Existing brick wall from assignment 1b
Box gutter fall towards lawn with overhang
Existing timber deck from assignment 1c
Roofing orientated to point view out across the site and to make the roof appear longer
Spandek sheet overhang of 50mm into box getter on each side Roof covering exposed portion of deck not shaded by trees
PARTIAL SITE PLAN
0
CL
Roof sheet cover width
25 1080
3960
0
CL
Post 1730
Purlin Spacing
0 30
0
15
0
25 5940
CLCL
700
3000
2
Purlin Spacing
Purlin Spacing
CLCL
section
1800
CL
Post
CL
Scale: 1:100
1800
4200
Fall
Galvanised steel roof sheeting with no powder coating to tie in with cream bricks and timber decking boards
30
Fall
1860
Fall
Roof aligned with left hand corner of deck
1375
6 Spandek metal roof decking sheets used
3000
Scale: 1:50
1
REFLECTED CEILING PLAN Scale: 1:100
N
Construction as Alchemy ARCH10002
CL CL 0
0
ROOF PLAN
60
60
CL CL
section
2017 Semester 2
Studio Leader: William Orr Studio: 8
Name: Thomas Martiniello Student Number: 834 955
Part 1D : Steel Shelter
D1
C150 Purlin
CL
CL
300
250x100mm box gutter with support board
C150 Purlin used as edge treatment to conceal purlin ends
2 degree fall in box gutter as per AS3500.3 Overhanging roof sheet to minimise water penetration
1375
180 UB16 Steel Beam Welded joints
15 0
600
8 degree pitch
0.42mm BMT Spandek
Overhanging Box Gutter
8 degree pitch
89x89x5 SHS
2400
250 PFC
Drip on box gutter to stiffen edge and prevent capillary action
89x89x5 SHS
180 UB16 Steel Beam
MGP12 35 x 90mm Timber Decking Boards F14 175 x 75mm Timber Bearers
F14 150 x 50mm Timber Joists
F14 100 x 100mm Timber Stumps
510
500mm diameter x1200mm concrete column footings
150 Ground line
SECTION 1 CUTTING ACROSS THE PURLINS Scale: 1:20
Construction as Alchemy ARCH10002
2017 Semester 2
Studio Leader: William Orr Studio: 8
Ground line
SECTION 2 CUTTING ACROSS THE STEEL UB BEAM Scale: 1:20
Name: Thomas Martiniello Student Number: 834 955
Part 1D : Steel Shelter
400 x 400mm Concrete Pad Footing
D2
Orientation of roof sheeting to match timber decking boards
3D HERO VIEW 250PFC used to conceal end and create a clean edge with a clean shadow Edge treatment used to create a clean and simple lines
x4 roofing screws used per sheet in pan/ valley to secure to purlins
Tapered beams to reduce the overall appearance of the roof thickness helping it to appear as if it floats
Fall in box gutter away from deck and wall
Box gutter brackets used to attach box gutter to purlins
Front post 2830mm tall from deck level
Steel posts align with center of decking boards which have been cut around the posts
Back post 2400mm tall from deck level
PERSPECTIVE 1 C150 Purlin
Exposed soffit to showcase the use of steel
Z150 Purlin C150 Purlin 250PFC
C150 Purlin
500mm diameter x1200mm concrete column footings
3D HERO VIEW
Construction as Alchemy ARCH10002
89x89x5 SHS Steel Posts at 3000 Centers
PERSPECTIVE 2
2017 Semester 2
Studio Leader: William Orr Studio: 8
Name: Thomas Martiniello Student Number: 834 955
Part 1D : Steel Shelter
D3