1. 3 OEI TIONG HAM PARK

|

PG 03 - 37

2. 7 JALAN SENANDONG

|

PG 39 - 53

3. CALVARY BAPTIST CHURCH

|

PG 55 - 57


1. 3 OEI TIONG HAM PARK

THIS IS A 2-STOREY DETACHED DWELLING (GOOD CLASS BANGALOW) WITH A BASEMENT AND A SWIMMING POOL. THE FACADE IS MAINLY COMPOSED BY FORMLINER AND TEXTURED PAINTED WALL, WHICH ENHANCED BY WOOD GRAIN ALUMINIUM CEILING & WINDOW HOOD.

3


FRONT BOUNDARY WALL IN SESAME BLACK GRANITE 20MM THK GRANITE COPPING (20MM PROTRUDING FROM BOUNDARY WALL)

30MM GROOVE LINE

HOUSE NUMBER IN METAL PLATE W/ CONCEALED LIGHTING

FRONT BOUNDARY WALL ELEVATION EACH GRANITE MODULE HAS BEEN PLANNED AND LABELLED ACCORDINGLY

FINE JOINT LINE BETWEEN GRANITE PANEL

HOUSE NUMBER W/ CONCEALED LIGHTING IN METAL PLATE

FRONT BOUNDARY WALL AS BUILT CONDITION 4

HOUSE NUMBER W/ CONCEALED LIGHTING


FORMLINER WALL

FORMLINER WALL WORKING DETAIL

FORMLINER WALL DURING CONSTRUCTION

FORMLINER WALL PREPARATION WORK

KEIM CONCRETAL-LASUR-SYSTEM IN DIFFERENT DILUTION LEVELS

FORMLINER WALL COMPLETE CONDITION

5


RUSTIC YELLOW FEATURED WALL & MAIN ENTRANCE DOOR

15U WALL MOUNT RACK 600(W) X 600(D) X 769(H)

15U WALL MOUNT RACK 600(W) X 600(D) X 769(H)

30

WM/ DY 600MM x 600MM

MAIN DOOR

40

30

30

WM/ DY 600MM x 600MM

20 20

50

30

50

40

30 30

25

25

25

25 6MM THK METAL PLATE

SSPL IN PATINA 1:40 COATING @ A3 1 APRIL 2021@ A3 SSPL 1:40 1 APRIL 2021

RUSTIC YELLOW FEATURED WALL (IN NATURAL SPLIT)

CORNER STONE

PLAN VIEW

FOLD LINE FOLD LINE

ELEVATION VIEW

6

24 x 52 rectangle hole for steel hollow 24 x 52(see rectangle section hole for steel illustrationforhollow side section (see on) gate to anchor illustration- for side gate to anchor on)

TBC TBC


RUSTIC YELLOW FEATURED WALL & MAIN ENTRANCE DOOR

RUSTIC YELLOW WALL AS-BUILT CONDITION

FRITS JURGEN M+ PIVOT HINGES SYSTEM

SOLID CORE TIMBER DOOR

120MM WIDTH SOLID TEAK STRIP

7


SWIMMING POOL & JACUZZI POOL

SWIMMING POOL PLAN - PUMP ROOM & BALANCING TANK

SWIMMING POOL SECTION - UNDERWATER LIGHT & DRAIN SUMP

SWIMMING POOL SECTION JACUZZI POOL, PUMP ROOM & BALANCING TANK 8

UNDERWATER LIGHT LUMASCAPE LS333ANS-2LED


SWIMMING POOL & JACUZZI POOL

SWIMMING POOL - AS BUILT CONDITION SWIMMING POOL JACUZZI AS BUILT CONDITION (RIGHT)

SWIMMING POOL - AS BUILT CONDITION 9


SOLAR PANEL @ ROOF

EIGEN SOLAR PANEL (PLAN VIEW)

EIGEN SOLAR PANEL (ELEVATION VIEW)

10

EIGEN SOLAR PANEL INSTALLATION METHOD ON RC ROOF


SOLAR PANEL @ ROOF

EIGEN PV SYSTEM

EIGEN PV SYSTEM INVERTER INSTALLATION LOCATION

11


LIGHTNING PROTECTION SYSTEM

12


LIGHTNING PROTECTION SYSTEM

13


ALUMINIUM SYSTEM

BALCONY ALUM SYSTEM PLAN

BALCONY TRELLIS SECTION A - A

BALCONY TRELLIS SECTION B - B 14

100 X 100 X 5MM THK GALVANIZED STEEL TO RECEIVE RENSON OUTDOOR FIXSCREEN SIDE CHANNEL (HIGHLIGHTED IN RED)


ALUMINIUM SYSTEM

RAIN SENSOR

RAINWATER SENSOR POSITION

BALCONY ALUMINIUM SYSTEM AS-BUILT CONDITION

15


MAIN LIFT

LIFT 16 DETAILED DRAWINGS


MAIN LIFT

LIFT DETAILED DRAWINGS

17


MAIN STAIRCASE

18

MAIN STAIRCASE AS-BUILT CONDITION


MAIN STAIRCASE

MAIN STAIRCASE AS-BUILT CONDITION

19


C

D

E

F

ACMV SYSTEM

B

C

65

50

425

3

4

D

448

2

415

200

TV CONSOLE

1150

1

DH-1

950

DINING

1000

1

1500

325

FAMILY 2 LIVING

5

6

7

LANDSCAPE

8

3000

9

10

11

12

WINTER CLOSET

GALLERY KITCHEN

13

14

15

16

D

ENTERTAINMENT RO

GUEST ROOM

17

F

SECTION C-C SCALE: N.T.S

FT

HYDRO TAP

SECTION B1-B1

ACMV SHOP DRAWING - PLAN

WINE CELLAR

SCALE: N.T.S

18

19

3

20

21

2

1

B

22

1050

WORKING KITCHEN 400 400

475

950

25

E

E2 3000

KIT STORE

1400

24

HYDRO TAP

475

FOYER

23

GAS BURNER

E1

RM DB CABINET

GAS BURNER

HOOD

SECTION F-F

ACMV SHOP DRAWING - SECTION

MW/OV SCALE: N.T.S

WET KITCHEN

STORE

E2

KIT STORE

WORKING KITCHEN FFL +119.275

350

475 3475

3000

3475

G

E

FFL +123.650

475

WC

MUDROOM

E

FT

29

D

246

E 1050

OM

FFL

3000

BASEMENT

M&E RM

E1

HOOD

975

FT

FR

WORKING KITCHEN FFL

SECTION E1-E1 SCALE: N.T.S

C E

20

ACMV - AS BUILT CONDITION RL +131.500

D


SKYLIGHT SYSTEM

WARDROBE SKYLIGHT - SECTION

WARDROBE SKYLIGHT - AS BUILT CONDITION

21


ALUMINIUM SYSTEM

PROJECT : 4 OEI TIONG HAM PARK

TITLE : STAGGERED INSTALLATION OF MOTORIZED ZIP BLIND & VENTO ALUMINIUM WINDOW FRAME

DRN.BY

LIAO KAI

CHECKED INTEGRATION DETAIL BETWEEN RENSON INDOOR FIXSCREEN QN 1799 R07-2 PRJ. NO & ALUMINIUM SYSTEM DWG. NO

4OTHP-02-MZB_AF

DATE DATE SCALE PAGE

CUSTOMER SPACE SCOPE PTE LTD REVISION. NO

CONCEALED MAGNETIC CONTACT POINT 22


N.BY

ALUMINIUM SYSTEM

TO BE BOXED UP WITH IMPACT WALL/ PARTITION WALL

LIAO KAI

WG. NO

21/09/20

QN 1799 R07-2 4OTHP-02-MZB_AF

VENTO SYSTEMS PTE LTD

PIONEER CRESCENT #06-08 INTEGRATION DETAIL BETWEEN 24WEST RENSON INDOOR FIXSCREEN PARK BIZCENTRAL SINGAPORE 628557 SCALE 1:4 TEL.: (65) 6382 & ALUMINIUM SYSTEM4466 FAX.: (65) 6382 4477 Email: enquiry@vento.com.sg

DATE

ECKED

J. NO

DATE

PAGE

52

Website: www.vento.sg

STOMER SPACE SCOPE PTE LTD REVISION. NO 1

23


SIPHONIC RAINWATER DRAINAGE SYSTEM

RAINWATER DOWNPIPE SIPHONIC DRAINAGE SYSTEM 24


GLASS BALUSTRADE SECTION A-A SCALE 1:3

PROJECT : 4 OEI TIONG HAM PARK

TITLE : G202 GLASS BALUSTRADE - PLAN GLASS RAILING (4 PANELS)

SECTION B-B SCALE 1:3

DATE DATE SCALE PAGE

12/03/21

LTD REVISION. NO 2

LIAO KAI

DATE

12/

DATE

PRJ. NO

QN 1799 R07-2

SCALE

SH

DWG. NO

4OTHP-03-G202

PAGE

45

CUSTOMER SPACE SCOPE PTE LTD REVISION. NO 2

VENTO SYSTEMS PTE LTD 24 PIONEER CRESCENT #06-08 WEST PARK BIZCENTRAL SINGAPORE 628557 TEL.: (65) 6382 4466 FAX.: (65) 6382 4477 Email: enquiry@vento.com.sg Website: www.vento.sg

SHOWN BALUSTRADE - SECTION GLASS 45

DRN.BY CHECKED

GLASS BALUSTRADE - AS BUILT CONDITION 25


50

SWITCHABLE SLIDING GLASS DOOR

WATERTIGHT & DUST PROOF (IP54) DOWN LIGHT

30 MASTER BATHROOM

COVE LIGHT ON CEILING

200X200 EAD

EXHAUST AIR DUCT (ABOVE CEILING)

30

COLD WATER PIPE (FROM BVELOW) HOT WATER SUPPLY PIPE (FROM BELOW) HOT WATER RETURN PIPE (TO BELOW)

FLOOR TRAP/ FLOOR WASTE (TO BELOW) WATER PIPE FOR BIDET SPRAY

20

30

U REF. ES F/B

EXHAUST FAN (ABOVE CEILING)

FT

ACCESS PANEL ON CEILING

GATE VALVE TO SINK MIXER

MASTER BATHROOM (2ND STOREY) COMBINED SHOP DRAWING D

D

D

T/B

DH-2

LOCKABLE DH-3 CLOSET

MASTER BATHROOM (2ND STOREY) R WARDROBE WATERPROOFING WORK 26

MASTER BATHROOM (2ND STOREY) PONDING TEST


MASTER BATHROOM (2ND STOREY) WC PIPE - BEAM UNDERNEATH PENETRATION SECTION

BATHROOM WATERPROOFING (WC AREA)

BATHROOM WATERPROOFING (SHOWER AREA)

27


SLIDING SHOWER SCREEN (DETAIL) CLAMP ROLLER

GLASS TO WALL FITTING

STOPPER

FLOOR GUIDE

FLUSH HANDLE

28

SLIDING SHOWER SCREEN (AS-BUILT CONDITION)


INTERIOR TIMBER DOOR (SLIDING DOOR)

29


INTERIOR TIMBER DOOR (BI-FOLD DOOR)

30


INTERIOR TIMBER DOOR (SWING DOOR)

31


INTERIOR TIMBER DOOR (SLIDING & SWING DOOR)

32


WIFI HEATMAP SIMULATION

RUCKUS ZONEFLEXTM R310 UNLEASHED WIFI ACCESS POINT

33


INDOOR FAN SYSTEM

SELECTED FAN SWEEP SIZE

34

SELECTED MODEL


METER COMPARTMENT

METER COMPARTMENT DETAILED DRAWING

METER COMPARTMENT AS-BUILT CONDITION

35


CARPENTRY WORKS

LIVING ROOM (ARCHITECT’S IMPRESSION) 36


CARPENTRY WORKS

LIVING ROOM AS-BUILT CONDITION 37


38


2. 7 JALAN SENANDONG

THIS IS A 2-STOREY DETACHED DWELLING (GOOD CLASS BANGALOW) WITH AN ATTIC, A BASEMENT AND A SWIMMING POOL. ITS FACADE IS ENCAPSULATED BY PERFORATED, ENGINEERED MESHED SCREEN IN BRONZE COLOR.

39


BOUNDARY WALL

BOUNDARY WALL WORKING DRAWING

BOUNDARY WALL AS-BUILT CONDITION

40


BOUNDARY WALL

EXTERNAL DRAINAGE ALONG BOUNDARY WALL AS-BUILT CONDITION

41


EXTERNAL MESHED SCREEN AS-BUILT CONDITION

EXTERNAL MESH SCREEN (AS BUILT CONDITION) 42


EXTERNAL MESHED SCREEN AS-BUILT CONDITION

EXTERNAL MESH SCREEN (AS BUILT CONDITION) 43


SWIMMING POOL AS-BUILT CONDITION

SWIMMING POOL IN MOSAIC (AS BUILT CONDITION) 44


SWIMMING POOL AS-BUILT CONDITION

APPROVED GROUTING COLOR MOCK-UP GROUTING COLOR WITH SELECTED MOSAIC PATTERN

BUILDER APPLYING GROUTING ON SWIMMING POOL MOSAIC 45


DRIVEWAY & BASEMENT CAR PARK

BASEMENT CAR PARK & MAIN ENTRANCE (ARCHITECT’S IMPRESSION) 46


DRIVEWAY & BASEMENT CAR PARK

DRIVEWAY TO BASEMENT CAR PARK (AS-BUILT CONDITION) APPROVED PATTERN - 01

APPROVED PATTERN - 02

REJECTED PATTERN

DRAINAGE COVER ALONG DRIVEWAY (MOCK-UP & AS BUILT) 47


OVERALL LIVING ROOM PERSPECTIVE

SPIRAL STAIRCASE (ARCHITECT’S IMPRESSION) 48


LIVING ROOM MARBLE DRY LAY

49


SPIRAL STAIRCASE & CIRCULAR FEATURED PANEL DETAILD DRAWING

SPIRAL STAIRCASE (WORKING DRAWING) 50


MESHED SCREEN & FULL HEIGHT FRAMELESS GLASS PANEL DETAILED DRAWING

EXTERNAL MESH SCREEN & FULL HEIGHT GLASS PANEL SECTION

51


SPIRAL STAIRCASE & FULL HEIGHT FRAMELESS GLASS PANEL AS-BUILT CONDITION

SPIRAL STAIRCASE (AS BUILT CONDITION) 52


SPIRAL STAIRCASE SKYLIGHT AS-BUILT CONDITION

SPIRAL STAIRCASE SKYLIGHT (AS BUILT CONDITION) 53


54


3. CALVARY BAPTIST CHURCH

THIS IS A RENOVATION AND UPGRADING WORKS TO THE MAIN SANCTUARY HALL IN CALVARY BAPTIST CHURCH. THE KEY CONCEPT OF THIS PROJECT IS PROVIDING OPERABLE ACOUSTIC PANELS, WHICH STRETCH ALONG BOTH SIDES OF SANCTUARY AS A SUN SHADING DEVICE AS WELL AS RESONANCE ABSORPTION MATERIAL.

55


GROOVED WOOD ACOUSTIC PANEL SPECIFICATION

ACOUSTIC PANEL 56


FIRE RATED DOOR PECIFICATION

FIRE RATED DOOR 57


THANK YOU

58


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.