Stakeholder Register AIT Waste Water Treatment System


AIT Waste Water Treatment Facility: Stakeholder Register

Document History Version

Description

Date

Author

Checked

Number

1

Original

31/01/13

i

NMcH, SP

LM


AIT Waste Water Treatment Facility: Stakeholder Register

Table of Contents Document History............................................................................................................................... i 1.0

Stakeholder Register ............................................................................................................. 1

Sponsor Acceptance ........................................................................................................................... 2

ii


AIT Waste Water Treatment Facility: Stakeholder Register

1.0

Stakeholder Register

Date:

31/03/13

Project Name:

Waste Water Treatment Plant

Project Phase:

Initiation Stage

Name of Stakeholder

Role in Project AIT as the client will inform the consultant what they require. The consultant

AIT

will communicate with AIT as the project develops.

Student Union

Inform students of works being carried out on site.

Athlone Town

The Town Council will inform Westmeath C.C that AIT will be discharging the

Council Westmeath County Council Department of Education Department of Finiance EPA

treated effluent into the mains. Westmeath C.C will have to give permission to AIT to discharge the treated effluent into the mains. The Department of Education will have to provide a grant for the Waste Water Treatment Plant. The Department of Finance will have to provide money towards the Waste Water Treatment Plant. Treatment of the Waste Water leaving the plant. The suppliers role in the project will be to provide a quality product and that

Suppliers Local Residents TNLS Consultancy

it will be available to provide assistance if needed on the project. Obtain permission from the local residents so the WWTP can proceed. TNLS will provide info to AIT about what is happening on site. Get in contact with the other stakeholders and maintain communication with them for the duration of the project.

1


AIT Waste Water Treatment Facility: Stakeholder Register

Sponsor Acceptance

Approved by the Project Sponsor:

____________________________________________ Project Sponsor: AIT