Urban Transport Infrastructure January 2020

Page 26

 HIGH SPEED RAIL insulation panels for pantographs etc. All cars are fitted with active suspension system to minimize lateral vibrations due to car body swaying. Seats are ergonomically designed and have ample leg space for passenger comfort.

NHSRCL in association with Rural Development and Self Employment Training Institute (RUDSET), started Future Entrepreneur Training Programme for Project Affected Families.

 HSR Stations

Sabarmati Ahmedabad

Environment-friendly Travel Additionally, trains are provide with features such as LED lighting, overhead baggage racks, reclining seats in all cars and seat leg rests operating in conjunction with seat reclining & reading lamps in business and first class cars. Passengers will be able to talk with train crew by pushing a button in case of any emergency. Cars will have braille enabled information signage in the vestibule area, toilets, and other required places. One car will be provided with multipurpose room with folding bed, mirror etc. for sick persons or child feeding women and so on. Safety First There will be cameras on front and rear ends of the passenger cabins and on both sides of vestibule that will record any suspicious activity onboard. The train will be fitted with most advanced crash avoidance system, automatic brake application in case of over speeding etc. It will be equipped with earthquake detection system that will enable automatic power shutdown when primary waves emerging from an earthquake epicentre is sensed. It will be fitted with a network of sensors monitoring rail track temperature, rain monitoring and anemometers for wind monitoring. Driving unit of bullet train, equipped with a number of display units, communication equipment and other tools, will help driver in taking prompt decisions. Social Initiatives NHSRCL provided fully-equipped modern ambulance cum mobile health unit in the tribal areas of DahanuTalasari Talukas of Palghar District. In coming days, skill development programme will be undertaken to ensure that the youth in tribal areas get maximum opportunities of employment.

26

Anand

HSR is efficient, eco-friendly, creates less noise and air pollution and uses less land for building similar passenger capacity infrastructure as compared to other transports. As the train will pass through wildlife areas and coastal regions, and also cross areas classified as forest, NHSRCL is making sure that even during construction stage of Mumbai-Ahmedabad High Speed Rail, there is minimal damage to the environment. All efforts such as sound barriers are planned so that wild life is not disturbed because of the corridor and the construction activity. There will be no disturbance to fish and other animals as complete corridor after undersea tunnel is on elevated viaducts. Without changing the location of Thane station, design of station was modified and NHSRCL has saved around 21000 mangroves.

Vadodara Bharuch Surat Billimora Vapi Boisar Virar Thane

Further, at the construction sites NHSRCL is using ‘Tree Spade Technology’ which ensures that the uprooted tree is taken to a new plantation site and replanted.

Bandra

manufacturing and construction practices. Hence, NHSRCL is ensuring there is Modernisation of Indian Railways, the minimum effect to the environment. third largest railway network in the world, is essential to attain goals of national Make In India progress. Introduction of HSR is a As per the agreement between India and significant step in this endeavor. Bullet Japan, the MAHSR Project has “Make in trains would provide big boost to Indian India (MII)” & “Transfer of Technology” Railways with advanced safety, technology objectives which are envisaged to be met transfer, skill development and huge influx of resources. through the following: • Joint Venture between Indian and Japanese firms manufacturing in India • Equity participation by Japanese firms in Indian firms manufacturing in India • Japanese firms manufacturing in India TOT to Indian firms manufacturing in India

A virtual game changer, HSR is all set to help provide passengers with safe, reliable, and comfortable travel experience matching global standards. The project apart from being a technological benefits. These include saving in travel time, vehicle operation cost, reduced Co2 emissions, comparatively less land required than a 6lane highway for same passenger capacity, enhanced safety, and job creation because of higher economic activity and faster connectivity.

While Japanese firms will have access to opportunities in the big and growing Indian Railways, Metro Railways other than HSR projects, India stands to gain by assimilation of better technology, ***

Urban Transport Infrastructure // JANUARY 2020

WWW.URBANTRANSPORTNEWS.COM


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Event Calendar 2020

1min
page 76

Who is Who in Urban Transport Industry

4min
pages 77-80

Report on National Infrastructure Pipeline 2020 2025 by Govt. of India

6min
pages 72-75

New Energy Mobility for India

18min
pages 67-71

India's unique path towards electric mobility revolution

4min
page 65

The Metro Railway Diplomacy: A Path

4min
page 66

Urban Transport and Safety against Airborne Disease Ar. Raja Singh & Prof. Dr. Anil Dewan School of Planning & Architecture (SPA

4min
pages 63-64

Challenges in Design and Construction of World’s tallest rail bridge in India

19min
pages 55-62

Mr. Alkesh Kumar Sharma

9min
pages 51-54

Ms. Rupa Nandy

6min
pages 48-50

Mr. KVB Reddy

12min
pages 42-45

Mr. Ashok Kumar Bhaiya

6min
pages 38-40

Fluid Controls Private Limited: Manufacturer and supplier of world class industrial instrumentation products

1min
page 46

Indian Railway's production units are leading 'Make in India' initiative Devi Prasad Dash, CEDE, Indian Railways

3min
page 47

Dr. Brijesh Dixit

10min
pages 34-37

Mumbai Ahmedabad Bullet Train Project: Accelerating India’s Journey into future

2min
pages 24-25

RRTS: Connecting India’s National Capital Region with World class Rapid Rails

17min
pages 26-31

Editor’s Message

3min
page 6

Editorial Advisory Board

1min
page 7

Urban Mobility & Leadership Award 2019 20

3min
pages 3-5

Mr. Rajesh Madan

6min
pages 32-33

Round Up 2019

13min
pages 9-16

BRTS Projects in India

0
page 20
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.