Industrial nature - recycling landscape

Page 1

Industrial nature - recycling landscape

Shuobing Gong z5175035 LAND2413-Landscape Studio 10


Hybrid Question

Can habitat regeneration connect the community to the post-industrial site and the waterfront?


Principles SDGs Goals


Waterfront

Hydrology Analysis

Sea Level Change

Surface Water Runoff through Polluted Soil


Topography Analysis

Industrial effect


Materiality Analysis

Industrial effect


Site Soil Pollution Levels Analysis

Industrial effect


Industrial Lands Analysis

Industrial effect


Australian Energy Generation Structure Change

Industrial effect


Habitat Native Vegetation Zones In Site

Base map by Tong Zhang (2021,T1,Group work )


Regional Habitat Linkage

Habitat


Future Structure Plan Analysis


Opportunities & Constraints


Stage Plan Stage 1 - 2040 Phytoremediation

Site-wide remediation process to improve soil condition and establish landscape types.

Stage 2 - 2100 Industrial Walk

- Establish public domain connection from the WBPS and the Slio. - Initial recovery for coastal habitats.

Stage 3 - 2200 Coastal recovery

- Creating resilient lanscape on the waterfront responding to the sea level rise - Establish WSUD system with constructed wetland - Establish mature planting ecosystem


Phyto-remediation Process

Stage 1


Phyto-remediation Typologies

Stage 1


Existing

2020 Section

The Silo is operating. Workers working on the port with occasional visitors that are not allowed to stay for long time.

Section Cut Plan

Scale Bar

0

2

4

6

8m

1:200


Stage 2

2100 Section

Peope are allowed to get close to see the waterfront and changes of the tide. In low tide, people can see the aquatic species in the intertidal zone attaching on the woodpiles.

Section Cut Plan

Scale Bar

0

2

4

6

8m

1:200


Stage 3

2200 Section

During high tide, People walks on the boardwalk on the resilient landscape waterfront. During low tide, the landscape is free for walking on ground.

Section Cut Plan

Scale Bar

0

2

4

6

8m

1:200


Timber Pile Habitat


Existing

2020 Section

People only drive through the site. Obstructed by construction activities.

Section Cut Plan

Scale Bar

0

2

4

6

8m

1:200


Stage 2

2100 Section

Kids play at the playscape. People strolling and sitting on the regenerated grassland.

Section Cut Plan

Scale Bar

0

2

4

6

8m

1:200


Stage 3

2200 Section

People walks on the waterfront promenade and observe the seawall habitats.

Section Cut Plan

Scale Bar

0

2

4

6

8m

1:200


Final Stage Plan

N Scale Bar 1:2000 0 20 40 60

80m


Landscape Layers

Circulation

Topography

Public Domain

Vegetation


Recycle Materials


Plants Detail Design Street Plants Street type 1

1 2

3

Location plan

Street type 2

Street type 3


Plants Detail Design Street Plants

Street type 4

Street type 5

5

6 4

Location plan

Street type 6


Plants Detail Design Wetland Plants

Location plan


Perspective Wetland Location plan


Physical Model


Plants Detail Design

Location plan

Woodland Plants


Scale Bar

0

2

4

6

8m

1:200


Perspective Woodland Location plan


Plants Detail Design Phyto-remediation Plants

Location plan


Perspective Phyto-remediation

Location plan


Plants Detail Design Wetland Plants

Location plan


Physical Model


Perspective Playscape

Location plan


Perspective Workshop

Location plan


CPTED

Accessbility

Activities for multiple users and abilities, social groups. User Age Group


CPTED

Surveillance


CPTED

Maintenance Use of material to show Civic Pride


CPTED

Site Activation Daytime activities

Nighttime activities


CPTED

Lighting


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.