All site construction must be performed in accordance with current City of Santa Maria standards, specifications, and details. Source of base information is City of Santa Maria Department of Recreation and Parks and is assumed to be correct. The general contractor will verify all dimensions and existing conditions prior to commencing work and promptly notify the landscape architect of any discrepancies between the actual site conditions and the contract documents. Contact local underground utility services for utility location and identification prior to commencing work. Perform excavation in the vicinity of underground utilities with care and by hand, if necessary. The contractor bears full responsibility for this work and disruption or damage to utilities shall be repaired immediately and at no expense to the owner. The contractor is responsible for determining Means and Methods for construction in keeping with the plans provided by the landscape architect. Any concerns regarding intent of plans shall be referred directly to the landscape architect for immediate clarification. Install intersecting elements at 90 degree angles to each other unless otherwise noted. Provide expansion joints where concrete flatwork meets existing or vertical structures such as curbs, steps and building elements.
ACCEPTED BY
DRAWING INDEX L1
COVER SHEET
L2
MASTER PLAN
L3
LAYOUT PLAN
L4
GRADING PLAN
L5
PLANTING PLAN
L6
DETAIL SHEET
VICINITY MAP COVER SHEET
·
SITE PLAN
L1
GENERAL NOTES
VAR.
ELLISON, T
SANTA MARIA, CALIFORNIA
INSPIRATION LIBERATION
SANTA MARIA DEPARTMENT OF RECREATION AND PARKS
IMAGINATION LIBERATION
BOOKMAGINE PARK
BOOKMAGINE PARK
OCTOBER ##, 2017
LANDSCAPE PLANS FOR
KEY
1" = 20'
L2
MASTER PLAN
ELLISON, T
DECEMBER 1, 2017
INSPIRATION LIBERATION
BOOKMAGINE PARK
SANTA MARIA DEPARTMENT OF RECREATION AND PARKS
L3
GENERAL NOTES KEY
1" = 20'
LAYOUT PLAN
ELLISON, T
DECEMBER 1, 2017
INSPIRATION LIBERATION
BOOKMAGINE PARK
SANTA MARIA DEPARTMENT OF RECREATION AND PARKS
L4
GENERAL NOTES KEY
1" = 20'
GRADING PLAN
ELLISON, T
DECEMBER 1, 2017
INSPIRATION LIBERATION
BOOKMAGINE PARK
SANTA MARIA DEPARTMENT OF RECREATION AND PARKS
PLANTING SCHEDULE - TREES PLANTING SCHEDULE - PERENNIALS L5
GENERAL NOTES PLANTING SCHEDULE - PERENNIALS
1" = 20'
PLANTING PLAN
ELLISON, T
DECEMBER 1, 2017
INSPIRATION LIBERATION
BOOKMAGINE PARK
SANTA MARIA DEPARTMENT OF RECREATION AND PARKS
2 L6
ORGANIC-LOCK PATH PAVING
3 L6
TREE PLANTING
4 L6
SLOPED GRADE TREE PLANTING
5 L6
8' WIDE CONCRETE PATH
DETAIL SHEET L6
SITE DETAIL KEYNOTES:
VAR.
INSPIRATION LIBERATION
ELLISON, T
SEED MIXES
BOOKMAGINE PARK
SANTA MARIA DEPARTMENT OF RECREATION AND PARKS
CONCRETE PICNIC AREA
DECEMBER 1, 2017
1 L6