CONNER
PA R K [CHRISTMAS WASH] PIMA WATER URBANISM
2019
STRATEGY & PROPOSAL
CREATORS
PROFES SOR [ COURTNEY CROS SON ]
STUDENT CREATOR [ KYLE SCHUMAN ]
PRINCIPAL HYDROLOGIST [ JACOB PRIET TO ]
STUDENT CREATOR [ MANUEL VASQUEZZ ]
PROJECT STATEMENT
GOALS
This park is designed to be a model template for Tucson parks with similar “dead edge” conditions, vernacular design appropriate for dessert conditions
“DEAD EDGE”- The underwatering of turf resulting in the loss of ground cover and under use.
1 RE-INTERPERATE IRRIGATION The reduction of under-used turf. Utilizing existing topology to collect water into a multiuse field. ensuring quality turf and a total reduction of municipal supply to the site. Tucson General Wash
2 COMMUNITY WEALTH AND ACCESS
67
Activation of service access roads into “green alleys” to safely circulate community members to and from the park. benches and shaded structures provide areas of respite.
The basins will collect runoff from the south streets and be retained in the onsite basins.
GRANT
CAMPBELL AVE
3 UN-BURDEN MUNICIPAL RUNOFF
Conner Park
13 Christmas Wash
Tucson Washes and Watersheds
N
JACOBS PARK
JACINTO PARK
BALBOA PARK
LA MADERA PARK
MC CORMICK PARK
Precedent City Name Sustainability Plan
ESTEVAN PARK
CONNER PARK
DEAD EDGE
NETWORK MAP
N
THE PROBLEM WASTED WATER ON UNDERUSED TURF
DEAD EDGE
100%
THE SOLUTION [Multi-field] REDUCE TURF
30%
Key: Residential
Commercial
Multi Family
Big Box
Restaurants
Retail
Homes
Context Map N
Scale: 1” = 500 feet
125’
250’
500’
1000’
BASE BALL
SOCCER
KICK BALL
DOG PLAY
JOGGING WALKING GRILL
PARK SURVEY: 28 SURVEYS COLLECTED
2 1 COMMUNITY ENGAGEMENT
LING
PARTY
PLAYFRISBEE GROUND
GREEN HOUSE
ADULT GREEN EQUIPMENT PATHWAY
WARD MEETING SURVEY
17 SURVEYS COLLECTED
4 3
GLENN A
DRY AREA
B
C
East Calle Alta Vista
D
2.0 - 3.0 ft
0.5 - 2.0 ft
0.2 - 0.5 ft
NEW FLOW ROUTE
Flood Map N
Scale: 1” = 50 feet
12.5’
25’
50’
100’
A
B
C
D
LOCATION PHOTOS
MULTI-USE FIELD
PATHWAY
LARGE BASIN
EXERCISE
SHADE STRUCTURE
GREEN ALLEY
SMALL BASIN
BIKE STORAGE
DESERT PLANTS
SEATING
PLAY GROUND
RUNOFF INGRESS
BRIDGE
KIT OF PARTS
LIGHTING
DESERT LILLY
GHOST FLOWER
YUCCA
YUCCA LARGE
RED BIRD OF PARADISE DESERT GRASS
YELLOW BELLS
BLUE AGAVE
13
16
8
11 10 12
22
18
1 6
17
9 2 21
20
3
15
7 22
12 19 4
5
13
14
EAST CALLE ALTA VIST 22
3
High Option Site Plan N
Scale: 1” = 50 feet
12.5’
25’
50’
100’
TA
Program: 1.
Additional Program: 15. Bleechers
8.
16. Safety Fence
DESERT
PLAY GROUND
22
2.
PLANTS
9.
17. Swings 18. Sand Pit 19. Parking
MULTI -USE FIELD
3.
LARGE BASIN
20. Small Library
10.
21. Grass Island
3
22
LIGHTING
GREEN ALLEY
4.
22. Vegetation Buffers
11.
SMALL BASIN
EXERCISE
5.
12.
LIGHTING
PATHWAY
6.
13.
BIKE STORAGE
SHADE STRUCTURE
7.
14.
SEATING
RUNOFF INGRESS
PROGRAM DIAGRAM
WATER COLLECTED FROM SURROUNDING DWELLINGS
MULTI-FIELD
IN EA
ST
ER
H
T OR
N
WATER SYSTEM DIAGRAM
UM PL
CA
LL
EA
LTA V
IST A
PATHWAY TO MULTIFIELD
PLAY GROUND
OUT
LARGE BASINS
SMALL BASINS
# 3 1
7 9
SECTIONAL AXON
Program: 1.
8.
DESERT
PLAY GROUND
2.
9.
MULTI -USE FIELD
13
16
PLANTS
3.
LARGE BASIN
10.
LIGHTING
GREEN ALLEY
4.
11.
11
8
SMALL BASIN
5
5.
12.
7
LIGHTING
PATHWAY
6.
13.
2 BIKE STORAGE
SHADE STRUCTURE
7.
14.
SEATING
RUNOFF INGRESS
N
A
A
E
Roof Truss Connection Detail Scale: 1” = 1 feet
.5’
1’
2’
D B
LEGEND A CORRUGATEDROOFING B WATER FOUNTAIN
N
C ROOF BASIN D PAVERS
Shade Structure isometric Scale: 1” = 6 feet
2’
4’
8’
E I BEAMS
A E 13’
B
7’
D
C
Section Scale: 1” = 6 feet
2’
4’
8’
14’
E
A
C
B 14’
D
2’
Floor Plan N
Scale: 1” = 6 feet
Roof Plan 2’
4’
8’
N
Scale: 1” = 6 feet
2’
4’
8’
North West Entrance
#
#
BUDGET PROJECT TITLE: ADDRESS: WARD:
Parking Entrance Conner Park 3
INSTRUCTIONS: FILL OUT YELLOW CELLS + ADD LINE ITEMS AS NEEDED TO COMPLETE BUDGET FOR YOUR PROJECT ITEM QUANTITY UNIT LABOR Project Management and Coordination 75 Hours Final Design and Planning 180 Hours Native Plant Nursery Coordination & PickͲup 5 Hours Fine Grading, Planting, Detail Rock Work 40 Hours Maintenance 4 Hours MATERIALS AND EQUIPMENT Excavation Equipment Rental Drainage Excavation Removal of Concrete Curb Removal of Asphaltic Pavement Hydroseed: Soil Stabilizer & Basin Bottoms 1 Gallon Plants 3 to 5 Gallon Plants 15 Gallon Plants RipͲRap 8" to 18" Fractured Rock for Basin Edges Concrete Steel Sheets Sidewalk Tree Grate
UNIT PRICE
TOTAL PRICE $90 $125 $90 $50 $35
$6,750 $22,500 $450 $2,000 $140
3 0 120 0
Days CuYd LFt SqYd
$1,780 $3 $2 $5
$5,340 $0 $240 $0
25,150 110 50 35
SqFt Each Each Each
$0.05 $6 $12 $40
$1,258 $660 $600 $1,400
1,000 SqFt 0 SqFt 0 SqFt
$2.30 $1.50 $65
$2,300 $0 $0
6 Each 500 SqFt 0 Each
$50 $3.50 $1,200
$300 $1,750 $0
Shade Structure Tensile Shade Structure Bench Seat Wall Table and Chairs Wayfinding Signs Luminaire, Horizontal Mount PhotoElectric Street Light Pedestrian Safety Lighting
0 2 6 0 12 0 0 0 42
Each Each Each LFt Each Each Each Each Each
$10,000 $35,000 $2,750 $80 $5,000 $3,000 $500 $200 $4,700
$0 $70,000 $16,500 $0 $60,000 $0 $0 $0 $0
Pipe, Corrugated Metal 42" Pipe, Reinforced Concrete 18" Scupper Check Dams
0 0 0 0
LFt LFt Each Each
$220 $160 $6,000 $1,200
$0 $0 $0 $0
SUBTOTAL Contingency (20%)
TOTAL
$192,188 $38,438
$230,625
#
Field View Day
#
Field View Rain
Green Alley Day
#
Air Shot
#
N
apendix.
Conner Park Out Flow (100 Ye ar Event): 29 c fs P ea k S tora ge ( 100 Ye ar Event): 326,000 gallons
RAINWATER
RAINWATER STORMWATER
BASIN
SANKY DIAGRAM
Alley
BUDGET PROJECT TITLE: ADDRESS: WARD:
Conner Park 3
INSTRUCTIONS: FILL OUT YELLOW CELLS + ADD LINE ITEMS AS NEEDED TO COMPLETE BUDGET FOR YOUR PROJECT ITEM QUANTITY UNIT LABOR Project Management and Coordination 75 Hours Final Design and Planning 180 Hours Native Plant Nursery Coordination & PickͲup 5 Hours Fine Grading, Planting, Detail Rock Work 40 Hours Maintenance 4 Hours MATERIALS AND EQUIPMENT Excavation Equipment Rental Drainage Excavation Removal of Concrete Curb Removal of Asphaltic Pavement Hydroseed: Soil Stabilizer & Basin Bottoms 1 Gallon Plants 3 to 5 Gallon Plants 15 Gallon Plants RipͲRap 8" to 18" Fractured Rock for Basin Edges Concrete Steel Sheets Sidewalk Tree Grate
UNIT PRICE
TOTAL PRICE $90 $125 $90 $50 $35
$6,750 $22,500 $450 $2,000 $140
3 0 120 0
Days CuYd LFt SqYd
$1,780 $3 $2 $5
$5,340 $0 $240 $0
25,150 110 50 35
SqFt Each Each Each
$0.05 $6 $12 $40
$1,258 $660 $600 $1,400
1,000 SqFt 0 SqFt 0 SqFt
$2.30 $1.50 $65
$2,300 $0 $0
6 Each 500 SqFt 0 Each
$50 $3.50 $1,200
$300 $1,750 $0
Shade Structure Tensile Shade Structure Bench Seat Wall Table and Chairs Wayfinding Signs Luminaire, Horizontal Mount PhotoElectric Street Light Pedestrian Safety Lighting
0 2 6 0 12 0 0 0 42
Each Each Each LFt Each Each Each Each Each
$10,000 $35,000 $2,750 $80 $5,000 $3,000 $500 $200 $4,700
$0 $70,000 $16,500 $0 $60,000 $0 $0 $0 $0
Pipe, Corrugated Metal 42" Pipe, Reinforced Concrete 18" Scupper Check Dams
0 0 0 0
LFt LFt Each Each
$220 $160 $6,000 $1,200
$0 $0 $0 $0
SUBTOTAL Contingency (20%)
TOTAL
$192,188 $38,438
$230,625
Glenn Road
Conner Park
N Plumer ave
East Calle Alta Vista
Existing Site Map N
Scale: 1” = 50 feet
12.5’
25’
50’
100’
Phase 1 Site Map N
Scale: 1” = 100 feet
25’
Low Option Site Map 50’
100’
N
Scale: 1” = 100 feet
25’
50’
100’
Green Alley Night
apendix.
9
apendix.
Low Option Site Plan N
Scale: 1” = 50 feet
12.5’
25’
50’
100’
High Option Site Plan N
Scale: 1” = 50 feet
12.5’
25’
50’
100’
#
Grass Island
North East Entrance
#