Conner Park - studio crosson

Page 1

CONNER

PA R K [CHRISTMAS WASH] PIMA WATER URBANISM

2019

STRATEGY & PROPOSAL



CREATORS

PROFES SOR [ COURTNEY CROS SON ]

STUDENT CREATOR [ KYLE SCHUMAN ]

PRINCIPAL HYDROLOGIST [ JACOB PRIET TO ]

STUDENT CREATOR [ MANUEL VASQUEZZ ]


PROJECT STATEMENT

GOALS

This park is designed to be a model template for Tucson parks with similar “dead edge” conditions, vernacular design appropriate for dessert conditions

“DEAD EDGE”- The underwatering of turf resulting in the loss of ground cover and under use.

1 RE-INTERPERATE IRRIGATION The reduction of under-used turf. Utilizing existing topology to collect water into a multiuse field. ensuring quality turf and a total reduction of municipal supply to the site. Tucson General Wash

2 COMMUNITY WEALTH AND ACCESS

67

Activation of service access roads into “green alleys” to safely circulate community members to and from the park. benches and shaded structures provide areas of respite.

The basins will collect runoff from the south streets and be retained in the onsite basins.

GRANT

CAMPBELL AVE

3 UN-BURDEN MUNICIPAL RUNOFF

Conner Park

13 Christmas Wash

Tucson Washes and Watersheds


N


JACOBS PARK

JACINTO PARK

BALBOA PARK

LA MADERA PARK

MC CORMICK PARK

Precedent City Name Sustainability Plan

ESTEVAN PARK

CONNER PARK

DEAD EDGE

NETWORK MAP

N


THE PROBLEM WASTED WATER ON UNDERUSED TURF

DEAD EDGE

100%

THE SOLUTION [Multi-field] REDUCE TURF

30%


Key: Residential

Commercial

Multi Family

Big Box

Restaurants

Retail

Homes


Context Map N

Scale: 1” = 500 feet

125’

250’

500’

1000’


BASE BALL

SOCCER

KICK BALL

DOG PLAY

JOGGING WALKING GRILL

PARK SURVEY: 28 SURVEYS COLLECTED

2 1 COMMUNITY ENGAGEMENT


LING

PARTY

PLAYFRISBEE GROUND

GREEN HOUSE

ADULT GREEN EQUIPMENT PATHWAY

WARD MEETING SURVEY

17 SURVEYS COLLECTED

4 3


GLENN A

DRY AREA

B

C

East Calle Alta Vista

D

2.0 - 3.0 ft

0.5 - 2.0 ft

0.2 - 0.5 ft

NEW FLOW ROUTE

Flood Map N

Scale: 1” = 50 feet

12.5’

25’

50’

100’


A

B

C

D

LOCATION PHOTOS


MULTI-USE FIELD

PATHWAY

LARGE BASIN

EXERCISE

SHADE STRUCTURE

GREEN ALLEY

SMALL BASIN

BIKE STORAGE

DESERT PLANTS

SEATING

PLAY GROUND

RUNOFF INGRESS

BRIDGE

KIT OF PARTS

LIGHTING


DESERT LILLY

GHOST FLOWER

YUCCA

YUCCA LARGE

RED BIRD OF PARADISE DESERT GRASS

YELLOW BELLS

BLUE AGAVE


13

16

8

11 10 12

22

18

1 6

17

9 2 21

20

3

15

7 22

12 19 4

5

13

14

EAST CALLE ALTA VIST 22

3

High Option Site Plan N

Scale: 1” = 50 feet

12.5’

25’

50’

100’


TA

Program: 1.

Additional Program: 15. Bleechers

8.

16. Safety Fence

DESERT

PLAY GROUND

22

2.

PLANTS

9.

17. Swings 18. Sand Pit 19. Parking

MULTI -USE FIELD

3.

LARGE BASIN

20. Small Library

10.

21. Grass Island

3

22

LIGHTING

GREEN ALLEY

4.

22. Vegetation Buffers

11.

SMALL BASIN

EXERCISE

5.

12.

LIGHTING

PATHWAY

6.

13.

BIKE STORAGE

SHADE STRUCTURE

7.

14.

SEATING

RUNOFF INGRESS

PROGRAM DIAGRAM


WATER COLLECTED FROM SURROUNDING DWELLINGS

MULTI-FIELD

IN EA

ST

ER

H

T OR

N

WATER SYSTEM DIAGRAM

UM PL

CA

LL

EA

LTA V

IST A


PATHWAY TO MULTIFIELD

PLAY GROUND

OUT

LARGE BASINS

SMALL BASINS


# 3 1

7 9

SECTIONAL AXON


Program: 1.

8.

DESERT

PLAY GROUND

2.

9.

MULTI -USE FIELD

13

16

PLANTS

3.

LARGE BASIN

10.

LIGHTING

GREEN ALLEY

4.

11.

11

8

SMALL BASIN

5

5.

12.

7

LIGHTING

PATHWAY

6.

13.

2 BIKE STORAGE

SHADE STRUCTURE

7.

14.

SEATING

RUNOFF INGRESS

N


A

A

E

Roof Truss Connection Detail Scale: 1” = 1 feet

.5’

1’

2’

D B

LEGEND A CORRUGATEDROOFING B WATER FOUNTAIN

N

C ROOF BASIN D PAVERS

Shade Structure isometric Scale: 1” = 6 feet

2’

4’

8’

E I BEAMS


A E 13’

B

7’

D

C

Section Scale: 1” = 6 feet

2’

4’

8’

14’

E

A

C

B 14’

D

2’

Floor Plan N

Scale: 1” = 6 feet

Roof Plan 2’

4’

8’

N

Scale: 1” = 6 feet

2’

4’

8’


North West Entrance

#



#


BUDGET PROJECT TITLE: ADDRESS: WARD:

Parking Entrance Conner Park 3

INSTRUCTIONS: FILL OUT YELLOW CELLS + ADD LINE ITEMS AS NEEDED TO COMPLETE BUDGET FOR YOUR PROJECT ITEM QUANTITY UNIT LABOR Project Management and Coordination 75 Hours Final Design and Planning 180 Hours Native Plant Nursery Coordination & PickͲup 5 Hours Fine Grading, Planting, Detail Rock Work 40 Hours Maintenance 4 Hours MATERIALS AND EQUIPMENT Excavation Equipment Rental Drainage Excavation Removal of Concrete Curb Removal of Asphaltic Pavement Hydroseed: Soil Stabilizer & Basin Bottoms 1 Gallon Plants 3 to 5 Gallon Plants 15 Gallon Plants RipͲRap 8" to 18" Fractured Rock for Basin Edges Concrete Steel Sheets Sidewalk Tree Grate

UNIT PRICE

TOTAL PRICE $90 $125 $90 $50 $35

$6,750 $22,500 $450 $2,000 $140

3 0 120 0

Days CuYd LFt SqYd

$1,780 $3 $2 $5

$5,340 $0 $240 $0

25,150 110 50 35

SqFt Each Each Each

$0.05 $6 $12 $40

$1,258 $660 $600 $1,400

1,000 SqFt 0 SqFt 0 SqFt

$2.30 $1.50 $65

$2,300 $0 $0

6 Each 500 SqFt 0 Each

$50 $3.50 $1,200

$300 $1,750 $0

Shade Structure Tensile Shade Structure Bench Seat Wall Table and Chairs Wayfinding Signs Luminaire, Horizontal Mount PhotoElectric Street Light Pedestrian Safety Lighting

0 2 6 0 12 0 0 0 42

Each Each Each LFt Each Each Each Each Each

$10,000 $35,000 $2,750 $80 $5,000 $3,000 $500 $200 $4,700

$0 $70,000 $16,500 $0 $60,000 $0 $0 $0 $0

Pipe, Corrugated Metal 42" Pipe, Reinforced Concrete 18" Scupper Check Dams

0 0 0 0

LFt LFt Each Each

$220 $160 $6,000 $1,200

$0 $0 $0 $0

SUBTOTAL Contingency (20%)

TOTAL

$192,188 $38,438

$230,625


#

Field View Day



#

Field View Rain



Green Alley Day

#



Air Shot

#

N



apendix.



Conner Park Out Flow (100 Ye ar Event): 29 c fs P ea k S tora ge ( 100 Ye ar Event): 326,000 gallons

RAINWATER

RAINWATER STORMWATER

BASIN

SANKY DIAGRAM

Alley


BUDGET PROJECT TITLE: ADDRESS: WARD:

Conner Park 3

INSTRUCTIONS: FILL OUT YELLOW CELLS + ADD LINE ITEMS AS NEEDED TO COMPLETE BUDGET FOR YOUR PROJECT ITEM QUANTITY UNIT LABOR Project Management and Coordination 75 Hours Final Design and Planning 180 Hours Native Plant Nursery Coordination & PickͲup 5 Hours Fine Grading, Planting, Detail Rock Work 40 Hours Maintenance 4 Hours MATERIALS AND EQUIPMENT Excavation Equipment Rental Drainage Excavation Removal of Concrete Curb Removal of Asphaltic Pavement Hydroseed: Soil Stabilizer & Basin Bottoms 1 Gallon Plants 3 to 5 Gallon Plants 15 Gallon Plants RipͲRap 8" to 18" Fractured Rock for Basin Edges Concrete Steel Sheets Sidewalk Tree Grate

UNIT PRICE

TOTAL PRICE $90 $125 $90 $50 $35

$6,750 $22,500 $450 $2,000 $140

3 0 120 0

Days CuYd LFt SqYd

$1,780 $3 $2 $5

$5,340 $0 $240 $0

25,150 110 50 35

SqFt Each Each Each

$0.05 $6 $12 $40

$1,258 $660 $600 $1,400

1,000 SqFt 0 SqFt 0 SqFt

$2.30 $1.50 $65

$2,300 $0 $0

6 Each 500 SqFt 0 Each

$50 $3.50 $1,200

$300 $1,750 $0

Shade Structure Tensile Shade Structure Bench Seat Wall Table and Chairs Wayfinding Signs Luminaire, Horizontal Mount PhotoElectric Street Light Pedestrian Safety Lighting

0 2 6 0 12 0 0 0 42

Each Each Each LFt Each Each Each Each Each

$10,000 $35,000 $2,750 $80 $5,000 $3,000 $500 $200 $4,700

$0 $70,000 $16,500 $0 $60,000 $0 $0 $0 $0

Pipe, Corrugated Metal 42" Pipe, Reinforced Concrete 18" Scupper Check Dams

0 0 0 0

LFt LFt Each Each

$220 $160 $6,000 $1,200

$0 $0 $0 $0

SUBTOTAL Contingency (20%)

TOTAL

$192,188 $38,438

$230,625


Glenn Road

Conner Park

N Plumer ave

East Calle Alta Vista

Existing Site Map N

Scale: 1” = 50 feet

12.5’

25’

50’

100’


Phase 1 Site Map N

Scale: 1” = 100 feet

25’

Low Option Site Map 50’

100’

N

Scale: 1” = 100 feet

25’

50’

100’


Green Alley Night

apendix.

9



apendix.



Low Option Site Plan N

Scale: 1” = 50 feet

12.5’

25’

50’

100’


High Option Site Plan N

Scale: 1” = 50 feet

12.5’

25’

50’

100’


#

Grass Island



North East Entrance

#