Metro Rail Today August 2021

Page 14

TENDER WATCH

FRESH TENDERS Project

Scope of Work

Issue Date

Closing Date

Authority

Agra Metro

Design and Construction of Tunnel from start of underground ramp (near Fatehabad Road Metro station) to end of ramp after RBS college Metro station including seven underground metro stations (viz. Taj Mahal, Agra Fort, Jama Masjid, S.N. Medical college, Agra college, Raja ki Mandi and RBS college) including Architectural finishes, E&M, TVS, ECS etc. on Corridor-1 of Agra MRTS Project at Agra, Uttar Pradesh, India

05.08.2021

12.10.2021

UPMRCL

Chennai Metro

Design, Manufacture, Supply, Installation, Testing & Commissioning of Signalling & Train Control System and Video Management System.

07.08.2021

11.10.2021

CMRL

Chennai Metro

Design, manufacturing, supply, installation, testing, training and commissioning of RSS, ASS, SCADA, OHE & Switching Stations for CMRL Phase II – Corridor 4 (From Poonamallee Bypass to Lighthouse, including Depot at Poonamallee).

06.08.2021

04.12.2021

CMRL

Chennai Metro

Expression of Interest for Providing Rolling Stock on Lease basis (42 trains of 3-car configuration) for CMRL phase II network

05.08.2021

21.09.2021

CMRL

Mumbai Metro

Supply, Installation, Testing and Commissioning of Building Management system at 17 stations of Mumbai Metro Line-2A

20.07.2021

19.08.2021

DMRC

Patna Metro

SITC of 25KV Overhead Equipment (OHE) System, Switching Posts, 33KV Ring mains, Auxiliary Sub stations for Elevated Sections and SCADA System for Underground and Elevated sections for Corridor 1 and 2 and ISBT Depot of Patna Metro Rail Project.

22.07.2021

09.09.2021

DMRC

Mumbai Metro

Supply, installation, testing and commissioning of ballastless track work of standard gauge from SEEPZ Village (excluding) (ch.6693.663) to Vikhroli (including) (ch.14244.873) elevated sections of line-6 corridor of Mumbai Metro Project

27.07.2021

25.08.2021

DMRC

Bangalore Metro

Design, Manufacture, Supply, Installation, Testing and Commissioning of Fully Automatic Train Wash Plants for Whitefield, Hebbagodi and Kothanur Depots of BMRCL Phase-II Project.

01.07.2021

26.08.2021

BMRC

RRTS

Manufacture, Supply, Installation, Testing and Commissioning of Signage and Graphics for 09 (Nine) Elevated Stations, 01 (One) (One) At grade Stations (Viz. Duhai Depot Station), 01 (One) Depot and Housing complex at Jungpura of Delhi -Ghaziabad-Meerut RRTS

28.07.2021

17.09.2021

NCRTC

RRTS

Design, manufacturing, supply, testing and commissioning of catenary maintenance vehicle and engineering maintenance vehicle for Delhi – Ghaziabad -Meerut Regional Rapid Transit System (RRTS) corridor.

06.07.2021

23.08.2021

NCRTC

HSR

Design, Construction, Installation, Testing and Commissioning of Sabarmati Depot consisting of Workshop, Inspection Sheds, various buildings, Maintenance Facilities, and Associated works on Design Build Lump Sum Price Basis in the State of Gujarat for the Project for Construction of Mumbai-Ahmedabad High Speed Rail Corridor

29.07.2021

02.12.2021

NHSRCL

14

METRO RAIL TODAY AUGUST 2021

WWW.METRORAILTODAY.COM


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.