DUO as slab formwork
Geometrical adaptations in front of walls and columns under construction
Wall compensations Additional components such as the DUO Filler Support and suitable plywood allow you to close filler areas quickly and easily. The slab areas are shuttered to the greatest possible extent using standard panels. To minimise residual gaps, you can also install the panels laterally. The filler support is mounted on the last panel. In front of the wall under construction, a formwork girder on a slab prop serves as support for the filler plate.
Shuttering of columns Using filler supports and cut-tosize plywood will enable you to safely close residual gaps even on columns under construction. Two DUO Filler Supports on the adjacent panels and laterally positioned timber provide support for the filler plates. You can cut these to suit your project-specific geometry.
44
You can attach the DUO Filler Support to the long side of the panel with two DUO couplers before pushing the panel upwards.
In front of the wall, a VT 20 or GT 24 formwork girder is used as a support for the filler plate. You can nail the formwork panel firmly into place.