Client BMO Real Estate Partners Surveryor MGP Shreeves LLP Architect Hale Brown Architects Project Period 15 weeks Project Value £830,000

Works on this project involved office refurbishment to the first, second and fourth floors.

The project consisted of new office fit-out and decoration, supply and install of new furniture to the fourth floor, new toilets and shower area, a new air conditioning system, new electrics and lighting, installation and refurbishment of parquet flooring and new MF ceilings.

In addition to the office refurbishment, we also completely refurbished the reception and common area staircase and assisted with external decorations to the front and rear.

We also helped with the major overhaul of the existing lift within the property.

Case Study 6 Capital City College Group Malborough & CBAT Buildings Islington

Client Capital City College Group Surveyor/ Project Manager Wellesley Construction Services Limited Project Period 6 weeks Project Value £510,000

This short project involved the office remodelling and refurbishment of both Marlborough House and CBAT Buildings.

The fit-out consisted of demolition to internal walls and ceilings, creation of a brand new office layout and internal decoration.

New doors, partitions and screens were added along with new staff kitchen facilities, new air conditioning, a new fire alarm system, renewal of electrics and the addition of suspended ceilings.

Case Study 7 Newham College of Further Education Stratford Campus

Client Newham College of Further Education

Surveryor/ Project Manager Wellesley Construction Services Limited Project Period 6 weeks Project Value £205,000

Works on this project consisted of new roof works to engineering block work shops, addition of liquid applied membrane roofing and alterations to roof outlets and rainwater pipes.

Other works included re-routing power supplies and installing new lighting, power, data and suspended ceilings.

In addition we also completed internal decorations including adding new floor finishes and carpentry works.

We undertook the refurbishment and fit-out to joinery workshops and the mortar batching room.

Case Study 8 Unit 3, Trident Industrial Estate Hoddesdon

Client Royal London Asset Management

Surveyor/ Project Manager HartDixon Project Period 10 weeks Project Value £300,000

This project consisted of the refurbishment of a commercial unit on an industrial estate in Hoddesdon.

The works included a total roof replacement, exterior cladding and window replacement and all new heating and electrics.

As well as external refurbishment, internal works consisted of refurbishment and decoration of the offices and toilets and redecoration of the factory floor.

Case Study 9 Peacock Theatre London

Client LSE - Peacock Theatre Surveyor/ Project Manager Mortimer Isaacs Consultants Project Period 4 weeks Project Value £100,000

Our involvement in this project included the refurbishment of the dress and stalls bar areas.

We sanded and polished the floor to the dress bar and added a whole new floor to the stalls bar. Brand new lighting was added to both areas as well as new internal decorations.

Case Study 10 Newham 6th Form College Newham

Client/Surveyor/ Project Manager Newham 6th Form College Project Period 6 weeks Project Value £150,000

Works of this project involved the refurbishment of the Old Library Building at Newham 6th Form College.

We completed a lot of work in the short project period including stripping out the space ready for the construction of stud partition walls to form new office space.

Other works included installation of new LED lighting, as well as floor to ceiling glazing panels and screens and installation of suspended ceilings.

Internal decoration consisted of new ceiling tiles, carpets, doors and ironmongery and the decoration of coloured feature walls.

Case Study 11 Lancashire Court Mayfair

Client HartDixon on behalf of their client Royal London Project Period 12 months Project Value £575,000

This complete refurbishment of an old property, resulted in two beautiful, two-bedroom apartments above a first-floor retail space. Quality was of the utmost importance throughout to fit in with Mayfair’s renowned reputation.

Included in the refurbishment was a new kitchen and bathrooms with high-quality joinery throughout the residential units and a new shop frontage to the retail area.

Due to the size of the rooms and the government restrictions regarding the pandemic, it meant we were only able to have two employees on the site at one time, causing the completion time to extend further than we had hoped.

We carried out this renovation on behalf of our client, HartDixon, a building surveyors who were fulfilling the wishes of their client, Royal London, who own the property.