First Ave and Navajo Road - studio crosson

Page 1

1st 1st Ave Ave / / Navajo Navajo Rd Rd Pima Water Urbanism 2019

St ude n t C rea t o rs: K i t ti tash C h ai k u n po n A nd rea N o r t o n P rofessor: Courtn ey C ro sso n



CONTENT Project Goals Project Statement Watershed Map Site Context Network Diagram Site Flooding Problems Community Interview Mountain View Neighborhood Kit of Parts Site Plan (demolished option) Water Flow Render (demolished option) Site Plan (adaptive reuse option) Building Plan Building Section Green Wall Assembly Detail Section Perspective Water Flow (10- year flood) System Diagram Renders Itemized Budgets

04 05 06 07 08 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 44 3


PROJEC T GOALS

4

Net Zero Water

Community Garden

Heat Island Effect

Achieve net zero status through utilization of rainwater for indoor use and gray water for outdoor use

Provide a space for local food vendors

Reduce heat island effect by introducing native vegetation and shading canopy

Green Infrastructure

Revitalization

Modification

Utilize green infrastructure to infiltrate and filter stormwater

Turning Navajo Wash into a green corridor proposing a pedestrian and biker friendly route

Retrofit buildings on site to apply to community’s culture and needs


PROJEC T STATEMENT

T his project is designed to benefit the Mountain View Neighborhood by revitalizing the Navajo Wash to a pedestrian and biker friendly route while maintaining vehicular access, and by retrofitting the buildings on the site to apply to the community’s cultural needs. In order to do so, the project goals propose net zero status through the utilization of rain water for indoor use, and gray water for outdoor use. This project also will attempt to reduce the heat island effect of the sites by introducing green infrastructure, trees, and other native vegetation to the three sites.

5


WATERSHED MAP

Rillitto River

Navajo Wash

Tucson Watershed Navajo Wash is a natural water path that is paved with asphalt to be a road. Stormwater flooding the Navajo Road flows to the Rillito River.

6


SITE CONTEXT

A

Na

oa oR vaj

A

d

B C 1s

tA

ve

nu

w t Lo Fo r

ell

e

B

C

Site Location The site of Navajo Road and 1st Avenue has little to no vegetation. Navajo Road is the nearest wash that leads to the Rillito River. However, Navajo Road is paved and thus impervious, rendering all water on the site useless and damaging as it is led away. A majority of the built environment is commercial and residential, one story buildings. The average height of buildings is 15’ and the average square footage for residential is nearly 2600 sq ft, and the average “big box” commercial unit is approximately 13,600 sq ft. 7


NE TWORK DIAGRAM 201 East Navajo Rd Square Footage: 21,700 sq ft Potential Basin Depth: 2 ft Volume Captured: 325,000 gal

Navajo

2 West Navajo Rd Square Footage: 65,772 sq ft Potential Basin Depth: 2 ft Volume Captured: 984,000 gal

8

900 East N

Square Foo Potential B Volume Ca


o Ro ad

Total Volume Captured

1.8

mil gal / yr

Lot 9007 Square Footage: 12,600 sq ft Potential Basin Depth: 2 ft Volume Captured: 190,000 gal

Navajo Rd

otage: 24,000 sq ft Basin Depth: 2 ft aptured: 360,000 gal 9


SITE F LOODING PROBLEMS

A B 2

1

3

C

4

1

Lack of Sidewalks: There is limited pedestrian circulation due to a lack of access.

2

Ponding: The inefficient design of the parking lot creates pooling.

3

Water Damage: Tucson’s occasional humidity causes damage to asphalt when juxtaposed to Tucson’s typically arid temperature.

4

10

Unkept Driveway: The plaza’s driveways are unkept and allowed to succumb to damage.


1

2

3

4 11


COMMUNIT Y INTERVIEW

Walmart Neighborhood Market

•Consider safety! More lights! There is safety in numbers! •What is efficient in terms of program and doesn’t take a lot of time or money? •We want work trade training on site! •We want a food truck pod! •Consider the flow of people and the flow of water from 1st Ave and Navajo Rd to Amphi Neighborhood Park.

Saint Francis Shelter Thrift Store

Metro by T - Mobile 12

Tucson City Council Ward 3


•We want fast food! •We love the barbershop. •There is a lot of homeless here. •The building has a bad reputation.

•We want Wal-Mart to expand! •The buildings have a bad reputation. Tear them down!

•We want a gym! •We would rather have the building replaced. •This is not a safe area, my customers don’t like to come here.

13


MOUNTAIN VIEW NEIGHBORHOOD

1

Pa r k

2 2 3

Fo o d Tr u c k Pod

B o a rd G a m e (C hess)

Wo r k S ki l l Trai n i n g/ C o m m u n i t y C en ter

Co mm u n i t y Garden

Da ycare

14


Other ( be spec i fi c )

A

Dog Park Sport Field (Soccer/ Basketball) Indoor Park Indoor Gym

B 1 ST A V E

N AVA J O R D

C FT LOWELL

15


Speed Bump

P A R K I N G

D I S Sidewalk with Curb Cut

16

Compact Dirt Parking

C O M M U N I T Y

C H E C K

K Elevated Walkway

E

W A L

G A R D E N

D A M

KIT OF PARTS

Vegetable Garden

Cistern


Stepped Basin

Green Wall

Septic Tank & Sand Filter

D R A I N A G E

F I L T R A T I O N GREEN WALL

Micro Basin

Outlet

Overflow Pipe

17


SITE PLAN

D E M OL ISH ED O P T IO N

Cost Estimate (US Dollar)

1.9

million

1 2

Kit of Parts urb

walk with c is de

ped basin ts ep

3

cut

tle ou

Dirt 18

t

4

w erflo pipe ov

Permeable Surface

Water

Impervious Surface


1

2

1 2

1

1

Recreational Area

2

Biofiltration Stepped Basin

3

Bioswale/ Microbasin

4

Bus Stop 19


WATER FLOW

10-Y EA R S F LO O D : CU B I C F E E T PER SEC O N D (C FS) Inflow Volume (ac-ft) : 46 Peak Storage (ac-ft) : 1 Peak Reduction (%) : 0 Volume Reduction (%) : 2

288 cfs

wa tershe d

287 c fs

di sc h arge

II I III

Water Flow Direction 20

Infiltration

IV

Existing Drainage

Underground Pipe


I

II

Inlet from Najavo Wash

III

Basin Bank

IV

Outlet to City Drainage

Path Bridge

21


RENDER

22

D E M O LI S HED O P T IO N


23


SITE PLAN

A DA P T IVE REUSE O P T IO N

Cost Estimate (US Dollar)

0.8

million

6

8 ta vege ble ga

a ew

lk with cu rb

outle

cistern

t

cut

si d

flo over w pip

lk d wa way

en rd

ate

e

ele v

Kit of Parts

2 micro basin

l k w it h c u

1

24

Public Market

k an an

ct

a

parking dirt

d sand

filt

septi

comp

ct

4

er

n

stepped basi

green w al

rb

cu t

si

wa

l

de

2

Local Made Product

3

Parking

4

Bus Stop

5

Garden Learning Center


7

8

5 1

8 6 3

6

Playscapes (Play Ground)

7

Community Garden

8

Biofiltration Stepped Basins 25


BUILDING PLAN

11

9

10

26


12

11

12

9

Work Station

10

Vendor Goods

11

Restrooms

12

Local Vendors 27


BUILDING SEC TION

AMPHI MARKET

MM YU Y PIZZA

WOW

ICE-CREAM

green wall deta

28


ail

29


GREEN WALL ASSEMBLY DE TAIL hollow steel

j-section bar

mesh cage

mineral wool board with pre-grown vegetation 30


mesh cover

31


SEC TION PERSPEC TIVE A

B

Vegetation filters water before releasing to the watershed

32


C

Water flows through the swale before entering the basin

Check dam helps diverting water to the basin

Water from faucet flows to the green walls

The swale helps to clean parking lot stormwater

33


WATER FLOW

10-Y EA R S F LO O D : CU B I C F E E T PER SEC O N D (C FS) Inflow Volume (ac-ft) : 46 Peak Storage (ac-ft) : 0 Peak Reduction (%) : 0 Volume Reduction (%) : 0

287 cfs discharge

34


rainwater

288 cfs

ru

f no

run

-on

watershed

f

outlet

e r f l o w ov p

ip e

Water Flow Direction

New Drainage

Underground Pipe 35


SYSTEM DIAGRAM

CISTERN

W

R

WATE R

R

N AI

E AT

RAIN 36

GRAYWATER


RAINWATER STORMWATER

37


RENDER

38

A DA P T I V E REUSE O P T IO N


39


RENDER

40

A DA P T I V E REUSE O P T IO N


41


RENDER

42

A DA P T I V E REUSE O P T IO N


43


IT EMIZED BUDGE TS Item

DEMO L ISH ED O P T ION

Quantity

Unit

Unit Price

Total Price (US $)

LABOR Project Management and Coordination Final Design and Planning Native Plant Nursery Coordination & Pick-up Fine Grading, Planting, Detail Rock Work Maintenance

225 100 1,500 420 300

Hours Hours Hours Hours Hours

$90 $125 $90 $50 $35

$20,250 $12,500 $135,000 $21,000 $10,500

MATERIALS AND EQUIPMENT Excavation Equipment Rental Drainage Excavation Removal of Concrete Curb Removal of Asphaltic Pavement

31 15,960 0 13,006

Days CuYd LFt SqYd

$1,780 $3 $2 $5

$55,180 $47,880 $0 $65,030

Hydroseed: Soil Stabilizer & Basin Bottoms 1 Gallon Plants 3 to 5 Gallon Plants 15 Gallon Plants

46,700 60 25 25

SqFt Each Each Each

$0.05 $6 $12 $40

$2,335 $360 $300 $1,000

Rip-Rap 8” to 18” Fractured Rock for Basin Edges Concrete

2,250 1,000 4,470

SqFt SqFt SqFt

$2.30 $1.50 $65

$5,175 $1,500 $290,550

Steel Sheets Sidewalk Tree Grate

3,500 172,600 0

Each SqFt Each

$50 $3.50 $1,200

$175,000 $604,100 $0

Shade Structure Tensile Shade Structure Bench Seat Wall Table and Chairs Wayfinding Signs Luminaire, Horizontal Mount PhotoElectric Street Light Pedestrian Safety Lighting

0 0 30 0 15 0 0 0 20

Each Each Each LFt Each Each Each Each Each

$10,000 $35,000 $2,750 $80 $5,000 $3,000 $500 $200 $4,700

$0 $0 $82,500 $0 $75,000 $0 $0 $0 $0

Pipe, Corrugated Metal 42” Pipe, Reinforced Concrete 18” Scupper Check Dams

0 0 0 0

LFt LFt Each Each

$220 $160 $6,000 $1,200

$0 $0 $0 $0

DEMOLITION

43,242

SqFt

$5

$216,210.00

SUBTOTAL $1,605.160 CONTINGENCY (20%) $321,032

TOTAL $1,926,192 44


IT EMIZED BUDGE TS Item

ADAP T IVE REUSE O P TI ON

Quantity

Unit

Unit Price

Total Price (US $)

LABOR Project Management and Coordination Final Design and Planning Native Plant Nursery Coordination & Pick-up Fine Grading, Planting, Detail Rock Work Maintenance

225 100 1,500 420 300

Hours Hours Hours Hours Hours

$90 $125 $90 $50 $35

$20,250 $12,500 $135,000 $21,000 $10,500

MATERIALS AND EQUIPMENT Excavation Equipment Rental Drainage Excavation Removal of Concrete Curb Removal of Asphaltic Pavement

14 15,960 0 8,578

Days CuYd LFt SqYd

$1,780 $3 $2 $5

$24,920 $47,880 $0 $42,890

Hydroseed: Soil Stabilizer & Basin Bottoms 1 Gallon Plants 3 to 5 Gallon Plants 15 Gallon Plants

53,175 30 25 10

SqFt Each Each Each

$0.05 $6 $12 $40

$2,659 $180 $300 $400

Rip-Rap 8” to 18” Fractured Rock for Basin Edges Concrete

10,650 6,380 0

SqFt SqFt SqFt

$2.30 $1.50 $65

$24,495 $9,570 $0

Steel Sheets Sidewalk Tree Grate

0 39,750 0

Each SqFt Each

$50 $3.50 $1,200

$0 $139,125 $0

Shade Structure Tensile Shade Structure Bench Seat Wall Table and Chairs Wayfinding Signs Luminaire, Horizontal Mount PhotoElectric Street Light Pedestrian Safety Lighting

3 0 15 0 15 0 0 0 15

Each Each Each LFt Each Each Each Each Each

$10,000 $35,000 $2,750 $80 $5,000 $3,000 $500 $200 $4,700

$30,000 $0 $41,250 $0 $75,000 $0 $0 $220 $0

Pipe, Corrugated Metal 42” Pipe, Reinforced Concrete 18” Scupper Check Dams

1 0 5 1

LFt LFt Each Each

$220 $160 $6,000 $1,200

$220 $0 $30,000 $1,200

SUBTOTAL $669,559 CONTINGENCY (20%) $133,912

TOTAL $803,471 45