Tom Wakeman University Portfolio

Page 1

T O M WA K E M A N BSc/MArch

S ele c t i on of Works


About me I am trained in the field of Architecture and design, currently holding a BSc in Architecture, and completing my MArch at Cardiff University My most recent experience includes working with an award-winning Architectural firm, Vicente Burin Architects, in Fairfield Connecticut, USA as a design intern Previously, I have worked with a prestigious property development firm, Portfolio Homes as a design coordinator, as well as getting my hands dirty at a local construction firm, both based in my hometown of Sevenoaks, Kent, UK Particular interests and research areas include: Architecture and interior design, graphics & media, lifestyle & photography and industrial design I love working on screen as much as I love working with my hands, for me, my biggest joy in life is getting to work, picking up tools and getting stuck in with a project



SELECTION OF WORKS A glimse into my work in Architecture and Design, and some of the people and places that have inspired me an



CURATED HIGHLIGHTS FROM WSA BSc & MArch PROGRAMME EXHIBITIONS















ETREAT CENTER

ies, ent ing will ual ion tal, f3

nce ses ften xisree rial enese den the

to the rly ge, ya ing nd

hip ing e as ing

d of nts raan

ong the rge ate

This tes ver er’s

nd the ian mnal nd ing

Main proposal cross section, showing all main spaces (facing South-East toward Aberdare Hall)

PRODUCED BY AN AUTODESK Column TerraceSTUDENT PRODUCT ramp to parking lot

Construction traffic

70 83

footpath

Floor 0 Music Library & dorms

Parking Lot

0 84 25

patio

boundary wall

vehicular access

Residential homes and yards

library and dorm entrance

07 33

9 82 13 00 94

demolished 60's block

implied facade boundary

34 92

arched connecting 'bridge'

School of Music

archway

90 21

Parking lot and turning Basement access and oil tank

Commercial Kitchens

Girls Dorm entrance

entrance

30 88 offices

boundary wall

Aberdare Hall

89 31

2 38 31 0 91 26

Queen Anne Square

entrance

formal entrance

Corbett Road lawns

PRODUCED BY AN AUTODESK STUDENT PRODUCT

61 37

Substation

0 77 51

1 03 34

En

HVA

Gro land eco

North

footpath

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

garages

Clad (per sust cred


nvironmental and Services Cost Breakdown: Precedent Estimates Precedent Estimates Environmental and Services Cost Breakdown:

AC system

oundworks/ dscaping/ ology

dding rformance/ tainable dentials)

Build costCost estimation: REVISED Estimate

Greyfriars Community Build cost estimation: Preliminary CostCentre, Estimate Edinburgh Multifaith Centre Proposal (Services/environmental 20% overall

(Services/environmental 23% overall build cost excluding eco cladding/roof build cost-excluding eco cladding/roof design) design) 750m2 2 1000m

St AndrewsCommunity Church, Devon Greyfriars Centre, (Services/environmental 25% overall Edinburgh build cost excluding eco 20% overall (Services/environmental cladding/roof design)eco cladding/roof build cost excluding 861m2 design) 2 750m Total: £1,555710

Henley College St Andrews Church, Devon (Services/environmental (Services/environmental13% 25% overall overall buildexcluding cost excluding build cost eco eco cladding/roof cladding/roofdesign) design) 1019m 861m22

Henley College (Services/environmental 13% overall build cost excluding eco cladding/roof design) 1019m2

Heat Pump, Thermal store, HVACMVHR, system Heat pump, Thermal store, ducted delivery MVHR, associated £200,000 280,000

Gas DHWstore, boiler, Radiant Heat Pump, Thermal MVHR, Underfloor Heat, secondary ducted delivery

Underfloor boilerRadiant Heat Pump,Heating, Gas DHWgas boiler, Underfloor Heat, secondary £126,570 secondary ventilation,

Underfloor Heating, gas boiler Gas heating, £89,500 secondary ventilation, £126,570

Gas heating, £89,500

Soft landscaping, sunken garden, Groundworks/ Extensive soft landscaping, paving, associated trees and planting, decking/walkways, carlandscaping/ park decking/ patio, bike storage, existing ecology levelling/reinstatement, walldemolition/levelling, removal demolition andasbestos bike storage/lighting, (major site works & basement demolition of existing building and excavation included in substructure asbestos removal (demolition estimates)

Extensive excavation/site works, hard landscaping: paving, minimal hard retaininglandscaping walls, metal(some railings, landscaping) services, drainage, site lighting, cycle £299,000 shelter, demolition of existing buildings £148,000

Paving, timber brick retaining Extensive harddeck, landscaping: paving, wall, timberwalls, fencing, landscaping, retaining metal railings, services, and alterations services,drainage drainage, site lighting, cycle toshelter, existingdemolition £285,000 of existing buildings £148,000

Paving, timber deck, brick retaining wall, timber fencing, landscaping, services, drainage and alterations to existing £285,000

£400,000

Extensive soft landscaping,works, paving, excavation/site decking/walkways, park hard minimal landscapingcar (some levelling/reinstatement, wall landscaping) demolition £299,000 and bike storage/lighting, demolition of existing building and asbestos removal (demolition material reused on site for carpark levelling

£400,000

Sustainable products and systems: Cheap, economical cladding material: Cladding Cedar shingle cladding & roof; 34kW high environmental performance, low (performance/ PV array; low-grade UK spruce maintenance costs, large surfacebox area sustainable frame with SIP system, high perforcladding (no direct sunlight), high credentials)

Black standing seamcladding metal cladding, Cheap, economical material: low surface area (sandwiched high environmental performance, low between existing buildings). Low area maintenance costs, large surface maintenance, medium sustainability cladding (no direct sunlight), high

Facingstanding brick, render, walling. Black seam curtain metal cladding, Plastic clad timber pitched roof; low surface area (sandwiched glazing. Double aluminium between existingglazed buildings). Low windows, poormedium sustainability maintenance, sustainability

Multifaith Centre Proposal

Services, mechanical & sustainable (Services/environmental 23% overall products (including frame & external build cost-excluding eco cladding/roof walls) reflected as 50% total build cost

design)

2 1000m 1000m2

Total: £1,511026

Total: £2,679550 Total 3,300000 (for review) Total: £2,679550

material reused on site for carpark

£350,000 levelling

£200,000 ventilation, £199,000

Total: £1,511026

ventilation, £199,000

Total: Total:£1,508373 £1,555710

Red cedar dadorender, walls with block Facing brick, curtain walling. above; boarding, Glasroc Plasticcedar clad timber pitched roof; with render and Kalwall curtain glazing. Double glazed aluminium walling. Curved flat Glulam windows, poorand sustainability

Greyfriars Community Centre, Edinburgh (Services/environmental 20% overall build cost excluding eco cladding/roof design) 750m2

Total: £1,511026

Total: £1,508373

Red cedar dado walls with block above; cedar boarding, Glasroc with render and Kalwall curtain walling. Curved and flat Glulam

Total cost

Cost per m2

St Andrews Chur Devon (Services/enviro tal 25% overall b cost excluding ec cladding/roof de 861m2

Total: £1,555

%

Total cost

pe

1 Substructure

£67,805

£90

4%

£99,801

£

2 Superstructure

£473,283

£631

31%

£602,335

£

3 Finishes

£84,888

£113

6%

£106,769

£

4 Fittings and Furnishings

£15,341

£20

1%

£23,723

£

5 Services

£299,793

£399

20%

£389,345

£

6 External Works

£299,066

£398

20%

£148,872

£




















Floor area = 150m2 (1500ft2) Typical 220m2 oak frame house = 800ft3 timber (50 trees) Typical 150m2 oak frame = 550ft3 timber (30 trees)). 150m2 efficient oak frame =200ft3 timber (10 trees) = 65% less timber

26 x 1.5m sonotube pile footings

20ft3

20ft3

20ft3

20ft3

20ft3

20ft3

20ft3

20ft3

20ft3

20ft3

=200ft3

16 x (2”x1”) x 10 8 x (2”x6”) x 10 16 x (2”x4”) x 10 34 x (4”x1) x 10

~20ft ~1ft3

10 trees





1. INDUSTRIAL 2 . E D U C AT I O N 3 . A C C O M M O D AT I O N 4. LIVE-WORK UNITS 5. TIMBER STORAGE 6. LIBRARY

1

3

2

4

S I T E S C H E M AT I C

5

6





PROFESSIONAL DESIGN Work for Vicente Burin Architects & Po r t f o l i o H o m e s P L A N S , E L E VAT I O N S & C G I ’ S n

































Timber Decking

Larder

brooms

Laundry

work area Dryer

Washer

Living

svp between studs svp

900 Fridge

Kitchen/breakfast

Recessed fire/tv above svp between studs

Bureau

300mm Bookcases

svp

Coats / Boots

garage

Dining

WC

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT Coats / Boots

svp between studs

Study / library

svp

svp

svp between studs

Porch Scale 1:100























PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT GYM

Plant/mechanical Games Room svp

Wine celler

Store Sauna / Shower / Steam Room

Cinema Room

Proposed Basement Plan Scale 1:100

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Proposed Ground Floor Plan

N


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

600mm CH

600mm CH window seat

cleaning supplies, towels

window seat

600mm CH

cleaning supplies, towels

600mm CH

window seat

window seat

1500mm CH closet

closet

closet

2000mm CH 2400mm CH

2400mm CH

Bedroom 4 RL

Ensuite

Ensuite

Bedroom 3

800x1200 shower

Bedroom 2

Master Bed 1

800x1200 RL shower

closet 800x1200 shower RL RL

Family Bath

Gallery Landing

800x1200 shower

RL

mirror

niche 800x1600 shower

full-height mirror

800 glass screen

2400mm CH RL

closet

Bedroom 5

Ensuite

2400mm CH

2400mm CH

2000mm CH

2400mm CH

Master Bath

2000mm CH

void closet

closet

1500mm CH

1800 free standing bath

600mm CH

cleaning supplies, towels

cleaning supplies, towels

600mm CH

600mm CH

Proposed First Floor Plan Scale 1:100

svp under floor

mirror

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


600

1690

3295

300

CONSERVATORY

500

2090

LIVING 818

UTILITY 1200

900

oven

fridge/freezer

45 300

600

oven

WC

HALL STUDY

TV ROOM

STORE

GARAGE

GROUND FLOOR PLAN

0

1:50@A1

1

5m

FIR

0

1:50@


BED

ENSUITE

BATHROOM

BED STORE

BED

BED

DRESSING

Electrical Legend Single socket outlet located 450mm (underside) above ffl

Double socket outlet located 450mm (underside) above ffl

Permanent wired, fused & switched spur with indicator light connected to low level unswitched socket outlet (except immersion which is to be wired directly to heater) IH-Immersion WM-Washing Machine DW-Dishwasher FF-Fridge Freezer TD-Tumble Dryer WD-Washer Dryer

5A lighting circuit socket outlet located 450mm (underside) above ffl Cooker Control Panel Single switched socket outlet located 150mm above work surface

ENSUITE

Double switched socket outlet located 150mm above work surface

Gridswitch controlling kitchen appliances via low level unswitched socket outlet as indicated

Television aerial jackpoint - TV/FM or C-Cable TV - located 450mm (underside) above ffl

Electricity consumer unit (located at high level)

Master telephone point located 450mm (underside) above ffl Telephone junction box/point located 450mm (underside) above ffl

Shaver socket/point Door bell External water tap

Light switch switched one way located 1050mm above ffl Gas point Light switch switched two way located 1050mm above ffl Light switch switched three way located 1050mm above ffl Dimmer switch located 1050mm above ffl Down lighter (to accord with RD's as appropriate) Down lighters to be no nearer than 900mm apart. Pendant Light (LE denotes Low Energy Bulb) Fluorescent strip light with plastic diffuser Wall light External wall light - PIR indicates passive infra red fitting

FIRST FLOOR PLAN

0

1:50@A1

1

5m

Note LE alongside symbol indicates fitting that will only accept compact flourescent lamps in accordance with Table 4 ADL1 of the Building Regulations

Extract fan isolation switch located above door outside Bathrooms/Wc's etc. or at high level near fan in Kitchen ( Switch to be centred above WC / Bathroom doorway ) Spur plate above overhead kitchen cupboards for under-cupboard lights

Door entry phone speaker door release

Note: Three in every Four fixed light fittings should be energy efficient

Alarm key pad panel Ionisation Smoke detector Mains operated smoke detectors and sounders, interconnected with battery backup and wired to AOV at head of stairs. Installed in accordance with BS: 5446: Part 1 or BS: 5839-6: 2004 to an LD2 standard Optical Smoke detector Mains operated smoke detectors and sounders, interconnected with battery backup and wired to AOV at head of stairs. Installed in accordance with BS: 5446: Part 1 or BS: 5839-6: 2004 to an LD2 standard Heat detector Mains operated heat detectors and sounders, interconnected with battery backup. Installed in accordance with BS: 5446: Part 1 or BS: 5839-6: 2004 to an LD2 grade D standard. Positioned not within 300mm of any light fitting or wall. Carbon Monoxide detector Mains operated heat detectors and sounders, interconnected with battery backup. Installed in accordance with BS: 5446: Part 1 or BS: 5839-6: 2004 to an LD2 grade D standard. Positioned not within 300mm of any light fitting or wall.








PRODUCED BY AN AUTODESK STUDEN

rain downspout to permeable grade

Stormwater soakaway

Garage 26 m²

New 125 Insulated ext Stud Wall

Closet 1 m²

New annex Porch 3 m²

Annex Bed 1 10 m²

New Exterior Porch 2 m²

rain downspout to permeable grade

new rain downspout gully

Demo

Gas main

Existing door filled in

Boiler 1 m² Annex Bed 2 10 m²

Panelled opening (18x80mm mdf panelling)

Pan ope (18 md

Soil pipe to ensuite above ceiling void RSJ above opening

Demo

Family Room 21 m²

Hall 18 m²

Annex Living 27 m²

Demo

Tank New step running around entire plinth

Demo New SVP in closet Window filled in

DN SVP

Brooms 0 m²

Manifolds, CU 1 m²

Demo Demo

new rain downspout gully

New 125 Insulated ext Stud Wall w/ councealed cistern

WC 1 m² Demo

DN Foul run tees up to behind WC new rain downspout gully

Demo

Grey Gully

Annex Kitchen 7 m²

Bath 4 m² oven

Pull-out larder

Dryer

DN

1000 American Fridge Freezer new rain downspout gully

K 2

New foul run through kitchen floor

Washer Brooms

Pull-out larder

Stub

Oven

Utility 5 m²

DN

New door to utility

Grey Gully

SVP

new rain downspout gully New French Doors in place of window?



 Stormwater soakaway

BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

Demo


NT PRODUCT

Manor Lodge 77 Pilgrims Way Otford TN14 5JH

No.

White symmetrical 900 Georgian bar door with two 300 Georgian bar sidelights

Description

Date

Ground 1:50 First 1:50 Site 1:200

PRODUCED BY AN AUTODESK STUDENT PRODUCT

1 of 3 2 of 3 3 of 3

nelled ening 8x80mm df panelling)

Porch roof removed

Door removed, wall filled in with matching window to left

Existing Combined Gully

Dining/Den 15 m²

Understairs Cup'd 1 m² Demo

Study 6 m²

Portfolio Homes Manor Lodge Version 1

Opening narrowed

SVP Existing Combined Gully

Date

May 2014

Drawn by

Wakeman

Scale

1 : 50

Existing Inspection Chamber











14/05/2014 14:08:28

1 of 3 Ground Floor

Kitchen 27 m²

PRODUCED


PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDEN

Ensuite 4 m²

Closet 3 m²

Hall 9 m²

Closet 1 m²

Bedroom 2 8 m²

Master Ensuite 3 m²



 BY AN AUTODESK STUDENT PRODUCT


NT PRODUCT

Manor Lodge 77 Pilgrims Way Otford TN14 5JH

No.

Description

Date

Ground 1:50 First 1:50 Site 1:200

PRODUCED BY AN AUTODESK STUDENT PRODUCT

1 of 3 2 of 3 3 of 3

Bedroom 3 13 m²

Portfolio Homes Manor Lodge Version 1

Master Bath 6 m²

2 of 3 First Date

May 2014

Drawn by

Wakeman

Scale









1 : 50



14/05/2014 14:10:55

Master Bed 14 m²

PRODUCED




URBAN FRAGMENT D I S C O V E R I N G A LO S T C I T Y Location: Bristol, UK. Slave Trade Museum Proposal


on:

3.Bristol Redcliffe Concept Dev























repa eparratio

Thomas Wakeman.Year 3.B


INTERIOR DESIGN INDEPENDENT PROPERT Y PROJECTS I N T E R I O R P H OTO S houzz.com/uk/pro/tom-wakeman









SATURDAYS G R A P H I C D E S I G N & P H OTO G R A P H Y “Not all those who wander are lost”


L0CAL

4

INSPIRED BY LOCAL COMMUNITY AND DESIGN












CONSTRUCTED PROJECTS IN TIMBER Studio in the Woods and Big Span







THESIS HOUSE OF STICKS Featuring the buildings and people of the outer Cape



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.