1 minute read

Case Study

Next Article
Case Study

Case Study

Case Study 4 Shopping Centre WC’s Brent Cross

Client Hammerson Ltd Project Architect Workman Project Period 9 weeks Project Value £850,000

Works on this project involved the complete strip out of male and female WC areas in addition to disabled and baby changing areas.

We refurbished the newly stripped out areas with new cubicle installation as well as the associated M&E services, including the electrical installation of LED modular lighting and LED feature lighting to the mirrors and wash troughs.

The aim was to create very high quality and modern WC facilities for our client. We achieved this by using high specification glass cubicles and panelling, along with high standard infra-red wash stations, porcelain tiles to the walls and floors and solid stone wash troughs throughout.

This article is from: