![](https://assets.isu.pub/document-structure/210511115006-1c1a5909afa7257c1a022211ada13f8b/v1/78bde03af5ea79f814544888d3a7e117.jpg?width=720&quality=85%2C50)
1 minute read
Case Study
![](https://assets.isu.pub/document-structure/210511115006-1c1a5909afa7257c1a022211ada13f8b/v1/b5d4b0e531a5efd92a8a52da8ded19af.jpg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/210511115006-1c1a5909afa7257c1a022211ada13f8b/v1/3f236a404b3209d93e3cc33298d11d52.jpg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/210511115006-1c1a5909afa7257c1a022211ada13f8b/v1/7ebaf1b49c8cc0ae59a9b9d7f9db7cd2.jpg?width=720&quality=85%2C50)
As part of the contracted works we created two disabled WC areas including complete re-configuration in order to comply with Part M of building regulations.
1 minute read
As part of the contracted works we created two disabled WC areas including complete re-configuration in order to comply with Part M of building regulations.