28 – 29 March 2019
Rex Hotel Saigon, Ho Chi Minh City, Vietnam
ELECTRIFYING
VIETNAM
THROUGH SUSTAINABLE
ENERGY PLANS
Co-organized by:
Supported by:
www.electrifyvietnam.com
Associate Sponsor:
ELECTRIFYING VIETNAM THROUGH SUSTAINABLE ENERGY PLANS Vietnam - one of the fastest growing na�ons in Asia with more than 6% annual economic growth for the past 25 years has successfully increase its electrifica�on rate from 54% to 98% since 1990; connec�ng some 55m people. It is one of the country’s priori�es in providing secure and affordable supply of energy to all of the society par�cipant and economic sectors at the same �me, a�ract the capital required to expand infrastructure, securing the needed supply which are forecasted to hit 230TWH in 2020, 350TWH in 2025 and 515TWH in 2030. According to the revised Power Development Plan (PDP 7), Vietnam requires total investment of $143.5 billion (excluding privately financed BOT power genera�on projects) for mee�ng its double-digital annual growth of energy in demand. The Vietnam government is broadening their strategic approaches to fully tap the huge poten�al of its energy sector by unlocking private investment poten�als; invi�ng foreign technical exper�se and foreign investment for par�cipa�on in its energy projects. It is es�mated that Vietnam requires investment of 15billion per year, which 75% is earmarked for genera�on and 25% for development of the transmission and distribu�on network. The hos�ng of the Electrify Vietnam 2019 (EVN2019) is to provide an interac�ve pla�orm for poten�al investors and key players of the industry from over 25 countries to get updated on the new direc�ons, investment policies and market poten�al of the energy and power sector in Vietnam; at the same �me discuss strategies and share insights to support the Na�onal Power Development Plan in order to fulfill the demand of 515Twh in 2030.
REASONS WHY YOU SHOULD NOT MISS THIS Understand The Market
Comprehensive Content
Gain first-hand informa�on on to-date Vietnam’s energy market and their future plans
Updated informa�on reflec�ng your most concerned issues in inves�ng in Vietnam including policies, incen�ves, regula�ons
Distinguished Presenters
Project Briefings
Renowned best prac��oners, industry leaders and local authori�es sharing insights
In-depth briefing on masterplans, available projects and collabora�on format
Premium Networking
Business Opportunity
Unrivalled networking and exchange of experiences across 25+ countries
Explore poten�al collabora�ons and investment opportuni�es with 300+ local and interna�onal industry stakeholders
Endorsed by : Centre for Energy Enviroment Resources Development
Bangladesh Association Of International Recruiting Agencies (Baira)
Hong Kong Energy and Minerals United Associations
Media Partners :
1
Polish Solar Power Association (PTES-ISES)
Thai Wind Energy Association
Vietnam Energy Association (VEA)
MARKET INFO ON VIETNAM’S ENERGY SECTOR Energy Production (MWh) and Peak load (MW) from 2015 to 2030 MWh
MW
700000
90651
100000 90000
600000
80000 500000
70000
63471
60000
400000 300000
40000
265400
2016
2017
2018
2019
2020
2021
2022
2023
2024 2025
571752
242264
2015
20000
400327
221145
30000 198268
0
34462
184073
100000
25828
30856
50000
42080
164312
200000
28067
38081
2026 2027
2028
Energy production
AVERAGE GROWTH RATE (%)
10000 0
2029 2030
Peak load
2016-2020
2021-2025
2026-2030
PEAK LOAD
10.26
8.57
7.39
E. PRODUCTION
10.07
8.57
7.39
(source: EVN) (source: EVN)
2
DEVELOPMENT OF ENERGY CONSUMPTION BY SECTOR Renewable Energy 5.4%
Import 1.4%
Gas 22.5
Hydr 37.3%
Coal 33.5% (source: Ins�tute of Energy)
Renewable Energy 3.7%
Import 1.5%
Hydro 30.4%
Gas Turbine 30.0%
Coal 34.4%
Renewable Energy 5.4%
Import 1.4%
Hydro 37.3%
Gas Turbine 22.5%
Coal 33.5%
Source: illustra�on based on EVN (2015A); and numbers provided by the IoE (2016)
3
INSTALLED CAPACITY TARGETS, ACCORDING TO PDP 7 REV 1.4%
2.4%
1.5%
3.6% 1.2%
Others
37.3%
Import Hydro
21.1%
16.9%
15.6%
14.7%
49.3%
42.6%
30.1%
14.9%
Gas
22.5%
Coal
42.7%
RE
33.5%
Installed Capacity
12.5%
5.4%
9.9%
12.5%
2015
2020
2025
2030
39 GW
60 GW
96 GW
129.5 GW
RENEWABLES TARGETS FOR 2020, 2025 AND 2030 RE* (% eclectricity production)
2020 6.5%
2025 6.9%
2030 10.7% 12,000 MW
6,000 MW 4,000 MW
Total installed capacity
2,000 MW
800 MW 850 MW
% electricity production
1%
0.8%
0.5%
1.2%
1%
1.6%
2.1%
2.1%
3.3%
(Source: Revised Na�onal Power Development Plan VII)
4
RESOURCES IN VIETNAM Solar Resources
Wind Resources
VIETNAM NATIONAL TARGETS FOR SOLAR POWER Registered pipeline 17,000 MW 2018 11 MW
2020 850 MW
2025 4,000 MW
2030 12,000 MW
2017 10 MW 2013 1 MW*
Current status
National targets for solar power deployment * Installed capacity | Source: GIZ
VIETNAM WIND POWER TARGETS Planned Installed Capacity
2020
2030
5.6%
9.4% 6200 MW 5600 MW 2700 MW
2000 MW
1000 MW 500 MW Biomass Wind Other RE
Biomass Wind Other RE Other RE: Biogas, Waste -to-Energy, Solar PV/ST, SHP etc.
5
HYDROPOWER CAPACITY TARGETS IN VIETNAM Hydropower
2016
2020
2025
2030
17,000 MW
21,600 MW
23,400 MW
25,400 MW
Hydroelectric Pumping Total Electricity prod (%)
17,000 MW
1,200 MW
2,400 MW
21,600 MW
24,600 MW
27,800 MW
29,5%
20.5%
15.5%
COAL FIRED PLANT DEVELOPMENT MAP
6
PROGRAM - DAY ONE : 28 MARCH 2019, THURSDAY DAY ONE: 28 MARCH 2019 7:30AM
EVN 2019 Registration Begins Venue: Foyer of Lotus Ballroom, Ground Level, Rex Hotel Saigon, Ho Chi Minh City, Vietnam
8:30AM
Delegates Take Their Seats at Ballroom Venue: Lotus Ballroom, Ground Level, Rex Hotel Saigon, Ho Chi Minh City, Vietnam
8:30AM
Arrival of Distinguished Guests
8:45AM
Arrival of Guest of Honor
OPENING CEREMONY 9:00AM
Vietnamese Cultural Dance
9:05AM
INTRODUCTORY REMARKS YBhg. Datuk Abdul Aziz S.A. Kadir, Chairman, Confexhub
9:10AM
KEYNOTE ADDRESS AND LAUNCH OF EVN2019 CONFERENCE AND EXHIBITION:
9:35AM
Networking & Refreshments Break
PLENARY SESSION 10:30AM
PLENARY ADDRESS 1: WHY INVESTING IN VIETNAM: KEY ECONOMIC PRIORITIES AND FOREIGN INVESTMENT POLICY
11:00AM
PLENARY ADDRESS 2: BUSINESS STRUCTURE AND FINANCING – HOW DOES VIETNAM COMPARE TO ITS NEIGHBOURS
11:30AM
PLENARY ADDRESS 3: OPERATIONAL CONSIDERATIONS FOR FOREIGN INVESTED PROJECT COMPANIES IN VIETNAM – O&M STRUCTURING OPTIONS, LAND AND TAX CONSEQUENCES AND COMPLIANCE WITH EMPLOYMENT LAWS
12:00PM
Luncheon for Guest Speakers and Delegates
SESSION ONE: VIETNAM GOVERNMENT’S INITIATIVES IN PROMOTING THE POWER INDUSTRY 1:00PM
PAPER 1: AN OVERVIEW OF VIETNAM’S POWER MARKET
1:30PM
PAPER 2: VIETNAM COMPETITIVE WHOLESALE ELECTRICITY MARKET (VWEM): OBJECTIVES, MECHANISM & DIRECTION
2:00PM
PAPER 3: VIETNAM’S NEW FEED IN TARIFFS FOR RENEWABLE ENERGIES
2:30PM
Open Forum
SESSION TWO: POLICY, REGULATORY & FINANCING FRAMEWORKS FOR VIETNAM ELECTRICITY MARKET 2:40PM
PAPER 4: PUBLIC-PRIVATE-PARTNERSHIP FRAMEWORK FOR ENERGY PROJECTS IN VIETNAM
3:00PM
PAPER 5: FINANCING OPTIONS & RISK MITIGATION FRAMEWORK FOR ENERGY PROJECTS IN VIETNAM
3:30PM
PAPER 6: LEGAL PROTECTION AND INCENTIVES FOR FOREIGN INVESTORS & INTERNATIONAL PLAYERS
4:00PM
Open Forum
4:10PM
BUSINESS MATCHING SESSION
5:30PM
Foreign Investment Agency
Legal & Tax Consultancy
Ministry of Investment & Trade
Financing
End of Day One *This Program is subjected to change and for updated program, please logon on to www.electrifyvietnam.com Program @ 22 March2019
7
PROGRAM - DAY TWO: 29 MARCH 2019, FRIDAY DAY TWO: 29 MARCH 2019 ENERGY INVESTMENT BRIEFING FOR INVESTORS 9:30AM – 10:15AM • NUTS AND BOLTS OF MARKET ENTRY FOR RENEWABLE ENERGY IPPS - GREENFIELD, M&A AND JOINT VENTURES
10:15AM Open Forum: Comments, Questions and Answers 10:30AM Networking & Refreshments Break 11:00AM – 12:00PM • OPPORTUNITIES AND CHALLENGES OF RENEWABLE ENERGY BASED POWER PLANT IN VIETNAM • WIND ENERGY PROJECTS BRIEFING • SOLAR ENERGY PROJECTS BRIEFING
10:30AM Networking & Refreshments Break 12:00PM Open Forum: Comments, Questions and Answers 12:30PM Luncheon for Guest Speakers and Delegates 1:30PM – 2:30PM • VIETNAM HYDROPOWER: POTENTIAL, NEEDS & DEVELOPMENT PLANS • HYDROPOWER PROJECTS BRIEFING • CONSULTANT'S EXPERIENCE IN HYDROPOWER SECTOR IN VIETNAM
02:30PM Open Forum: Comments, Questions and Answers 03:00PM – 04:00PM • NATURAL GAS INDUSTRY OUTLOOK AND OPPORTUNITIES IN VIETNAM • PROJECTS BRIEFING
04:00PM Open Forum: Comments, Questions and Answers 04:30PM End of Day Two
*This Program is subjected to change and for updated program, please logon on to www.electrifyvietnam.com Program @ 22 March2019
8
THE EXHIBITION / SPONSORSHIP OPPORTUNITIES WHO SHOULD EXHIBIT?
THE EXHIBITION / SPONSORSHIP OPPORTUNITIES
This event is targeted for C Level execu�ves to discuss investment, partnership, new ventures and business growth strategies. Be part of the flagship event to: • Enhance your brand awareness • Demonstrate your thought leadership • Showcase your new products / services • Generate new leads and foster rela�onships • Establish industry goodwill
Contact us now to discuss customised sponsorship packages that will maximise your business opportuni�es T: +603 2771 1668 E: conference@confexhub.com
Silv er
Tita niu m Pla tinu m Go ld
SPONSORSHIP OPTIONS
Co ckt ail Lun che on Ref res tme nt Co n f Spe ere ak nce Co er Sesnfere sio nce Co n Bagnfere nce Co Kitnfere nce Lan yar d
• Investment & trade agencies • Investment banks & financial solu�on providers • Technology solu�ons providers • Legal, risk & advisory firms • Engineering, procurement & construc�on • Fuel suppliers & energy companies • Smart metering & smart grid solu�ons • Turnkey, renewable & alterna�ve energy technology & equipment • Solar technology & equipment • Plant equipment, maintenance, opera�ons & technology • Energy efficiency solu�ons • Power genera�ons and u�li�es • Independent power producers • Transmission & distribu�on infrastructure, networks & systems • Inspec�on & cer�fica�on • Energy storage solu�on providers • Project developer & consul�ng firms
Logo on Collateral Logo on A & P Material Logo on Backdrop & Signage Booth
12
6
6
6
sqm
sqm
sqm
sqm
5
3
2
2
2
2
2
2
5
5
5
5
5
5
Bag Insertion Token by GOH Special Recognition from Podium Conference Pass Exhibitor Pass
2
Speaking Slot Ad in Program Book Logo on Website Logo & Profile in Program Book Web Banner on www.confexhub.com B2B Meetings
9
5
5
5
5
5
5
OUR PAST ENERGY EVENTS PARTICIPANTS’ TESTIMONIAL ‘MGES was an excellent platform to meet government officials, local associations, international NGOs, technology providers, project developers etc. we hope to participate again in one of your conference soon.’
‘We’ve made signification step forward for our work in Myanmar after our trip attending and exhibiting at the Myanmar Green Energy Summit in early Aug.’
Sakura YAMASAKI Managing Director Singapore Solar Exchange Pte Ltd
Kees-Jan van Oeveren Head of Section – Principal Consultant – Clean Technology Centre Det Norske Veritas Pte Ltd
‘MGES is a good platform to generate leads and achieve business deals’
‘MGES is a good place to networking and understand the Myanmar’s energy sector’
David Cheah Marketing and Branding Manager Yingli Green Energy Singapore
Vivek Taneja Head of Business Development, Power Division Thermax Limited, India
‘Good platform that benefit the participants and offers very promising project prospects. Well done!’
‘I have learnt more about investing in Myanmar especially the potential and the investment opportunities in the green energy sectors’
Viktor E. Jakobsen Executive Director EAM solar
Vikkineswaran Supramaniyan Senior Manager Tenaga Nasional Berhad Malaysia
‘This is an extremely productive conference. I am glad to be part of it!’ Gauri Singh Director, Country Support and Partnership IRENA, United Arab Emirates
10
OUR PAST ENERGY EVENTS PARTICIPANTS
11
OUR PAST ENERGY EVENTS PARTICIPANTS
12
REGISTRATION FORM Title
Mr.
Mrs.
Ms.
Dr.
Others (specify) :_________________
Name (as per passport)* Name (to be appeared on
Email*
conference badge)
Passport No.
Date of Issue
D
D
/ M M
/
Y
Y
Y
Y
Country of Issue
Expiry Date
D
D
/ M M
/
Y
Y
Y
Y
Job Title* Company* Address* City/State
Postcode
Country Telephone*
Fax*
Mobile Number* *(Please include country and area code)
FEE PER DELEGATE
1-2 DELEGATES
3 & ABOVE
EARLY BIRD
USD 1,200*
USD 1,000*
NORMAL RATE (registration with FULL payment received before 1 March 2019)
USD1,400*
USD1,200*
(registration with FULL payment received before 1 February2019)
WALK-IN FEE
USD 1,800*
(registration with FULL payment received after 1 March 2019)
PAYMENT Full payment is required with your Registration Form before the Conference day. Tax-Receipt will only be issued upon receipt of full payment. *Conference registration fee includes lunch and refreshments. The Conference registration fee, however, does not include travel, accommodation and incidental costs. All payments should be made in USD ($) by credit card, telegraphic transfer or cash only. All registrations by fax or post MUST reach us before 1 March 2019, after which late registrations will be considered as "WALK-INs" and subjected to "WALK-IN" fee.
PARTICIPATION TERMS AND CONDITIONS Delegates may be substituted at any time, in writing, at NO extra charge. Cancellations received in writing before 1 March 2019 will be refunded, less a 100 USD administrative fee. Cancellations received thereafter are not refundable. Confexhub reserves the right to reschedule or cancel the conference, exhibition, cocktail reception, due to circumstances beyond their control and reserves the right to make changes to the conference program or speakers without prior notice. Should the event and all its related activities be cancelled, curtailed or adversely affected by any cause not within the reasonable control of Confexhub including but not limited to war, fire, national emergency, labor dispute, strike, lock-out, civil disturbance, Act of God, or non-availability of premises for any reason, Confexhub shall be under no obligation to refund all or part of the sums paid by the delegate in respect of his/her participation in the workshop. Confexhub shall be under no liability to the delegate or any other person in respect of any actions, proceedings, claims, demands, losses (including consequential losses), costs or expenses whatsoever which may be brought against or suffered or incurred by the delegate as the result thereof.
PLEASE COMPLETE AND FAX BACK TO +603 2771 1669 For en quiries, please contact at +603 2771 1668 or email: conference@confexhub.com 13
Cambodia Indonesia Laos Malaysia Myanmar Philippines Singapore Thailand Vietnam
Electrify Vietnam 2019 Secretariat c/o Confexhub Group Suite 1707, 17th Floor, Plaza Permata, No. 6, Jalan Kampar, off Jalan Tun Razak, 50400 Kuala Lumpur, Malaysia +603 2771 1668 +603 2771 1669 conference@confexhub.com www.confexhub.com
14