2018 ANNUAL STREET MAINTENANCE
2017 ASM RECAP
• • • •
CURB & SIDEWALKS
Remove and Replace Existing Concrete Sidewalk
SY
Remove & Replace Barrier Free Ramp
EA SY SY
Block Sod Along Disturbed Roadways/Sidewalks Remove and Replace Curb & Gutter 6"x6" curb w/ 12" gutter
2,200 4 980 1,000
CRACK SEALING
Crack Seal Concrete - Grey Sealant (includes routing & backing cracks prior to sealing)
LF
38,740
PROPOSED 2018 ANNUAL STREET MAINTENANCE
March 27th – Council Budget Work Shop March 30th & April 6th, April 13th – Advertise April 20th – Deadline April 23th – Close Bids May 1st – Council Approval May 11th – Pre-con May 14th – Notice to Proceed
CONCRETE PANEL REPLACEMENT CURBS & SIDEWALKS CONCRETE LIFTING CRACK SEAL CHIP SEAL ASPHALT REPAIR & OVERLAY
ASPHALT REPAIR & OVERLAY
ASPHALT REPAIR & OVERLAY
LEVEL UP – UNEVEN AREAS CRACK SEAL MAJOR CRACKS APPLY TACK COAT ADJUST ASPHALT AT DRIVEWAYS AS NEEDED APPLY 2” OVERLAY BACKFILL EDGES