The Bacon & Biondi Building was officially opened in a ribbon-cutting ceremony with students followed by a donor reception in the new Schonfeld Art Gallery, Katz Center, and Qin Library. Extreme generosity by donors and prudent cost oversight by the Board enabled the construction to be completed with no residual debt and no reduction in the endowment.
A Vision Becomes a Reality Capital Campaign Exceeds Goal “From start to finish, this project was managed collaboratively, conservatively, and with an eye toward the best possible future for Green Vale, educationally as well as fiscally. Your unprecedented generosity demonstrates deep appreciation for the role of this school in families’ lives.” — Hartley Rogers A New Gear Campaign Chair & Former Board President
4