tim Allen Pro Pe rt i eS
“fill Your DreAmS BY tHe SeA”
A e r i a l v i e w o f lo t
o c e a n v i e w f r o m lo t
“ Fi l l Yo u r D r e a m s by Th e S e a” 3180 Seventeen M ile Drive, PEbble Beach
Inspiration only comes from what one’s imagination can picture, from what the mind conjures up as a dream or as a fantasy. To find real inspiration there must be a stimulus and it is here, along Pebble Beach’s fabled 17 Mile Drive that you will find all the inspiration you will need. Here, on one of the last vacant parcels to become available for sale, here on a spacious two acres of precious land fronting the mighty Pacific, here as the waves crash on the shore and the sun sets over the far horizon and the otters bob in the surf, here is the ultimate when it comes to true inspiration. So, dream your dreams, think your thoughts but when you are ready for inspiration, come and…fill your dreams by the sea. Offered at $9,995,000 Presented by Tim Allen Coldwell Banker Del Monte Realty
by t h e s e a
t h e lo t
the view
d r i v e w ay u p
lo t v i e w
pa r c l e m ap
Co n cept ua l d r aw i n g
pa r c l e m ap
co n cept ua l d r aw i n g
p e bb l e b e a c h m ap
PLANNING PERMIT TIMELINE
Item 8
Project Analysis Consultants Work Pebble Beach ARB Initial Planning Submittal Planning Review County Hearing Appeal Period Planning Final Approval
Total
Timeline Total
Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Item 7
ERIC MILLER ARCHITECTS, INC.
co n cept ua l d r aw i n g
1 month 1.5 month 1 month 0.5 month 5.5 month 0.5 month 1 month 0.5 month 11.5 months
A/E FEES for PLANNING PHASE
10/3/12
.
000-000-000 ARCHAEOLOGICAL
$
800
SURVEY
$
2,200
SURVEYOR CONSTRUCTION STAKING
$
- Future
SURVEY WORK DURING CONSTRUCTION
$
- Future
GEOTECHNICAL
$
3,250
FIELD TEST DURING CONSTRUCTION
$
BIOTECH REVIEW
$
2,300
ARBORIST REPORT
$
1,800
FORESTER MANAGEMENT
$
2,200
STORY POLES
$
2,500
LANDSCAPE ARCHITECT
$
- TBD
CIVIL
$
- Future
STRUCTURAL
$
- Future
MECHANICAL
$
- Future
ELECTRICAL
$
- Future
ARCHITECT'S FEE PLANNING PHASE
$
- TBD
ARCHITECT'S CONSTRUCTION DOCUMENTS
$
- TBD
A/E FEES SUBTOTAL
$
REIMBURSABLE
4% $
- Future
15,050 - TBD
$
15,050
PEBBLE BEACH ARCHITECTURAL REVIEW
$
8,000
WATER PERMIT
$
1,000
SEWER CAPACITY
$
1,200
SCHOOL
$
3,381
PARKS & RECREATION
$
1,000
PB WATER ENTITLEMENT
$
- by owners
WATER PERMIT (PB ADDT. PURCHASE )
$
-
TRAFFIC IMPACT
$
1,500
TANCE FEE
$
3,000
PG&E
$
1,250
PLANNING PERMIT
$
9,325 estimated
COASTAL
$
- TBD
BUILDING PERMIT & PLAN CHECK
$
- Future
AGENCY & PERMIT FEES TOTAL
$
A/E FEES GRAND TOTAL
AGENCY & PERMIT FEES
Pebble Beach, California
Note: Fees are estimated only, to be confirmed.
ERIC MILLER ARCHITECTS, INC.
29,656
tim Allen Pro Pe rt i eS
Dre# 00891159 | cell: 831.214.1990 w w w.t i m A llen Pro Pert i eS.co m