ACS
airport capacity solutions
2
Modular Turnkey Solutions Airport Capacity Solutions provide a full and extensive turnkey service from concept design, through manufacturing and project management to delivery of any operational requirement within a ‘live’ working environment using our innovative approach. We believe that working closely with the Client to define the requirements ensures the most effective Turnkey solution. Through excellent collaboration with carefully selected globally recognised partners we are proud to be leading a new ‘movement’ towards swift, eco-friendly and cost effective solutions using Modular Systems. These solutions are completely flexible and can be designed to suit your individual requirements – at a fraction of the cost of traditional design and build and in a fraction of the time.
Heathrow Terminal 5
3
Thinking inside the box
What is ‘Baggage in a Box’?
Why do I need help?
Airport Capacity Solutions have extensive knowledge and experience in the design, development and implementation of HBS solutions, and it is the natural progression of this experience that has allowed us to develop and deliver the brand new and unique Baggage in a Box solution.
There are many challenges facing all airports in Europe and the United Kingdom when it comes to Baggage Handling Systems (BHS). One of the biggest is the implementation and compliance to EU Regulation No. 1087/2011 which require all airports at EU member states and other countries, to be compliant to Standard 3 level of Hold Baggage Screening.
Baggage in a Box is the instant solution to all your Standard 3 compliance worries. It is a completely modularized, self-contained Standard 3 Compliant HBS screening facility. Baggage in a Box is not only capable of operating as a stand alone facility, utilising the latest ‘plug and play’ technology it is also fully versatile and is capable of being integrated as part of a wider Baggage Handling System.
This new regulation applies to Hold Baggage Screening systems (HBS), Explosive Detection Systems (EDS), Liquid Explosive Detection Systems (LEDS) and security scanners and should not be confused with the 1 - 3 inspection levels. Standard 3 is a framework defined by the European Civil Aviation Conference (ECAC) that sets the minimum required levels of detection. In Europe the deadline for compliance is September 2020, when Standard 2 systems must have been replaced, and September 2018 for all United Kingdom Airports.
4
How can ‘Baggage in a Box’ help me? Whether you need a temporary screening facility whilst you are undergoing HBS replacement works, or you are looking for a more permanent solution. Maybe you need some additional contingency screening capacity for when the unthinkable happens, Baggage in a Box is the perfect instant solution to your Operational headache.
Summary
Come and talk to us to see how we may be able to help solve your operational headaches and achieve Standard 3 compliance ahead of your competition.
• Instant ECAC Compliant Standard 3 HBS Screening • Containerised for Rapid Deployment • Pre-configured in the factory • Capable of operating as a stand alone unit, or as part of a Baggage Handling System via ‘plug and play’ technology. • Capable of running on Mains or Generator power • Capable of being matrixed into the Central Screening Systems • Capable of accommodating all makes and models of Standard 3 Machines • Capable of handling both in-gauge and OOG baggage • Capable of being deployed very quickly • Capable of being re-located at very short notice
5
FBO/MRO The modern Fixed Based Operator and Maintenance Repair Organisation benefits from getting ahead of the competition by identifying new and emerging markets, whilst establishing a footprint as quickly and efficiently as possible. We are able to design and build Turnkey Modular Hangarage and Reception facilities, to support fixed and rotary winged aircraft that reflect your values and image in a fraction of the cost and time associated with the more old fashioned traditional ‘design and build’ approach.
6
Project Management
Capacity Planning
To ensure our client receives true ‘Value for Money’ we utilise industry recognised Project Management methodologies, which are implemented by our own dedicated Project Management teams.
Delivering the most efficient and cost effective solution depends entirely on ensuring that the Facility is fit for purpose. This is the area where most others put ‘form’ before ‘function’.
Wherever in the world we are delivering our solutions, you can rest assured that our Team will drive the project to our exacting standards thus ensuring you take ownership of your prize new asset both on time and within budget.
By carefully understanding our Client’s Operational requirements, we are able to utilise our unique expertise and tools to ensure that we have accurately captured all of the essential elements of the Operation. We translate these requirements into a design that can be tested and measured before we commit to building, thus ensuring that ‘form’ truly follows ‘function’.
7
ACS
airport capacity solutions
‘Bossiney’ | Water Lane | Bradden | Northants | NN12 8FG T +44 (0)1327 861217 E info@airportcapacitysolutions.com www.airportcapacitysolutions.com