Figure 53: Sydney Metro Southwest Stakeholder Power/Interest Matrix

Sydney Metro Project. Therefore, they need to be kept informed through frequent, efficient, and effective communication.

[Low Interest, Low Power]: Project management team is more likely to put less effort on the engagement with these stakeholders. They will be monitored via some effective passive engagement method.

Based on the methodology stated above, the stakeholder power and interest matrix is created and demonstrated as figure53:

With respect to those grouped stakeholders falling in four respective quadrants, the whole stakeholder list will be referred to table 24 which is created aligning with stakeholder register.

Figure 53: Sydney Metro Southwest Stakeholder Power/Interest Matrix