All site construction must be performed in accordance with current City of Santa Maria standards, specifications, and details. Source of base information is City of Santa Maria Department of Recreation and Parks and is assumed to be correct. The general contractor will verify all dimensions and existing conditions prior to commencing work and promptly notify the landscape architect of any discrepancies between the actual site conditions and the contract documents. Contact local underground utility services for utility location and identification prior to commencing work. Perform excavation in the vicinity of underground utilities with care and by hand, if necessary. The contractor bears full responsibility for this work and disruption or damage to utilities shall be repaired immediately and at no expense to the owner. The contractor is responsible for determining Means and Methods for construction in keeping with the plans provided by the landscape architect. Any concerns regarding intent of plans shall be referred directly to the landscape architect for immediate clarification. Install intersecting elements at 90 degree angles to each other unless otherwise noted. Provide expansion joints where concrete flatwork meets existing or vertical structures such as curbs, steps and building elements.

ACCEPTED BY

DRAWING INDEX L1

COVER SHEET

L2

MASTER PLAN

L3

LAYOUT PLAN

L4

GRADING PLAN

L5

PLANTING PLAN

L6

DETAIL SHEET

VICINITY MAP COVER SHEET

·

SITE PLAN

L1

GENERAL NOTES

VAR.

ELLISON, T

SANTA MARIA, CALIFORNIA

INSPIRATION LIBERATION

SANTA MARIA DEPARTMENT OF RECREATION AND PARKS

IMAGINATION LIBERATION

BOOKMAGINE PARK

BOOKMAGINE PARK

OCTOBER ##, 2017

LANDSCAPE PLANS FOR


KEY

1" = 20'

L2

MASTER PLAN

ELLISON, T

DECEMBER 1, 2017

INSPIRATION LIBERATION

BOOKMAGINE PARK

SANTA MARIA DEPARTMENT OF RECREATION AND PARKS


L3

GENERAL NOTES KEY

1" = 20'

LAYOUT PLAN

ELLISON, T

DECEMBER 1, 2017

INSPIRATION LIBERATION

BOOKMAGINE PARK

SANTA MARIA DEPARTMENT OF RECREATION AND PARKS


L4

GENERAL NOTES KEY

1" = 20'

GRADING PLAN

ELLISON, T

DECEMBER 1, 2017

INSPIRATION LIBERATION

BOOKMAGINE PARK

SANTA MARIA DEPARTMENT OF RECREATION AND PARKS


PLANTING SCHEDULE - TREES PLANTING SCHEDULE - PERENNIALS L5

GENERAL NOTES PLANTING SCHEDULE - PERENNIALS

1" = 20'

PLANTING PLAN

ELLISON, T

DECEMBER 1, 2017

INSPIRATION LIBERATION

BOOKMAGINE PARK

SANTA MARIA DEPARTMENT OF RECREATION AND PARKS


2 L6

ORGANIC-LOCK PATH PAVING

3 L6

TREE PLANTING

4 L6

SLOPED GRADE TREE PLANTING

5 L6

8' WIDE CONCRETE PATH

DETAIL SHEET L6

SITE DETAIL KEYNOTES:

VAR.

INSPIRATION LIBERATION

ELLISON, T

SEED MIXES

BOOKMAGINE PARK

SANTA MARIA DEPARTMENT OF RECREATION AND PARKS

CONCRETE PICNIC AREA