Site analysis
Volume analysis SITE: 23'*150'
ado
business
pkw
6t
h
y.
tourist
Mill Ave.
Sal
back alley
Rio
St
ve. A l il
.
M
UP
ROUGHLY AREA REQUIREMENT: 10000SFT
homeless University Dr.
23'
6t
h
150'
St
e. v A ill
.
M
Mill Ave.
resident
6th St.
student & faulcty
Concept diagram As the building needs go up, emphasize the vertical experience A open storage display entrance services for Mill Ave. 24/7
4th floor
coffee bar terrace
3rd floor
close storage
2nd floor
gallery
ground floor
basement
so, the new design need service for Mill Ave. 24/7
coffee education meeting room
gallery /event
15' 3"
16' 4"
13' 9" 12' 9 "
ceramic staircase
12' 9 " 17' 0"
roof garden gallery
library/ archive
18' 1/2"
13' 3"
office
loading studio
freight core light shaft and elevator
gallery
close storage close storage
N
11' 3"
gallery gallery
gift shop/ reception open storage
entrance / open storage
14' 0"
12' 2"
8' 7"
open storage entrance
garden class room
Patricia Sannit's art installation
event & gallery terrace 4F
Wayne Higby's art installation
library/ archive 3F 4th floor
3rd floor
entrance /open storage 1F
2nd floor
open storage BF ground floor
basement floor
classroom BF
Facade
60' 0" 49' 6" 43' 0" south wall
Mill Ave. 5th St.
EAST
plan
4F
3F
2F
1F
GF
N
N BF
ADE 512: Spring 2017 Core Architectural Studio II
Student: Yan Wang Instructor: John Meunier