds of cattle are among the strongest symbols of the American West. Grant-Kohrs Ranch National Historic Site preserves these symbols and commemorates the role of cattlemen in American history.

NEZ PERCE.

National historical park Since time immemorial, the valleys, prairies, mountains, and plateaus of the inland northwest have been home to the Nimiipuu (Nez Perce) people. Extremely resilient, they survived the settling of the United States and adapted to a changed world. Nez Perce National Historical Park consists of 38 places important to the history and culture of the Nimiipuu.

LITTLE BIGHORN BATTLEFIELD. National monument

This area memorializes the US Army’s 7th Cavalry and the Lakotas and Cheyennes in one of the Indian’s last armed efforts to preserve their way of life. Here on June 25 and 26 of 1876, 263 soldiers, including Lt. Col. George A. Custer and attached personnel of the US Army, died fighting several thousand Lakota and Cheyenne warriors.

Source: National Park Service


Integrated Design Process

38

Like every other process, design takes time and gets influenced by every person involved in it. The multifactorial nature of a project like this is always a challenge but in the end, is also its greatest strength. This series of back and forward iterations that we call Integrated Design Process (IDP) assembles a larger number of specialists in different and yet complementary subjects to define, evolve and refine every aspect of the global design. Despite the physical distance between the team members, work has been enhanced in digital environments in which collaboration is perfectly feasible.

Gr o v e Bi g S k y , M o n t a n a

39


Preliminaries: Data Collection It is never too much information. Every piece can lead to discovery and later become a strategy or design principle.

40

41

In this stage, general information as location, extension, restrictions, previous work and the current state of the land is processed and arranged in a legible way.

20'x20' SERVICE VEHICLE TURN AROUND MARKED AS "NO PARKING"

FOUR (4) PARKING SPACES

UPPER SHARED DRIVEWAY

' 20 E V PA

EXTEND FOR END UNIT BACK-OUT TURN-AROUND

' 24 E V PA

ER

S

ES

C

AC

LEVEL BUILDING PAD NOT POSSIBLE ON FIRST FOUR (4) LOTS

D

O

RA

W

LO

TURN-AROUND PER FIRE CODE

HORIZONTAL DESIGN DATA UPPER SHARED DRIVEWAY

· · · · ·

M:\182913\Drawings\C3D-ROAD-MP.dwg

PARTIAL BURRY 1ST FLOOR REQUIRED

Gr o v e Bi g S k y , M o n t a n a

MINIMUM HORIZONTAL CURVE RADIUS: 60' (RADIUS IS 60' AS DESIGNED) MAX LENGTH WITHOUT TURNAROUND: 300' (DESIGN LENGTH IS 260') MAX. DISTANCE FROM INTERSECTION: 75' (100' SEPARATION AS DESIGNED) ANGLE TO MAIN ROAD: 70-90 DEGREES (DESIGN IS 80 DEGREES AS DRAWN) MINIMUM TOTAL WIDTH: 12'

LOWER ROADWAY PER GALLATIN COUNTY ROADWAY STANDARDS. NO DEVIATION REQUESTED.

DATE :

2304 NORTH 7TH AVENUE STE. L P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1

WEB:

BOZEMAN, MT 59718 FAX: (406) 522-9225

www.hyaliteeng . com

CONCEPTUAL SITE PLAN BIG SKY, MT

SCALE :

10/10/2018 1" = 80'

JOB NUMBER : 182913 0

Feet

80

SHEET :

1 OF 1


Conceptual: Work Shaping. 42

After data collection, conceptualization becomes the most important aspect of design. This stage provides cohesion and a set of guidelines regarding the scope of work and the desired outcome where concepts is shaped in collaborative sessions. The most important aspects in this stage is the bifurcation of design subjects, although masterplan is still the main focus, housing units take their own relevance and design exploration starts.

Gr o v e Bi g S k y , M o n t a n a

43


Schematic: General Layout 44

It is never too much information. Every piece can become a strategy or design principle. In this stage, general information as location, extension, restrictions, previous work and the current state of the land is processed and arranged in a legible way.

Gr o v e Bi g S k y , M o n t a n a

45


46

47

Gr o v e Bi g S k y , M o n t a n a


48

49

Gr o v e Bi g S k y , M o n t a n a


Architectonic: Concept as a form 50

After numerous iterations, masterplan and housing units derive in a architectonic scale. Roofs, windows, materials and most important of all, interaction between them. This last stage before drawing construction documents is, perhaps, the most intense regarding collaborative work.

Gr o v e Bi g S k y , M o n t a n a

51


1. HONEY

2. CHOCOLATE

3. GRAY

4. DARK GRAY

BODY

BASEMENT

52

53 GROVE 1

GROVE 2

GROVE 3

GROVE 4

SOUTH FACADES

NORTH FACADES

Gr o v e Bi g S k y , M o n t a n a


Wetland restoration 54

Conceptually, wetland restoration was always the main topic in masterplan design. Since very early schemes, potential arrangements revolved around optimal hydrological performances. Natural water flow and projected water cycles were primary subjects to design and for early construction work on site.

Gr o v e Bi g S k y , M o n t a n a

55


56

57

Gr o v e Bi g S k y , M o n t a n a


58

59

Gr o v e Bi g S k y , M o n t a n a


60

61

Gr o v e Bi g S k y , M o n t a n a


Energy performance By Daniel Ibarra

62

Preliminary environmental considerations synthesis. The historic weather data was analyzed using the Bozeman Yellowstone Int. Ap. located 36 miles from Big Sky in order to establish the environmental design goals. During 2/3 of the year, the climate is too harsh to suggest any passive means to achieve comfort, during this period the design will aim to reduce the heating loads, focusing on energy efficiency and during the moderate and warm period during summer, the design will aim to achieve thermal comfort by passive means. The main strategies suggested after a rst round of parametric studies, were to procure south and west orientations to beneffit from the solar heat gains. An ideal window to wall ratio (WWR) was suggested for each orientation. Double glassing for all the orientation should be applied into the construction set adding up, air tightness and high insulation. High insulation can be achieved by many means; the design team chose thatch walls for some of the facades which has proven to be a thermal and sustainable material. Thermal Mass strategically placed in the interior can help to retain heat gains during winter and fresh up during summer, in combination with a proper natural ventilation strategy. A solarium was integrated into the upper floor linking the staircase, this guarantees even heat distribution during winter, and during summer it will function as a chimney exploiting the 37 stack effect During the future design stages, the environmental design team will evaluate the impact on thermal comfort and energy performance of specific design features, assisting the design to achieve our sustainability goals.

Gr o v e Bi g S k y , M o n t a n a

63


64

65

Gr o v e Bi g S k y , M o n t a n a


Five Capitals* 66

67

®Regenesis Group regenesisgroup.com Gr o v e Bi g S k y , M o n t a n a


Parameters 68

69

Gr o v e Bi g S k y , M o n t a n a



72

73

Concept

Mimicking the way tree groves are a small unit that reflects and improve the nature around the place, we want to create house groves that associate with nature and enhance its ecosystem by honoring and merging into the natural energetic flow.

A legacy of prehistoric traditions of nature conservation, sacred groves are patches of forest that rural communities in the developing world protect and revere as sacrosanct. Deeply held spiritual beliefs ensure that not a tree is felled no a creature harmed within its boundaries. Treasure troves for naturalists, the groves often serve as the last refuge for magnificent and ancient trees, as well as for species of lianas, medicinal plants, macaques, deer, birds, lizards, frogs and other creatures that have become rare elsewhere in the landscape. -Madhav Gadgil Gr o v e Bi g S k y , M o n t a n a

In this natural landscape, the wetlands are the very centre of these homes and, just like branches of a tree, each one of them is interconnected by water in a harmonious way.


Master Plan

74

75

Gr o v e Bi g S k y , M o n t a n a


76

77

Gr o v e Bi g S k y , M o n t a n a


Gr o v e Bi g S k y , M o n t a n a


Lot One 80

81

Gr o v e Bi g S k y , M o n t a n a


Grove 1 82

83 Basement

First Floor

Ground Floor

Roof

Gr o v e Bi g S k y , M o n t a n a


84

85 Section

Gr o v e Bi g S k y , M o n t a n a


86

87

Gr o v e Bi g S k y , M o n t a n a


Grove 2 88

89 Basement

First Floor

Ground Floor

Roof

Gr o v e Bi g S k y , M o n t a n a


90

91 Section

Gr o v e Bi g S k y , M o n t a n a


92

93

Gr o v e Bi g S k y , M o n t a n a


Grove 3 94

95 Basement

First Floor

Ground Floor

Second Floor

Gr o v e Bi g S k y , M o n t a n a


96

97 Section

Roof

Gr o v e Bi g S k y , M o n t a n a


98

99

Gr o v e Bi g S k y , M o n t a n a


100

101

Gr o v e Bi g S k y , M o n t a n a


Grove 4 102

103 Basement

First Floor

Ground Floor

Second Floor

Gr o v e Bi g S k y , M o n t a n a


104

105 Section

Roof

Gr o v e Bi g S k y , M o n t a n a


106

107

Gr o v e Bi g S k y , M o n t a n a


108

109

Gr o v e Bi g S k y , M o n t a n a


Particular ways of inhabiting these houses are possible thanks to a flexible room that has been designed to meet a large number of different dynamics inside the house. Families can adjust solariums to their specific needs. One can choose between an extra bedroom and a perfectly lighted workspace or between a tv room and a greenhouse.

Solarium 110

111

Gr o v e Bi g S k y , M o n t a n a

Option 1

Option 3

Option 2

Option 4


112

113

Gr o v e Bi g S k y , M o n t a n a


Barn 114

Ground Floor

First Floor

Gr o v e Bi g S k y , M o n t a n a

Roof Plan

115


116

117 Section

Gr o v e Bi g S k y , M o n t a n a


118

119

Gr o v e Bi g S k y , M o n t a n a


120

121

Gr o v e Bi g S k y , M o n t a n a


122

123

Gr o v e Bi g S k y , M o n t a n a


Set of plans 124

125

Gr o v e Bi g S k y , M o n t a n a


Site Plan Ground Floor SITE PLAN GROUND FLOOR

NORTH

LOCATION SITE

1-1'

PORCH

1-1

PARKING

STORAGE SEED SEEDLING

STORAGE STRAW SPACE

ADMIN

ENTRY MUDROOM

BATHROOMS KITCHEN

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX 2

WORK PAVILION

GROVE

SECTION

1

2 WORK PAVILION

3 4

7

3

5 8

6

FIREPIT

GROVE

PAVILION

POND

Transition

10

GROVE

4

9

11 12 GROVE 5

Transition

15 14

13

SYMBOLOGY A'

A

F

E

D

C

B

a

SECTION WALL

SEED STORAGE SEEDLING

LOW WALL

OFFICE

BATHROOMS UP

OPTIONS

PROJECTION

GROVE 1

ENTRY ENTRY

FREE SPACE

ENTRY

D A OL

H

2-2'

SECTION

ARCH XX

AREAS.

A

S G T L Y D R

S A L T D

Y D R O H G

2

3229 ft2 (300m2)

CONSTRUCTED AREA

6871.7 ft2 (638.4 m2)

UP

GR OV

MUDROOM

MUDROOM

ENTRY

ENTRY

LA

UN

DR

Y

BU

NK RO TVR OM OO / M

1

2

MU

DR OO

M

UP Y

RD

H

G D T A L S

EN

TRY

GROVE 2

STO

RA

GA

GE

RA

GE

MN

3

LA

UN

DR

Y

BU

NK RO TVR OM OO M

FOOTPRINT

UP

MN

O

WORK PAVILION

BEDROOM 4

STORAGE LAUNDRY

BEDROOM 4

STORAGE LAUNDRY

E

MN

BEDROOM

OFFICE TV ROOM

MN

BEDROOM

OFFICE TV ROOM

WORK PAVILION

GROVE 1

/

MU

FOOTPRINT

5683.3 ft2 (528m2)

CONSTRUCTED AREA

13,153.5 ft2 (1222 m2)

DR

OO

M

UP A Y D R

GH

O

D

T A L S

EN

TRY

Transition

STO

RA

GA

GE

RA

GE

4

MN

LA

UN

DR

Y

7

BU

NK RO TVR OM OO

M

/ MU

DR

OO

M

UP T S

L

D A

A

GROVE 3

L

Y D R O H G

EN

5

TRY

STO

RA

GA

GE

RA

GE

MN

FOOTPRINT

10,494.8 ft2 (975m2)

CONSTRUCTED AREA

18,186.7 ft2 (1689.6 m2)

LA

UN

DR

Y

DIN

UP

ING

FIRE PLAC

BU

E

NK RO TVR OM OO

M

/

MU

DR

D T A L

OO

M

UP

TO

ING

T

RD

T D A L S

SG Y D R O S A L

LIV

ILE

H Y

G L O

H

PAVILION

RO

OM

PA

NTR

Y

EN

TRY

KIT

CH

EN

STO

RA

GA

GE

RA

GE

LOT 4 1.02 AC

LOT 1 8.34 AC

6

GROVE 4

8

DIN

UP

ING

FIRE

PLAC E

A L S D T

FOOTPRINT

5651 ft2 (525m2)

CONSTRUCTED AREA

9881.3 ft2 (918 m2)

A L SO G D R

H Y

TO

LIV

ILE

ING

T

RO

OM

PA

NTR

Y KIT

CH

EN

WETLAND

FIREPIT

BARN FOOTPRINT

9 DIN

CONSTRUCTED AREA

UP

ING

FIRE

PLA CE

D

L A T

S A L

GH

Y D R O

TO

LIV

ING

T

RO

3

ILE

OM

PA

NTR

KIT

CH

DIN

GR

OV

EN

E

Y

10 UP

ING

2010 ft2 (186.8m2) 3444 ft2 (320 m2)

PAVILIONS FOOTPRINT

807 ft2 (75m2)

CONSTRUCTED AREA

807 ft2 (75m2)

FIRE

PLA

CE

11

G T A L S D R

Y

HL

TO

LIV

ILE

ING

T

RO

OM

PA

NTR

Y

O

KIT

CH

EN

DIN

UP

ING

FIRE

PLA

CE

S A L TG

O

A D

Y D R H

TO

LIV

ILET

ING

NTR

Y

KIT

CH

EN

DIN

UP

ING

RO

OM

PA

12

OWNER:

Big Country Development

FIRE

PLA

CE

TO

LIV

ILE

ING

T

Transition

13 14 TOIL

TRY

PAN

ET

M

HEN

ROO

KITC

UP

NG

LIVI L

M

HEN

ROO

KITC

NG

LIVI C

ING DIN

ET

LACE

FIREP

TRY

PAN

TOIL

M ROO

HEN KITC

UP

NG

LIVI D

KIT

CH

EN

LG Y D R O S A L

DESIGN STUDIO

TALLER 13 THE GROVE

LACE FIREP

ET

Y D R H G

D T A L S

A

Y

ING DIN

C

TRY

PAN

TOIL

UP

O

Y R H

NTR

PROYECT.

15

G D T O S A L

RO

OM

PA

H

D T A

GROVE 4

ADRESS.

C

ING DIN

LACE

FIREP

Partridge Hollow, Big Sky, MT

A

D R O YG L H

S

D T A L

DATE: 01 OCTOBER 2021 SCALE. 1:2000

Gr o v e Bi g S k y , M o n t a n a


SITE PLAN FIRST FLOOR

NORTH

LOCATION SITE

1-1'

PORCH

1-1

PARKING

SEED STORAGE

STORAGE

SEEDLING

STRAW SPACE

ADMIN

MUDROOM ENTRY

KITCHEN

BATHROOMS

GROVE 1

FREE SPACE

ARCH XX

SECTION

ARCH XX SECTION

GROVE

2

WORK PAVILION

1

2 WORK PAVILION

3 4 7 5 8

6

FIREPIT

GROVE

3

PAVILION

POND

Transition

GROVE

10

4

9

11 12 GROVE 5

Transition

15 14

13

2-2'

ARCH XX

SECTION

SYMBOLOGY F

E

D

C

B

A'

A

a

SECTION WALL

KITCHEN

LOW WALL

MULTIPURPOSE SPACE

COWORK

DOWN

PROJECTION

UP

GROVE 1

2-2'

SECTION

ARCH XX

AREAS. BEDROOM 2

BEDROOM 3

BEDROOM 2

BEDROOM 3

PANTRY

UP

PANTRY

UP

OV E

DOWN

2

DOWN

TOILET

MN

TOILET

MN

WORK PAVILION

GROVE 1 FOOTPRINT

3229 ft2 (300m2)

CONSTRUCTED AREA

6871.7 ft2 (638.4 m2)

FIREPLACE

FIREPLACE

GR

KIT

CH

EN

2

PA

NTR

Y

DIN

ING

TO

ILE

T

SO

LA

DOWN

1

KITCHEN

DINING

LIVING ROOM

KITCHEN

DINING

LIVING ROOM

MN

RIU

M

GROVE 2

UP

LIV

ING

WORK PAVILION

RO

OM

C

FIREP

LAC

E

3

MN

KIT

CH

EN

FOOTPRINT

5683.3 ft2 (528m2)

CONSTRUCTED AREA

13,153.5 ft2 (1222 m2)

PA

NTR

Y

DIN

TO

ING

ILE

T

SO

LA

DOWN

RIU

M

Transition

UP

LIV

ING

RO

OM

C

4

FIREP

LAC

E

MN

KIT

GROVE 3

CH

EN

PA

NTR

Y

DIN

TO

ING

ILE

T

SO

LA

DOWN

7

RIU

M

UP

LIV

ING

OM

C

MN

TRY

MU

DR OO

CONSTRUCTED AREA

18,186.7 ft2 (1689.6 m2)

CE

5

EN

PA

NTR

Y

DIN

ING UP

FIREP

LAC

E

UP

CH

LA

UN

DR

Y

DIN

TO

ING

ILE

ING

SO

LAR

STO

IUM

GE

KIT

CH

RO

FIREP

LAC

E

TRY

MU

DR

GROVE 4

MN

6

EN

EN

8

OM

LOT 1 8.34 AC

RO

OM

RA

UP

LIV

ING

C

LIV

T

C

10,494.8 ft2 (975m2)

PLA

DOWN

LOT 4 1.02 AC

FOOTPRINT M

FIRE

KIT

PAVILION

EN

MN

RO

OO

M

DIN

ING UP

FIRE

PLA

CE

C

FOOTPRINT

5651 ft2 (525m2)

CONSTRUCTED AREA

9881.3 ft2 (918 m2)

UP

LAU

ND

RY

LIV

ING

STO

GE

KIT

CH

WETLAND

FIREPIT

RO

OM

RA

EN

BARN FOOTPRINT

EN

TRY

9

MN

MU

DR

OO

M

DIN

CONSTRUCTED AREA

ING UP

FIREP

LAC

E

C

UP

LA

UN

DR

Y

LIV

KIT

CH

EN

MU

MN

DR

OO

GR

M

OV

GE

E

OM

RA

TRY

10

RO

3

ING

STO

EN

DIN

ING UP

2010 ft2 (186.8m2) 3444 ft2 (320 m2)

PAVILIONS FOOTPRINT

807 ft2 (75m2)

CONSTRUCTED AREA

807 ft2 (75m2)

FIRE

PLA

CE

C

UP

LAU

ND

EN

RY

TRY

11

LIV

ING

STO

RO

OM

RA

GE

MN

MU

DR

OO

M KIT

CH

EN

DIN

ING UP

FIRE

PLAC E C

UP

LA

UN

EN

DR

TRY

Y

LIV

ING

STO

GE

DR

OO

M KIT

CH

EN

DIN

ING UP

RO

OM

RA

MU

MN

12

OWNER:

Big Country Development

FIREP

LAC

E

C

UP

LA

UN

DR

Y

GROVE 4

LIV

ING

STO

Transition

13

KIT

CH

EN

DESIGN STUDIO

TALLER 13 PROYECT.

E RAG

M ROO

STO

MUD UP

LAU NDR

MN

Y

ENT RY

ET

TRY

TOIL

PAN

15

GE

Y

ENTR

14

RO

OM

RA

E

RAG

OM

STO

DRO

HEN KITC

ING

DIN

UP

MU UP

NG

C

NDR

LIVI

LAU

MN

Y

ENT

M

ACE FIREPL

ROO

ET

TRY

TOIL

PAN

RY

HEN

M

RAG

ROO

STO

KITC

ING DIN

UP

MUD

E

L

H G Y D R O

T L S A D

Y

NG

C

NDR

MN

LIVI

LAU

UP

ACE

M

ROO

TRY

ET

FIREPL

PAN

TOIL

UP

KITC

ING

DIN

HEN T Y R O S A L H G D

THE GROVE ADRESS.

C LACE

M

FIREP

G ROO

LIVIN

Partridge Hollow, Big Sky, MT

T Y R O S A L H G D

DATE: 01 OCTOBER 2021 SCALE. 1:2000

Gr o v e Bi g S k y , M o n t a n a


SITE PLAN SECOND FLOOR

NORTH

LOCATION SITE

1-1'

PORCH

1-1

PARKING

STORAGE SEED SEEDLING

STORAGE STRAW SPACE

ADMIN

ENTRY MUDROOM

BATHROOMS KITCHEN

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX 2

WORK PAVILION

GROVE

SECTION

1

2 WORK PAVILION

3 4

7

3

5 8

6

FIREPIT

GROVE

PAVILION

POND

Transition

10

GROVE

4

9

11 12 GROVE 5

Transition

15 14

13

SYMBOLOGY F

E

D

C

B

A'

A

a

SECTION WALL LOW WALL PROJECTION

GROVE 1 2-2'

SECTION

ARCH XX

AREAS. BEDROOM 1

BEDROOM 1 DOWN

2

WORK PAVILION

GROVE 1 3229 ft2 (300m2)

CONSTRUCTED AREA

6871.7 ft2 (638.4 m2)

C

GR OV

C

E

DOWN

FOOTPRINT SOLARIUM

SOLARIUM

MN

BED

OM

FIRE

PLA CE

2

1

2

DOWN

RO

BED

RO

OM

1

BED

GROVE 2

RO

OM

WORK PAVILION

3

C

3

MN

BED

FOOTPRINT

5683.3 ft2 (528m2)

CONSTRUCTED AREA

13,153.5 ft2 (1222 m2)

DOWN

RO

OM

FIRE

PLA

2

CE

BED

RO

OM

1

Transition

BED

RO

OM

3

C

4

MN

7

BED

OM

FIRE

PLA

2

CE

BED

BED

OM

1

RO

OM

OM

2

RO

OM

3

18,186.7 ft2 (1689.6 m2)

RO

OM

PLA

CE

BED

RO

OM

8

6

1

BED

RO

OM

CONSTRUCTED AREA

BED

DOWN

BED FIRE

2

10,494.8 ft2 (975m2)

C

DOWN

RO

FOOTPRINT MN

UP

BED

OM

LOT 4 1.02 AC

3

C

MN

RO

5

RO

BED

PAVILION

GROVE 3

DOWN

RO

3

C

LOT 1 8.34 AC

1

BED

RO

OM

2

GROVE 4

MN

C

BED

RO

UP

OM

DOWN

3

FOOTPRINT

5651 ft2 (525m2)

CONSTRUCTED AREA

9881.3 ft2 (918 m2)

BED

RO

OM

1

WETLAND

FIREPIT

BARN BED

FOOTPRINT

RO

OM

2

9

MN

C

CONSTRUCTED AREA

BED

RO

UP

OM

3

DOWN

OV

2

MN

GR

10

1

E

OM

RO

OM

3

BED RO

BED

C

2010 ft2 (186.8m2) 3444 ft2 (320 m2)

PAVILIONS FOOTPRINT

807 ft2 (75m2)

CONSTRUCTED AREA

807 ft2 (75m2)

BED

RO

UP

OM

3

DOWN

11

BED

RO

OM

2

BED

RO

OM

MN

1

C

BED

RO

UP

OM

DOWN

12

BED

RO

OM

2

BED

RO

OM

1

3

OWNER:

Big Country Development

MN

C

BED

RO

UP

OM

3

DOWN

GROVE 4

BED

RO

OM

Transition M

BED

ICE

OFF ROO TV

13 M2

ROO UP

M

BED

ICE

TALLER 13

M1

ROO

UP

BED

M2

MN

ROO

15

DESIGN STUDIO

PROYECT.

OFF ROO TV

14

1

C

DOWN

BED ROO

M

BED

ICE

M3

OFF ROO TV

M1

ROO

UP

BED

M2

MN

ROO

THE GROVE

C

DOWN

BED ROO M3

MN BED M1

ROO

ADRESS.

C

DOWN

BED ROO M3

Partridge Hollow, Big Sky, MT DATE: 01 OCTOBER 2021 SCALE. 1:2000

Gr o v e Bi g S k y , M o n t a n a


SITE PLAN THIRD FLOOR

NORTH

133

LOCATION SITE

1-1'

PORCH

1-1

PARKING

STORAGE SEED SEEDLING

STORAGE STRAW SPACE

ADMIN

ENTRY MUDROOM

BATHROOMS KITCHEN

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX 2

WORK PAVILION

GROVE

SECTION

1

2 WORK PAVILION

3 4

7

3

5 8

6

FIREPIT

GROVE

PAVILION

POND

Transition

10

GROVE

4

9

11 12 GROVE 5

Transition

15 14

13

F

E

D

C

B

A'

A

SYMBOLOGY a

SECTION WALL

GROVE 1

LOW WALL PROJECTION

2-2'

SECTION

ARCH XX

AREAS. C

OV

C

E

2

WORK PAVILION

GR

GROVE 1

2 WORK PAVILION

C

1

FOOTPRINT

3229 ft2 (300m2)

CONSTRUCTED AREA

6871.7 ft2 (638.4 m2)

3 GROVE 2

Transition

4

C

7

RO

OM

DOWN

8

6

C

MN

LOT 1 8.34 AC

CONSTRUCTED AREA

13,153.5 ft2 (1222 m2)

GROVE 3

C

BED

PAVILION LOT 4 1.02 AC

5683.3 ft2 (528m2)

MN

5

C

FOOTPRINT

C

FOOTPRINT

10,494.8 ft2 (975m2)

CONSTRUCTED AREA

18,186.7 ft2 (1689.6 m2)

C

BED

RO

OM

C

DOWN

GROVE 4

WETLAND

FIREPIT

5651 ft2 (525m2)

CONSTRUCTED AREA

9881.3 ft2 (918 m2)

MN

9

FOOTPRINT

BARN

C

BED

RO

OM

C

DOWN

3

FOOTPRINT

GR

MN

OV

E

10

C

BED RO

OM

CONSTRUCTED AREA

C

2010 ft2 (186.8m2) 3444 ft2 (320 m2)

DOWN

PAVILIONS MN

11

C

FOOTPRINT

807 ft2 (75m2)

CONSTRUCTED AREA

807 ft2 (75m2)

BED

RO

OM

C

DOWN

MN

12

C

BED

RO

OM

DOWN

GROVE 4

Transition

13

OWNER:

Big Country Development DESIGN STUDIO

INE

ICE

ZAN

OFF

MEZ

14

DOWN

MN

INE

ICE

ZAN

OFF

MEZ

M4

ROO

C

BED

15

C

TALLER 13

DOWN

MN

PROYECT.

M4

ROO

C

BED

INE

ICE

ZAN

OFF

MEZ DOWN

MN M4

ROO

C

BED

THE GROVE ADRESS.

Partridge Hollow, Big Sky, MT DATE: 01 OCTOBER 2021 SCALE. 1:2000

Gr o v e Bi g S k y , M o n t a n a


NORTH

GROVE 1

135

TV ROOM

1-1'

PORCH

1-1

PARKING

SEED STORAGE SEEDLING

STORAGE SPACE STRAW

ADMIN

ENTRY MUDROOM

KITCHEN

BATHROOMS

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX SECTION

2

WORK PAVILION

GROVE

4-4'

ARCH XX SECTION

5-5'

ARCH XX SECTION

4-4'

ARCH XX SECTION

5-5'

ARCH XX SECTION

LOCATION SITE

1

2 WORK PAVILION

3 4 7 5 8

6

FIREPIT

GROVE

3

PAVILION

POND

Transition

GROVE

4

9 10 11 12 GROVE 5

Transition

15 14

OPTION 1

13

SYMBOLOGY a

OPTIONS

SECTION WALL LOW WALL PROJECTION

A

G

L S

S A

H

D

T L

BEDROOM 4

Y O R D

E SJ

E

O M

D RI

H

RA

S

A S A

3-3'

ÑA B

3-3'

ARCH XX SECTION

ARCH XX SECTION

3-3'

3-3'

ARCH XX SECTION

ARCH XX SECTION

SOLARIUM

GROVE LOCATION BEDROOM 4

MN

2-2'

2-2'

STORAGE LAUNDRY

ARCH XX SECTION

ARCH XX SECTION

2-2' ARCH XX SECTION

2-2' ARCH XX SECTION

BEDROOM 1

OPTION 2

DOWN

OFFICE TV ROOM BEDROOM

ENTRY

1-1'

UP

ARCH XX SECTION

MUDROOM

2 1-1' ARCH XX SECTION

1-1'

1

1-1'

ARCH XX SECTION

ARCH XX SECTION

C

GF

ARCH XX SECTION

ARCH XX SECTION

4-4'

OPTION 3

BEDROOM 2

MN DINING

BEDROOM 3

4-4'

3-3'

3-3'

ARCH XX SECTION

2-2'

2-2'

ARCH XX SECTION

GROUND FLOOR CONSTRUCTION

1017 ft2 (94.5 m2)

FIRST FLOOR CONSTRUCTION

1485 ft2 (138 m2)

SECOND FLOOR CONSTRUCTION

933 ft2 (86.7 m2)

CONSTRUCTED AREA

3436 ft2 (319.2 m2)

GARAGE

603 ft2 (56 m2)

SOLAR AREA

539 ft2 (50.12 m2)

Big Country Development DESIGN STUDIO

1-1'

ARCH XX SECTION

1615 ft2 (150m2)

OWNER:

ARCH XX SECTION

LIVING ROOM

1-1'

FOOTPRINT

ARCH XX SECTION

UP

FIREPLACE

DOWN

2-2' ARCH XX SECTION

ARCH XX SECTION

5-5' 3-3' ARCH XX SECTION

GROVE 1 AREAS PER HOUSE

ARCH XX SECTION

4-4'

KITCHEN

PANTRY

TOILET

ARCH XX SECTION

ARCH XX SECTION

5-5' 2-2'

AREAS.

2F

3-3' ARCH XX SECTION

ARCH XX SECTION

5-5'

ARCH XX SECTION

4-4'

ARCH XX SECTION

5-5'

OFFICE

ARCH XX SECTION

1-1'

TALLER 13

1-1'

ARCH XX SECTION

ARCH XX SECTION

C

PROYECT.

ARCH XX SECTION

4-4'

ARCH XX SECTION

3F

5-5'

ARCH XX SECTION

4-4'

1F

ARCH XX SECTION

THE GROVE 5-5'

134

ADRESS. 0m

1m

3m

Partridge Hollow, Big Sky, MT DATE: 01 OCTOBER 2021 SCALE. 1:100

Gr o v e Bi g S k y , M o n t a n a


GROVE 1 SECTIONS

137

LOCATION SITE

SOLARIUM

SOLARIUM

MASTER

1-1'

PORCH

1-1

PARKING

SEED STORAGE SEEDLING

STORAGE SPACE STRAW

ADMIN

ENTRY MUDROOM

KITCHEN

BATHROOMS

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX SECTION

GROVE

2

WORK PAVILION

1

2 WORK PAVILION

3 4 7 5 8

6

FIREPIT

GROVE

3

PAVILION

POND

Transition

10

4

9 GROVE

136

NORTH

11 12 GROVE 5

Transition

15 14

BATHROOM

BEDROOM 3

LIVING ROOM

LIVING ROOM

DINING

KITCHEN

SYMBOLOGY a

MUDROOM TV ROOM

MUDROOM

13

SECTION

GARAGE

WALL LOW WALL

ENTRY

PROJECTION

GROVE LOCATION

SECTION 1-1'

SECTION 4-4' 01

2

DET-XX

SOLARIUM

SOLARIUM

1

AREAS.

BEDROOM 1

GROVE 1 AREAS PER HOUSE

BEDROOM 3

DINING

PANTRY

FOOTPRINT

1615 ft2 (150m2)

GROUND FLOOR CONSTRUCTION

1017 ft2 (94.5 m2)

FIRST FLOOR CONSTRUCTION

1485 ft2 (138 m2)

SECOND FLOOR CONSTRUCTION

933 ft2 (86.7 m2)

CONSTRUCTED AREA

3436 ft2 (319.2 m2)

GARAGE

603 ft2 (56 m2)

SOLAR AREA

539 ft2 (50.12 m2)

GARAGE DECK

BATHROOM

STORAGE LAUNDRY

BEDROOM 4

SECTION 2-2'

SECTION 5-5'

OWNER:

Big Country Development SOLARIUM BATHROOM

BEDROOM 2

DESIGN STUDIO

WALKING CLOSET

TOILET

TALLER 13 PANTRY

PROYECT.

KITCHEN

THE GROVE

GARAGE BEDROOM 4

ADRESS.

Partridge Hollow, Big Sky, MT DATE: 01 OCTOBER 2021 SCALE. 1:100

SECTION 3-3'

Gr o v e Bi g S k y , M o n t a n a


NORTH

138

139

LOCATION SITE

GROVE 1

1-1'

PORCH

1-1

PARKING

SEED STORAGE SEEDLING

STORAGE SPACE STRAW

ADMIN

KITCHEN

ENTRY MUDROOM

BATHROOMS

GROVE 1

FREE SPACE

2

WORK PAVILION

GROVE

FACADES

ARCH XX SECTION

ARCH XX SECTION

1

2 WORK PAVILION

3 4 7 5 8

6

FIREPIT

GROVE

3

PAVILION

POND

Transition

GROVE

10

4

9

11 12 GROVE 5

Transition

15 14

13

SYMBOLOGY a

SECTION WALL LOW WALL PROJECTION

GROVE LOCATION

2

EAST FACADE

1

NORTH FACADE

AREAS. GROVE 1 AREAS PER HOUSE

01 DET-XX

01 DET-XX

FOOTPRINT

1615 ft2 (150m2)

GROUND FLOOR CONSTRUCTION

1017 ft2 (94.5 m2)

FIRST FLOOR CONSTRUCTION

1485 ft2 (138 m2)

SECOND FLOOR CONSTRUCTION

933 ft2 (86.7 m2)

CONSTRUCTED AREA

3436 ft2 (319.2 m2)

GARAGE

603 ft2 (56 m2)

SOLAR AREA

539 ft2 (50.12 m2)

OWNER:

Big Country Development DESIGN STUDIO

TALLER 13 WEST FACADE

PROYECT.

SOUTH FACADE

THE GROVE ADRESS.

Partridge Hollow, Big Sky, MT DATE: 01 OCTOBER 2021 SCALE. 1:100

Gr o v e Bi g S k y , M o n t a n a


4-4'

ARCH XX SECTION

5-5'

ARCH XX SECTION

4-4'

GROVE 2

141

LOCATION SITE

ARCH XX SECTION

5-5'

140

ARCH XX SECTION

NORTH

1-1'

PORCH

1-1

PARKING

SEED STORAGE SEEDLING

STORAGE STRAW SPACE

ADMIN

MUDROOM ENTRY

KITCHEN

BATHROOMS

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX SECTION

GROVE

2

WORK PAVILION

1

2

WORK PAVILION

3 4 7 5 8

6

FIREPIT

GROVE

3

PAVILION

POND

Transition

GROVE

4

9 10 11 12 GROVE 5

Transition

15 14

13

SYMBOLOGY a

SECTION WALL LOW WALL

MN LAUNDRY

PROJECTION

MN

MUDROOM ENTRY

3-3'

3-3'

UP

ARCH XX SECTION

ARCH XX SECTION

3-3'

3-3'

ARCH XX SECTION

ARCH XX SECTION

BEDROOM 1

GROVE LOCATION

FIREPLACE

BUNKROOM/ TVROOM

2-2'

2-2'

ARCH XX SECTION

ARCH XX SECTION

2-2'

2-2'

DOWN

ARCH XX SECTION

3

ARCH XX SECTION

4

GARAGE BEDROOM 3

BEDROOM 2

5

R O

M

ID H

A S

A

S

A R E

JE

S

Ñ

A

B

A

1-1'

ARCH XX SECTION

4-4'

ARCH XX SECTION

ARCH XX SECTION

5-5'

ARCH XX SECTION

1-1'

1-1'

ARCH XX SECTION

F2

AREAS. GROVE 2

GF 4-4'

ARCH XX SECTION

5-5'

ARCH XX SECTION

4-4'

ARCH XX SECTION

5-5'

ARCH XX SECTION

AREAS PER HOUSE

OFFICE

UP

OPTIONS

MN

3-3'

OPTION 1

PANTRY

SOLARIUM KITCHEN

ARCH XX SECTION

6

ARCH XX SECTION

C

ARCH XX SECTION

STORAGE

1-1'

4-4'

T S L S

ARCH XX SECTION

A L

5-5'

O

G

D

DY

H R

2-2'

UP

ARCH XX SECTION

3-3' ARCH XX SECTION

TOILET

2-2' ARCH XX SECTION

DOWN

3-3'

3-3'

ARCH XX SECTION

ARCH XX SECTION

2-2'

2-2'

ARCH XX SECTION

FOOTPRINT

1421 ft2 (132m2)

GROUND FLOOR CONSTRUCTION

843 ft2 (78.3 m2)

FIRST FLOOR CONSTRUCTION

1223 ft2 (113.6 m2)

SECOND FLOOR CONSTRUCTION

1223 ft2 (113.6 m2)

CONSTRUCTED AREA

3288 ft2 (305.5 m2)

GARAGE

577 ft2 (53.6 m2)

SOLAR AREA

370 ft2 (34.38 m2)

ARCH XX SECTION

OWNER:

DINING

Big Country Development

LIVING ROOM

DESIGN STUDIO 1-1'

1-1'

ARCH XX SECTION

C

ARCH XX SECTION

FIREPLACE

1-1'

1-1'

ARCH XX SECTION

ARCH XX SECTION

C

TALLER 13 THE GROVE

ARCH XX SECTION

4-4'

ARCH XX SECTION

F3

5-5'

ARCH XX SECTION

4-4'

ARCH XX SECTION

F1

5-5'

PROYECT.

0m

1m

3m

ADRESS.

Partridge Hollow, Big Sky, MT DATE

01 OCTOBER 2021

SCALE. 1:100

Gr o v e Bi g S k y , M o n t a n a


GROVE 2 SECTIONS

NORTH

142

143

LOCATION SITE

BEDROOM 2

BEDROOM 3

BEDROOM 1

BEDROOM 3

1-1'

PORCH

1-1

PARKING

SEED STORAGE SEEDLING

STORAGE STRAW SPACE

ADMIN

KITCHEN

MUDROOM ENTRY

BATHROOMS

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX SECTION

GROVE

2

WORK PAVILION

1

2 WORK PAVILION

3 4 7 5 8

6

FIREPIT

GROVE

3

PAVILION

POND

Transition

10

DINNING

LIVING ROOM

LIVING ROOM

GROVE

4

9

11

TV ROOM

12 GROVE 5

Transition

15 14

13

SYMBOLOGY a BATHROOM

STORAGE

GARAGE

GARAGE

SECTION

MUDROOM

WALL LOW WALL PROJECTION

GROVE LOCATION

3

SECTION 1-1'

SECTION 4-4'

4

5

6 BATHROOM

AREAS. KITCHEN

GROVE 2

LIVING ROOM

AREAS PER HOUSE GARAGE TV ROOM

SECTION 2-2'

BATHROOM

FOOTPRINT

1421 ft2 (132m2)

GROUND FLOOR CONSTRUCTION

843 ft2 (78.3 m2)

FIRST FLOOR CONSTRUCTION

1223 ft2 (113.6 m2)

SECOND FLOOR CONSTRUCTION

1223 ft2 (113.6 m2)

CONSTRUCTED AREA

3288 ft2 (305.5 m2)

GARAGE

577 ft2 (53.6 m2)

SOLAR AREA

370 ft2 (34.38 m2)

STORAGE

WALKING CLOSET

OWNER:

BEDROOM 1

KITCHEN

Big Country Development DESIGN STUDIO

TV ROOM

LAUNDRY

MUDROOM

SECTION 5-5'

TALLER 13 PROYECT.

ENTRY

THE GROVE ADRESS.

Partridge Hollow, Big Sky, MT DATE

SECTION 3-3'

Gr o v e Bi g S k y , M o n t a n a

01 OCTOBER 2021

SCALE. 1:100


NORTH

GROVE 2

145

LOCATION SITE

FACADES 1-1'

PORCH

1-1

PARKING

SEED STORAGE SEEDLING

STORAGE STRAW SPACE

ADMIN

KITCHEN

MUDROOM ENTRY

BATHROOMS

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX SECTION

GROVE

2

WORK PAVILION

1

2

WORK PAVILION

3 4 7 5 8

6

FIREPIT

GROVE

3

PAVILION

POND

Transition

4

9 10

GROVE

144

11 12 GROVE 5

Transition

15 14

13

SYMBOLOGY a

SECTION WALL LOW WALL PROJECTION

GROVE LOCATION

3

4

5

6

WEST FACADE

AREAS. SOUTH FACADE

GROVE 2 AREAS PER HOUSE FOOTPRINT

1421 ft2 (132m2)

GROUND FLOOR CONSTRUCTION

843 ft2 (78.3 m2)

FIRST FLOOR CONSTRUCTION

1223 ft2 (113.6 m2)

SECOND FLOOR CONSTRUCTION

1223 ft2 (113.6 m2)

CONSTRUCTED AREA

3288 ft2 (305.5 m2)

GARAGE

577 ft2 (53.6 m2)

SOLAR AREA

370 ft2 (34.38 m2)

OWNER:

Big Country Development EAST FACADE

NORTH FACADE

DESIGN STUDIO

TALLER 13 PROYECT.

THE GROVE ADRESS.

Partridge Hollow, Big Sky, MT DATE

01 OCTOBER 2021

SCALE. 1:100

Gr o v e Bi g S k y , M o n t a n a


3-3'

ARCH XX SECTION

4-4'

ARCH XX SECTION

3-3'

ARCH XX SECTION

4-4'

ARCH XX SECTION

GROVE 3

SOLARIUM

147

LOCATION SITE

DOWN

OPTION 1

OPTIONS

C

MN

C

1-1'

PORCH

1-1

PARKING

SEED STORAGE SEEDLING

STORAGE STRAW SPACE

ADMIN

ENTRY MUDROOM

BATHROOMS

KITCHEN

SECTION

SECTION

2

WORK PAVILION

1

2 WORK PAVILION

3 4 7

5 3

PAVILION

A D L

RD Y

H

A

B

R

SA

E

H

D

A MO RI

8

6

ALG

J

SA

FIREPIT

GROVE

SO

C TS

S

ARCH XX

GROVE 1

FREE SPACE

ARCH XX

GROVE

FIREPLACE UP

POND

Transition

GROVE

4

9 10 11

DINING

12 GROVE 5

Transition

15 14

2-2'

2-2'

ARCH XX SECTION

ARCH XX SECTION

BEDROOM

2-2' ARCH XX SECTION

2-2'

1-1'

a

ARCH XX SECTION

SECTION

DOWN

1-1' ARCH XX SECTION

1-1'

WALL

1-1'

ARCH XX SECTION

13

SYMBOLOGY

OFFICE

ARCH XX SECTION

DOWN

LIVING ROOM

OPTION 2

ARCH XX SECTION

LOW WALL PROJECTION

TOILET

GROVE LOCATION

C

KITCHEN

PANTRY

Transition

4 7 5

TV ROOM

GF

F2

8

6

POND

DOWN

OPTION 3

OV GR

10

E

4

9 GROVE 1

11 12

MN

ENTRY

FIREPLACE

C

Transition

C

UP

DINING

MUDROOM

2-2'

AREAS.

2-2'

ARCH XX SECTION

ARCH XX SECTION

LIVING ROOM

1-1'

UP

ARCH XX SECTION

GROVE 3 AREAS PER HOUSE

1-1' ARCH XX SECTION

LAUNDRY

KITCHEN

STORAGE

GF

F3

BEDROOM 2

ARCH XX SECTION

3-3'

ARCH XX SECTION

4-4'

0m

1m

3m

FOOTPRINT

1749 ft2 (162.5m2)

GROUND FLOOR CONSTRUCTION

1173 ft2 (109 m2)

FIRST FLOOR CONSTRUCTION

1354 ft2 (125.8 m2)

SECOND FLOOR CONSTRUCTION

504 ft2 (46.8 m2)

CONSTRUCTED AREA

3031 ft2 (281.6 m2)

GARAGE

577 ft2 (53.6 m2)

SOLAR AREA

478 ft2 (44.4 m2)

C

MN

BEDROOM 3

2-2'

2-2'

ARCH XX SECTION

ARCH XX SECTION

OWNER:

Big Country Development

DOWN

1-1' ARCH XX SECTION

1-1'

UP

ARCH XX SECTION

DESIGN STUDIO

TALLER 13 PROYECT.

THE GROVE

BEDROOM 1

ADRESS.

ARCH XX SECTION

3-3'

F1

ARCH XX SECTION

Partridge Hollow, Big Sky, MT

4-4'

146

NORTH C

DATE:

01 OCTOBER 2021

SCALE. 1:100

Gr o v e Bi g S k y , M o n t a n a


NORTH

149

LOCATION SITE

GROVE 3 SECTIONS

1-1'

PORCH

1-1

PARKING

SEED STORAGE SEEDLING

STORAGE STRAW SPACE

ADMIN

ENTRY MUDROOM

KITCHEN

BATHROOMS

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX SECTION

GROVE

2

WORK PAVILION

1

2 WORK PAVILION

3 4 7 5

8

6

FIREPIT

GROVE

3

PAVILION

POND

Transition

4

9 10

GROVE

11 12 GROVE 5

Transition

15 14

13

SYMBOLOGY a

SECTION WALL LOW WALL PROJECTION

BATHROOM

CLOSET

BEDROOM 3

GROVE LOCATION Transition

4

GARAGE

7 5

8

6

DINING

LIVING ROOM POND

LIVING ROOM 9

10

OV

GROVE 1

E

4

KITCHEN

GR

148

11 12

Transition

AREAS. SECTION 3-3'

SECTION 1-1'

GROVE 3 AREAS PER HOUSE

BATHROOM

BATHROOM

SOLARIUM

FOOTPRINT

1749 ft2 (162.5m2)

GROUND FLOOR CONSTRUCTION

1173 ft2 (109 m2)

FIRST FLOOR CONSTRUCTION

1354 ft2 (125.8 m2)

SECOND FLOOR CONSTRUCTION

504 ft2 (46.8 m2)

CONSTRUCTED AREA

3031 ft2 (281.6 m2)

GARAGE

577 ft2 (53.6 m2)

SOLAR AREA

478 ft2 (44.4 m2)

CLOSET

01 DET-XX

BEDROOM 2

BATHROOM

BEDROOM 3

BEDROOM 1

BATHROOM

OWNER:

GARAGE GARAGE

DINING

MUDROOM

Big Country Development

LIVING ROOM

DESIGN STUDIO

TALLER 13 PROYECT.

THE GROVE ADRESS.

SECTION 2-2'

SECTION 4-4'

Partridge Hollow, Big Sky, MT DATE:

01 OCTOBER 2021

SCALE. 1:100

Gr o v e Bi g S k y , M o n t a n a


NORTH

150

151

LOCATION SITE

GROVE 3 FACADES

1-1'

PORCH

1-1

PARKING

SEED STORAGE SEEDLING

STORAGE STRAW SPACE

ADMIN

ENTRY MUDROOM

KITCHEN

BATHROOMS

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX SECTION

GROVE

2

WORK PAVILION

1

2 WORK PAVILION

3 4 7 5

8

6

FIREPIT

GROVE

3

PAVILION

POND

Transition

GROVE

10

4

9

11 12 GROVE 5

Transition

15 14

13

SYMBOLOGY a

SECTION WALL LOW WALL PROJECTION

GROVE LOCATION Transition

4 7 5

8

6

POND

OV GR

10

E

4

9 GROVE 1

11 12

Transition

AREAS. WEST FACADE

SOUTH FACADE

GROVE 3 AREAS PER HOUSE FOOTPRINT

1749 ft2 (162.5m2)

GROUND FLOOR CONSTRUCTION

1173 ft2 (109 m2)

FIRST FLOOR CONSTRUCTION

1354 ft2 (125.8 m2)

SECOND FLOOR CONSTRUCTION

504 ft2 (46.8 m2)

CONSTRUCTED AREA

3031 ft2 (281.6 m2)

GARAGE

577 ft2 (53.6 m2)

SOLAR AREA

478 ft2 (44.4 m2)

OWNER:

Big Country Development DESIGN STUDIO

TALLER 13 PROYECT.

EAST FACADE

NORTH FACADE

THE GROVE ADRESS.

Partridge Hollow, Big Sky, MT DATE:

01 OCTOBER 2021

SCALE. 1:100

Gr o v e Bi g S k y , M o n t a n a


3-3'

ARCH XX SECTION

4-4'

ARCH XX SECTION

3-3'

ARCH XX SECTION

ARCH XX SECTION

4-4'

152

NORTH

GROVE 4

153

LOCATION SITE

1-1'

PORCH

1-1

PARKING

SEED STORAGE SEEDLING

STORAGE STRAW SPACE

ADMIN

KITCHEN

ENTRY MUDROOM

BATHROOMS

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX SECTION

GROVE

2

WORK PAVILION

1

2 WORK PAVILION

3 4 7

5

KITCHEN

GROVE

3

POND

Transition

2-2' ARCH XX SECTION

TOILET

OFFICE

2-2'

10

4

9

2-2' ARCH XX SECTION

8

6

FIREPIT

GROVE

PANTRY

PAVILION

11 12 GROVE 5

Transition

15

2-2'

ARCH XX SECTION

14

ARCH XX SECTION

13

SYMBOLOGY a

DOWN

SECTION WALL LOW WALL

DINING

1-1'

1-1'

ARCH XX SECTION

ARCH XX SECTION

LIVING ROOM

1-1'

PROJECTION

1-1'

BEDROOM 4

ARCH XX SECTION

ARCH XX SECTION

MEZZANINE H

ID R

GROVE LOCATION

O M

A

S

A S

J

RA

E

S E

Ñ

A B

DY

H

A T

D L R O G L A S S

UP

C

MN

FIREPLACE

C

11 12

STORAGE

2-2' LAUNDRY

ARCH XX SECTION

3-3'

13

14

ARCH XX SECTION

3-3'

Transition

15

KITCHEN

PANTRY

2-2' ARCH XX SECTION

ARCH XX SECTION

F2

4-4'

ARCH XX SECTION

3-3'

4-4'

ARCH XX SECTION

OPTIONS

GF

ARCH XX SECTION

TOILET

2-2'

AREAS.

2-2'

ARCH XX SECTION

ARCH XX SECTION

GROVE 4 AREAS PER HOUSE

UP

DINING

1-1'

1-1'

ARCH XX SECTION

ARCH XX SECTION

LIVING ROOM

1-1' ARCH XX SECTION

ARCH XX SECTION

MUDROOM A R

H S

ID R

A O M

Ñ

GROUND FLOOR CONSTRUCTION

1259 ft2 (117 m2)

FIRST FLOOR CONSTRUCTION

1615 ft2 (150 m2)

SECOND FLOOR CONSTRUCTION

420 ft2 (39 m2)

CONSTRUCTED AREA

3294 ft2 (306 m2)

GARAGE

624 ft2 (58 m2)

SOLAR AREA

555.6 ft2 (51.62 m2)

JE A

S

E

A

1884 ft2 (175m2)

S

ENTRY

FOOTPRINT 1-1'

Y R

H

B

UP

FIREPLACE

ARCH XX SECTION

3-3'

F3

ARCH XX SECTION

C

ARCH XX SECTION

3-3'

ARCH XX SECTION

C

4-4'

MN

4-4'

L

S

O

G L A S

GF

A T

D

D

0m

1m

3m

WN

BEDROOM 1

OWNER: 2-2'

2-2'

ARCH XX SECTION

Big Country Development

ARCH XX SECTION

OFFICE TV ROOM

SOLARIUM

DESIGN STUDIO

TALLER 13

UP

C

DOWN

1-1'

1-1'

BEDROOM 2 BEDROOM 3

ARCH XX SECTION

MN

PROYECT.

THE GROVE ADRESS.

Partridge Hollow, Big Sky, MT

C

F1

ARCH XX SECTION

3-3'

ARCH XX SECTION

DATE

4-4'

Gr o v e Bi g S k y , M o n t a n a

ARCH XX SECTION

OPTION 1

01 OCTOBER 2021

SCALE. 1:100


NORTH

155

LOCATION SITE

1-1'

PORCH

1-1

PARKING

SEED STORAGE SEEDLING

STORAGE STRAW SPACE

ADMIN

KITCHEN

ENTRY MUDROOM

BATHROOMS

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX SECTION

GROVE

2

WORK PAVILION

1

2 WORK PAVILION

3

4 7

5 8

6

FIREPIT

GROVE

3

PAVILION

POND

Transition

4

9 10

GROVE

154

GROVE 4 SECTIONS

11 12 GROVE 5

Transition

15 14

13

SYMBOLOGY a

SECTION

BEDROOM 3

WALL LOW WALL

MEZZANINE

PROJECTION BATHROOM

BEDROOM 2

BEDROOM 1

BEDROOM 1

MASTER

GROVE LOCATION 11

GARAGE 12

VEG

LIVING ROOM

LIVING ROOM

Transition

15

KITCHEN

13

14

SECTION 1-1'

SECTION 3-3'

AREAS. GROVE 4 AREAS PER HOUSE

BATHROOM

OFFICE

TV ROOM

BATHROOM

FOOTPRINT

1884 ft2 (175m2)

GROUND FLOOR CONSTRUCTION

1259 ft2 (117 m2)

FIRST FLOOR CONSTRUCTION

1615 ft2 (150 m2)

SECOND FLOOR CONSTRUCTION

420 ft2 (39 m2)

CONSTRUCTED AREA

3294 ft2 (306 m2)

GARAGE

624 ft2 (58 m2)

SOLAR AREA

555.6 ft2 (51.62 m2)

OFFICE

MASTER

CLOSET

BEDROOM 1

MASTER

OWNER: GARAGE

LAUNDRY

LAUNDRY TOILET

Big Country Development

STORAGE

DESIGN STUDIO

KITCHEN

TALLER 13 PROYECT.

THE GROVE ADRESS.

SECTION 2-2'

SECTION 4-4'

Partridge Hollow, Big Sky, MT DATE

01 OCTOBER 2021

SCALE. 1:100

Gr o v e Bi g S k y , M o n t a n a


NORTH

157

LOCATION SITE

1-1'

PORCH

1-1

PARKING

SEED STORAGE SEEDLING

STORAGE STRAW SPACE

ADMIN

KITCHEN

ENTRY MUDROOM

BATHROOMS

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX SECTION

GROVE

2

WORK PAVILION

1

2

WORK PAVILION

3 4

7 5 8

6

FIREPIT

GROVE

3

PAVILION

POND

Transition

10

4

9 GROVE

156

GROVE 4 FACADES

11 12 GROVE 5

Transition

15 14

13

SYMBOLOGY a

SECTION WALL LOW WALL PROJECTION

GROVE LOCATION 11 12

Transition

15

13

14

WEST FACADE

SOUTH FACADE

AREAS. GROVE 4 AREAS PER HOUSE FOOTPRINT

1884 ft2 (175m2)

GROUND FLOOR CONSTRUCTION

1259 ft2 (117 m2)

FIRST FLOOR CONSTRUCTION

1615 ft2 (150 m2)

SECOND FLOOR CONSTRUCTION

420 ft2 (39 m2)

CONSTRUCTED AREA

3294 ft2 (306 m2)

GARAGE

624 ft2 (58 m2)

SOLAR AREA

555.6 ft2 (51.62 m2)

OWNER:

Big Country Development DESIGN STUDIO

TALLER 13 PROYECT.

EAST FACADE

NORTH FACADE

THE GROVE ADRESS.

Partridge Hollow, Big Sky, MT DATE

01 OCTOBER 2021

SCALE. 1:100

Gr o v e Bi g S k y , M o n t a n a


NORTH

158

159 LOCATION SITE

BARN 1-1'

PORCH

STORAGE

1-1

PARKING

SEED STORAGE SEEDLING

STRAW SPACE

ENTRY ADMIN

KITCHEN

BATHROOMS

MUDROOM

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX SECTION

GROVE

2

WORK PAVILION

1

2

WORK PAVILION

3 4

7 3

5 8

6

FIREPIT

GROVE

PAVILION

POND

Transition

GROVE

4

9 10 11 12 GROVE 5

Transition

15 14

2-2'

ARCH XX

SECTION

2-2'

ARCH XX

SECTION

SYMBOLOGY a

A

A'

B

C

D

E

F

MULTIPURPOSE SPACE

A

13

A'

B

C

D

E

SECTION WALL

F

LOW WALL

OPTION 1

PROJECTION

01

01

02

GROVE LOCATION

02 SEED STORAGE SEEDLING

OFFICE

BATHROOMS

03

03

UP

OPTIONS

1-1'

1-1'

ARCH XX

ARCH XX

SECTION

SECTION

1-1'

1-1'

ARCH XX

ARCH XX

SECTION

SECTION

ENTRY

ENTRY

FREE SPACE

04

04

ENTRY

05

05 2-2'

SECTION

ARCH XX

2-2'

SECTION

ARCH XX

AREAS. BARN

F3

GF

FOOTPRINT

2-2'

ARCH XX

SECTION

A

A'

B

C

D

E

F

2010 ft2 (187m2)

GROUND FLOOR AREA

2010 ft2 (187 m2)

MEZANNINE AREA

808 ft2 (75 m2)

CONSTRUCTED AREA

2818 ft2 (262 m2)

SOLAR AREA

574 ft2 (53.3 m2)

01 02

KITCHEN COWORK

MULTIPURPOSE SPACE

DOWN

03

OWNER: UP

1-1' ARCH XX

1-1' ARCH XX

SECTION

SECTION

Big Country Development DESIGN STUDIO

TALLER 13

04

PROYECT.

05

THE GROVE 2-2'

SECTION

ARCH XX

ADRESS.

MEZZANINE

Partridge Hollow, Big Sky, MT DATE

JULY / 2021

SCALE. 1:100

Gr o v e Bi g S k y , M o n t a n a


NORTH

LOCATION SITE

160

161 1-1'

PORCH

STORAGE

1-1

PARKING

SEED STORAGE SEEDLING

STRAW SPACE

ENTRY ADMIN

KITCHEN

BATHROOMS

MUDROOM

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX SECTION

GROVE

2

WORK PAVILION

1

2 WORK PAVILION

3 4

7 3

5 8

6

FIREPIT

GROVE

PAVILION

POND

Transition

E

GROV

10

4

9

11

FACADES

12 GROVE 5

Transition

15 14

13

SYMBOLOGY a

SECTION WALL LOW WALL PROJECTION

GROVE LOCATION

SOUTH FACADE

EAST FACADE

AREAS. BARN

FOOTPRINT

NORTH FACADE

2010 ft2 (187m2)

GROUND FLOOR AREA

2010 ft2 (187 m2)

MEZANNINE AREA

808 ft2 (75 m2)

CONSTRUCTED AREA

2818 ft2 (262 m2)

SOLAR AREA

574 ft2 (53.3 m2)

WEST FACADE

OWNER:

Big Country Development DESIGN STUDIO

TALLER 13 PROYECT.

THE GROVE ADRESS.

Partridge Hollow, Big Sky, MT DATE

JULY / 2021

SCALE. 1:100

Gr o v e Bi g S k y , M o n t a n a


NORTH

162

163

LOCATION SITE

SECTIONS 1-1'

PORCH

STORAGE

1-1

PARKING

SEED STORAGE SEEDLING

STRAW SPACE

ENTRY ADMIN

KITCHEN

BATHROOMS

MUDROOM

GROVE 1

FREE SPACE

ARCH XX SECTION

ARCH XX SECTION

GROVE

2

WORK PAVILION

1

2 WORK PAVILION

3 4

7 3

5 8

6

FIREPIT

GROVE

PAVILION

POND

Transition

GROVE

4

9 10 11 12 GROVE 5

Transition

15 14

A

B

C

D

E

F

13

SYMBOLOGY a

SECTION WALL LOW WALL PROJECTION

GROVE LOCATION

SECTION 1-1'

AREAS. BARN

FOOTPRINT

01

02

04

05

2010 ft2 (187m2)

GROUND FLOOR AREA

2010 ft2 (187 m2)

MEZANNINE AREA

808 ft2 (75 m2)

CONSTRUCTED AREA

2818 ft2 (262 m2)

SOLAR AREA

574 ft2 (53.3 m2)

OWNER:

SECTION 2-2'

Big Country Development DESIGN STUDIO

TALLER 13 PROYECT.

THE GROVE ADRESS.

Partridge Hollow, Big Sky, MT DATE

JULY / 2021

SCALE. 1:100

Gr o v e Bi g S k y , M o n t a n a


164

165

Gr o v e Bi g S k y , M o n t a n a


G

R

O

V

E


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.