Ag ron o my S c h e du l e February
June
•
• • •
Aerif y greens, tees and approaches, top dress with sand Feb 15-25
March
Needle tine greens and roll June 7 L ight top dress on the greens Apply wetting agents
•
July
April
• • • •
Pre -emerge golf course for summer weed control March 8 - 26 • Fer tilize fairways and tees
•
Preparation for the Huntsville Championship (Course closed April 25 - May 2) • Re -sod practice tees
May • • • • •
Aerif y greens with 1/4 inch core removal Top dress and apply amendments Fer tilize tees and fairways Sod remaining approaches with Tiff Tuff Complete sodding Tiff Tuff on 6 fair way
Needle tine greens July 19 L ight top dress on the greens Apply wetting agents Aerif y and ver ticut fairways and approaches July 19
August •
Aerif y greens with 1/4 inch core removal August 16 • Top dress greens • Ver ticut tees
Septemb er •
Ver ticut greens and top dress September 7 • Apply pre -emerge for winter weed control
43