Bashkortostan

Page 1

THE REPUBLIC OF BASHKORTOSTAN

p r e s e n t a t i o n








AN OUTSTANDING RUSSIAN HEALTH RESORT CENTER

Yangantau

Krasnousolsk

Assy

Yubileyniy

Karagay

Yumatovo

Talkas

Yakty Kul

Tanyp




Positive Positive





- in helicopter construction - in hoist



















UFA CITY MUNICIPAL DISTRICT ADMINISTRATION REPUBLIC OF BASHKORTOSTAN

UFA CITY INFRASTRUCTURE PROJECTS

p r e s e n t a t i o n


UFA IS A MAJOR INDUSTRIAL, TRANSPORT, SCIENTIFIC AND CULTURAL CENTER OF RUSSIA


UFA IS A MAJOR INDUSTRIAL, TRANSPORT, SCIENTIFIC AND CULTURAL CENTER OF RUSSIA Area: over 700 km2 Population: over 1,000,000 Ethnic composition: over 100 ethnic groups, primarily • Bashkirs • Russians • Tatars


UFA IS LOCATED AT THE JUNCTION OF THE MAJOR TRAFFIC ARTERIES WHICH CONNECT EUROPEAN RUSSIA WITH URAL AND SIBERIA


UFA INTERNATIONAL AIRPORT

Domestic flights to 31 Russian cities International flights to 22 foreign cities


FOREIGN TRADE TURNOVER IN UFA (2012), mln. us dollars

1413,6 1086,3

1151,1

712,6

FTT 439,5

327,3

Export Import

2011

2012


INDUSTRIAL PRODUCTS MANUFACTURED IN UFA


HOUSING BUILT IN 2012 - 767,000 sq. m.


UFA’S CREDIT RATING BY STANDARD & POOR’S

«ВВ-» /Positive/ «ВВ-» /Stable/ «В+» /Positive/ «В» /Stable/

2006

2007

2008-2010

2011-2012


MOST BUSINESS-FRIENDLY CITIES OF RUSSIA BY FORBES (2012)

I place

Sochi

II place

Ufa

III place

Chelyabinsk


IN 2012-2013 UFA IS TO HOST

World Junior Hockey Championship

6th International Children’s Winter Games


UFA WILL HOST SCO AND BRICS SUMMITS IN 2015


INVESTMENT PROJECTS


INVESTMENT PROJECTS WITH FOREIGN CAPITAL


REALIZATION OF LARGE INVESTMENT PROJECTS WITH FOREIGN CAPITAL

• Austrian concern Realization of large investment projects with foreign capital “Lasselsberger”

• «Witzenmann GmbH» (Germany)


PARTICIPATION OF EBRD AND IBRD IN FINANCING THE PROJECT OF «UFAVODOKANAL» ENTERPRISE

Total amount of loan funds – 28,6 mln. US dollars


INFRASTRUCTURE PROJECTS


CONSTRUCTION OF EXPRESS TRAMWAY

Total amount of work – 190 mln. US dollars


CONSTRUCTION OF A TUNNEL AND A BRIDGE ACROSS UFA RIVER

Total amount of work – 952 mln. US dollars


BUILDING OF A BRIDGE ACROSS BELAYA RIVER AT THE INTERSECTION OF HALLE STREET

Total amount of work – 235 mln. US dollars


DEVELOPMENT OF «ZABELYE» TERRITORY Commissioning date: 2012-2017

Reconstruction and building of new:

• • • • • •

heat supply sources mains sewage collectors sewage treatment plants power lines storm water drainage Available housing 6,000,000 m2 Investment required

222 mln. US dollars


BUILDING OF LARGE-PANEL CONSTRUCTION FACTORY

Plant capacity 120-150 000 m² per year Project pay back – 5-6 year

Total amount of work – 15.9 mln. US dollars Plant placement of plant area of perspective housing development in the Zabelye Site area – 2670 hectare Housing demand – 6,068 m² Estimated realizable cost per square meter – 35-40 thousands rub.


DEVELOPMENT OF CITY BLOCK 534

Development area Available housing incl. new construction Population

7.4 ha 31,040 m2 1,240


DEVELOPMENT OF GLUMILINO RESIDENTIAL DISTRICT

Development area Available housing incl. new construction Population

399.3 ha 1,326,000 m2 991,600 m2 58,700


DEVELOPMENT OF YONDOZ MICRODISTRICT

Development area Available housing incl. new construction Population

27.52 ha 194,880 m2 6,250


DEVELOPMENT OF HOTEL INDUSTRY


HOTEL AT THE INTERSECTION OF TSYURUPA AND Z. VALIDI STREETS IN KIROVSKY DISTRICT OF UFA

Project costs: 50 mln. US dollar s

Proponent ООО «Monolitstroi» Degree of implementation Project works in progress Commissioning date II quarter of 2015

Number of rooms – 180 Development area – 12 thousand sq. m.


HOTEL ON MENDELEEV STREET IN OKTYABRSKY DISTRICT OF UFA

Project costs: 63.5 mln. US dollars

Proponent ООО «Park-City Ufa» Degree of implementation

Preparation of town-planning project

Commissioning date I quarter of 2015

Number of rooms – 200 Number of parking places – 115 Total area – 13 thousand sq. m.


HOTEL COMPLEX IN KIROVSKY DISTRICT OF UFA

Project costs: 74 mln. US dollars

Proponent ООО «Kesko» Degree of implementation Design works are carried out

Commissioning date II quarter of 2015

Number of rooms – 170 Number of parking places – 158 Total area – 36,65 thousand sq. m.


HOTEL ON MENDELEEV STREET IN SOVETSKY DISTRICT OF UFA

Project costs: 33 mln. US dollars

Proponent Group of companies «Bashinvest» Degree of implementation

Preparation of town-planning project

Commissioning date I quarter of 2015

Number of rooms – 220 Total area – 17 thousand sq. m.


HOTEL ON REVOLUTSIONNAYA STREET NEAR URALSIB BANK IN SOVETSKY DISTRICT

Project costs: 28.5 mln. US dollars

Proponent ООО «RGS Ufa» Degree of implementation Project works in progress

Commissioning date II quarter of 2015

Number of rooms – 200 Number of parking places – 158 Total area – 14 thousand sq. m.


HOTEL ON TSYURUPA STREET, IN FRONT OF MAYAKOVSKY PUBLIC GARDEN

Project costs: 54.3 mln. US dollars

Proponent ООО «Selena» Degree of implementation Project works in progress

Commissioning date I quarter of 2015

Number of rooms – 120 Number of parking places – 160 Total area – 31 thousand sq. m.


RECONSTRUCTION OF THE CONGRESS-HALL AND THE ADJACENT TERRITORY

Project costs: 22 mln. US dollars

Commissioning date: 2013-2015


RECONSTRUCTION OF OUTDOOR LIGHTING SYSTEM


WATER SUPPLY Investment project name Reconstruction of coagulation and lighting facilities of Ufa North Bucket water intake Water conduit in Kirovsky and Demsky district of Ufa urban district of the Republic Bashkortostan Water supple and water intake complex facilities of Belebei

Capacity

200 000 m² per day

23,4 km

Cost (million rub)

229,84

1792,27

25 200 m² per day 16,5 km

471,2

Total: 2493,31 Project documentation and positive findings of public examination are available


HEAT SUPPLY Investment project name

Capacity

Cost (million rub)

Heating lines reconstruction by Boiler 3,29 km 85,0 station №15 in Oktyabrskui (RB) Boiler station № 3 120,0 reconstruction in 74,8 MW/h Oktyabrskui (RB) Boiler station № 15 153,0 reconstruction in 320,6 MW/h Oktyabrskui (RB) Heat supply system reconstruction in Semiletka 2,0 km 29,094 village (Durtyuli district) Total: 509,494 Project documentation and positive findings of public examination are available


WATER DISPOSAL Investment project name

Capacity

Cost (million rub)

Sewerage system in 800 m² Chekmagush village 152,0 per day (Checmagush district, RB) Construction of biological treatment plants in 1200 m² 733,20 Semiletka village per day (Durtyli district, RB) Wastewater treatment 12000 m² plant reconstruction 525,36 per day (Durtyli district, RB) Total: 1410,56 Project documentation and positive findings of public examination are available


SIBAI CITY

The characteristics and the perspective direction of development of airport in the Sibai city Republic Bashkortostan


SIBAI CITY Population

63 950 people

Square

157,4 m²

Time zone

MSK+2

The height of the center

360 m

Gross regional product in 2011

7 billions 717 millions rubles

Infrastructure

Airport, railway station, bus station, hotels, shops, tourist bases, water sources, credit organizations

Education

2 Branches of the higher education institutions 4 Colleges

The city is located in the center of the intersection of routs between the cities of Magnitogorsk, Orenburg, Orsk; distance from the town to the main transit road Magnitogorsk-Ira-8 km

Internet

Infocom, Sibnet, Bashinform, Beeline, MTC, Megafon

Mobile communication

MTC, Beeline, Megafon

Web site

http://sibay-rb.ru


AIRPORT OF CITY SIBAI

Magnetic course landing

180/360 • • •

Runways Sizes

1920x37m 1000х75m

Taxiway The Platform of local airways The system for fuel refueling

Coating Asphalt-concrete

The total area of an airport

116 hector

The total area of the Railway stain

169 m²

Runway

Artificial runway 18/36 The unpaved runway

Lighting equipment's

The lights of low intensity

The height

+397

Coordination's

52°41′00″ nl 58°43′00″ el

Working time

The Daytime

Taken aircraft

An-24, An-74, IL-18, L-410 and lower close

soil

The platform is designed for Parking and maintenance of 2 aircraft An-24 and 5 aircraft An-28 at the same time


AIRPORT OF CITY SIBAI


THE INFORMATION ABOUT RUNWAYS In the Federal property (in leasing in International Airport Ufa)

In the property of The Republic of Bashkortostan

In the property of International Airport Ufa

• • • •

runway taxiway fencing the plot of land

100% shares of open jointstock company of International Airport Ufa

• •

air terminal administrative and industrial buildings


DIRECTION OF DEVELOPMENT OF THE AIRPORT To create a open joint-stock company

50 % contribution from the urban district Sibai in the authorized capital – license, material base of airport

The opening the cargo terminal

• • •

Delivery to equipment and spare for spinning wool factory and other industries The supply the agricultural products Delivery a mail, sends and others

The increase in passenger flow

• • • •

The development of inbound tourism, using potential ski resorts «Abzakovo», «Bannoe», health centers Talkas, Yakty-Kul’ and others The development transit lines The development domestic flights (Ekaterinburg, Kazan, Surgut and others) The development of international flights (near abroad)

The development aviation services

The complex aviation services by branches of economy

Organization of the branch of Ufa educationalmethodical Centre

• • •

Delivery to equipment and spare for spinning wool factory and other industries The supply the agricultural products Delivery a mail, sends and others


PERSPECTIVE DIRECTIONS OF AVIATION SERVICES BY BRANCHES OF ECONOMY The branches of Economy

On the directions of agriculture, forestry ecology

The types of aviation works

Expected Result

Air control the felling of forests , of planting, forest fires, injuries from pests

Increase the level of monitoring

Regulation of the state of rivers, of hydraulic structures using the water sources and observance of environmental norm

Increase the of time work

The control of performance of agricultural works

Reduction of time work

The examine of ecological situation

Increase the level monitoring, aerial photography

The monitoring of construction and condition of roads

Reduction of terms of construction of automobile roads

The monitoring of the construction of major facilities on the territory of the Bashkir Zauralye

The increase in volumes of construction, of reduction of term of construction

In the direction of construction


PERSPECTIVE DIRECTIONS OF AVIATION SERVICES BY BRANCHES OF ECONOMY The branches of Economy

The types of aviation works

Expected Result

In the direction of mining industry

The control over carrying out of mining works

Shortening the terms of time works

In the direction of tourism

Elaboration of tourism routes, escort of tourists

Shortening the terms of elaboration of routes

In the direction of healthcare

Delivery of equipment, medicines, transportation of patients

Provision of timely medical assistance

The control of the content of the high-voltage lines

Shortening the time of control

The monitoring the status of the gas pipeline and its construction

Shortening the time of control

In the direction of the electric power industry, gas industry


PROJECTS IN THE SPHERE OF INDUSTRY


POTENTIAL OF REGION Readiness index in Bashkir Republic To the information society • Information and communication technology in bussines - 7th place in RF • Information and communication technology in medicine - 14th place in RF Human Resources in Bashkir Republic • 6 Universities, 15 Representatives institutions of other regions • Ufa State Aviation and Technology University graduates about 500 IT professionals in year • The number of employees in the export of It professionals will rise to 15 thousand people in 2022

Industry Resource in Bashkir Republic • Volume of the exchange 9.5 • Export volume of the IT Market by 2022 will reach 30 milliard rubles a year


ADVANTAGES OF THE REGION Tax exemptions and subside Support of State: Tax on profits is 13.5 The Exemptions for investors: The Rates on loans will lower in Central Bank of RF The Exemptions for foreign investors: The Tax of Profits will low for organizations on 4%

Interactions with Universities Bashkir State University: The Department of Mathematics and Computer Science Ufa State University of Aviation and Technology: 61 of 25 specialties areas Ufa State Petroleum Technological Universities The Department of Automatization in Technological Process About 900 IT Professionals in Year

IT-Infrastructure Telecommunications High envelopment of mobile and broadband Internet in the cites and regions of the Republic Data processing centers • Data processing centers • OAO “Bashinform” • Supercomputer in UGATU • Data processing center of the • government of Republic of Bashkortostan Production facilities • OAO NPP «Poligon» • OAO «Promsvyaz» • OAO «Maghetron» • OAO «Molnia»


SOLID MINERAL DEPOSITS OF THE REPUBLIC OF BASHKORTOSTAN â„–

Materials

1 2 3 4 5 6 6.1

Lignite Iron ore Manganese ore Complex copper-sulphide ore Bauxite Gold Vein gold (total) Including proper gold ore complex auriferous gold Placer gold Silver Derbyshire spar (fluorite)

6.2 7 8

Number of deposits 5 20 2 24 3 32 16 16 46 26 1

9

Gangue quartz

2

10 11 12 13 14 15

Talc Pyrophyllite Rock salt Mineral colors Mineral-cotton raw materials Limestone for chemical (soda) production

4 1 3 1 1 1

Including Distributed reserves Undistributed reserves 5 4 16 2 15 9 1 2 19 7 12 11 15 Suranskoe Karayanovskoe, Novotroitskoe 4 Kul-Yurt-Tau Yar-Bishkadak

Uchalinskoe Shakh-Tau

13 9 4 35 11

2 Tirlyanskoe


SOLID MINERAL DEPOSITS OF THE REPUBLIC OF BASHKORTOSTAN №

Materials

Number of deposits

16

Limestone for cement production

3

17 18 19 20 21 22 23 24 25 26

Clay for cement production Gypsum for cement production Sands for glass manufacturing Dolomites for glass manufacturing Limestone for glass manufacturing Fluxing limestone Manganic limestone Refractory clay High-melting clay Abrasive sand

2 2 1 1 1 1 1 2 3 1

27

Lining brick

2

28 29 30

Saw stones (limestone) Semi-precious stones Phosphorite

2 7 1

Including Distributed reserves Undistributed reserves Almukhametovskoe, Shakh-Tau Yurak-Tau Michurinskoe Krasnoyarskoe Seleukskoe Karal-Tau 1 Tashlinskoe 1 Pugachevskoe Ulutelyakskoe 2 Talalaevskoe 2 Корнеевское Mansurovskoe, Tashmurunskoe 2 7 Surakaiskoe

Distributed reserves are subsoil areas, which rights of use can be granted in the manner, required by subsoil law. Undistributed reserves comprises all other subsoil areas. In the case of withdrawing the license, subsoil is transferred to such reserve.


SOLID RAW-MINERALS BASE OF THE REPUBLIC OF BASHKORTOSTAN (PROVISIONAL DATA ON 01.01.2013)

1

2 3

4

Minerals

Brown coal Iron ore Mangan ese ore Сuprum

Unit of measure

Balance reserves (residual) Total Including unallocated fund Number of facilities

А+В+С1

Ths. tons

5

Ths. tons Ths. tons

Ths. tons

С2

Number of facilities

А+В+С1

С2

251379

950

5

251379

950

20

69716

7909

16

40288

2

1138

707

2

21

5

Zinc

Ths. tons

23

6

Bauxite

Ths. tons

3

7

Gold total

Kg

75

31407176267ore ore 4996,4736,6cuprum cuprum 28499071213ore ore 5054,11680,8zinc zinc 242,1-ore 2981-ore 99,81613alumina alumina 454868

137977

Predicted reserves Unallocated fund

Number Annua; of output of developed subsoil deposits in 2012 in 2011

Р1

Р2

Р3

4314

41460

46500

327000

-

-

132450

16120

33950

6

159-ore 2,2cuprum

1289-ore 17,8cuprum

1040

8190

4000

7

86,8cuprum

10

159ore7,1zinc

2080-ore 66,4-zinc

2610

10210

2400

8

78,1-zinc

2981-ore 1613alumina

16540

1

.

21078

121140

17

7974

2 47

16139

1300710

758090

2

3 -


SOLID RAW-MINERALS BASE OF THE REPUBLIC OF BASHKORTOSTAN (PROVISIONAL DATA ON 01.01.2013)

Minerals

7.1 Vein gold total

Number of facilities

Ths. tons Kg

31

gold Ths. tons deposit Kg

16

gold in Ths. tons complex Kg ores

15

7.2. Gold placer 8 9

Unit of measure

Balance reserves (residual) Total Including unallocated fund

Silver Fluorite spar

Ths .m3 kg

57

t

26

Ths.t

1

А+В+С1

С2

31142612068ore ore 45175830369-Au Au 120685804-ore ore 16577-Au 30369-Au 30562281537ore ore 435181- 107208Au Au 348940-sands sands 8-Au 519-Au 6305,5 1759 2002-ore 760-CaF2

Number of facilities 13

34 11 1

А+В+С1

С2

3103-ore 4203-ore 14323-Au 20901-Au

13770sands 1816-Au 46,2

813sands 177-Au 87,5 2002-ore 760-CaF2

Predicted reserves Unallocated fund

Number Annua; of output of developed subsoil deposits in 2012 in 2011

Р1

Р2

Р3

110890

1288460

73983,0

12

7887-Au

110890

1288460

739820

4

228-Au

-

-

-

8

7659-Au

10250

12250

18270

5

87-Au

782,6

3135,1

3022,6

8

81,8

2200

11400

6700

-

-


SOLID RAW-MINERALS BASE OF THE REPUBLIC OF BASHKORTOSTAN (PROVISIONAL DATA ON 01.01.2013)

10 11 12 13 14

15

Minerals

Unit of measure

Balance reserves (residual) Total Including unallocated fund Number of facilities

Quartz Ths.t 2 vein Rock salt Ths.t 3 Talc Ths.t 4 Pyrophyl Ths.t 1 lite Raw materials for the glass industry Sand Ths.t 1 DoloThs.t 1 mite LimeThs.t 1 stone Limestone for Ths.t 1 chemical industry

Predicted reserves Unallocated fund

А+В+С1

С2

Number of facilities

155,6

47,1

1

24

6,3

225800

26800

2189802 1824,7

330532 84

2 -

1240245 -

-

3100

5170

612

10662

-

-

-

-

1853,2

517

-

-

-

516,2

469,2

-

-

-

76

-

1

76

25366

60200

-

-

А+В+С1

С2

Р1

Р2

Р3

Number Annua; of output of developed subsoil deposits in 2012 in 2011 -

-

92340

1 2

3684 10,9

-

-

-

-

20290

30000

1

-

-

-

-

1

-

-

-

-

-

-

-

-

95830

171000

1

3722


SOLID RAW-MINERALS BASE OF THE REPUBLIC OF BASHKORTOSTAN (PROVISIONAL DATA ON 01.01.2013)

16

17

18

Minerals

Unit of measure

Cement raw materials: Limestone Clay Limestone Limestone Manganese Clay refractory

Balance reserves (residual) Total Including unallocated fund Number of facilities

А+В+С1

Ths.t

3

Ths.t Ths.t Ths.t

Ths.t

Predicted reserves Unallocated fund

Number Annua; of output of developed subsoil deposits in 2012 in 2011

С2

Number of facilities

А+В+С1

С2

Р1

Р2

Р3

86890

53616

3

86890

53616

-

-

-

-

2

44107

51191

1

27888

51191

-

-

-

1

445

1

54326

36094

-

-

-

-

-

-

1

-

1

6499

-

-

-

-

-

-

-

-

-

2

1349

58

2


SOLID RAW-MINERALS BASE OF THE REPUBLIC OF BASHKORTOSTAN (PROVISIONAL DATA ON 01.01.2013)

19

20 21

Minerals

Gypsum for Cement Industry Facing stone Phospho rites

Unit of measure

Balance reserves (residual) Total Including unallocated fund Number of facilities

А+В+С1

Ths.t

2

48909

Ths.m3

2

11114

Ths.m3

1

755,1

С2

Number of facilities

А+В+С1

С2

366018

1

28634

366018

1035

Predicted reserves Unallocated fund Р1

Р2

Р3

Number Annua; of output of developed subsoil deposits in 2012 in 2011

1

10750

250

4

187


«BELSTAL» BELORETCHKY DISTRICT The period of realization: 2011-2014 Volume of investments – 8 551,8 mln. rub.: own funds – 1 516,9 mln. rub. the attracted funds – 7 034,9 mln. rub. The payback period – 6,7 I stage: construction of a mountain-industrial complex on production of a 1.5 million tons per year of iron ore, production of 550 thousand tons per year of high-quality pig iron, 510 thousand tons per year of cement and 20 MW per year of electricity on the basis of the use of low-waste technologies II stage: the construction of steel-smelting manufacture for melting corrosion-resistant steel and rolling production capacity of 500 thousand tons per year


THE CONSTRUCTION OF A WORKSHOP, ISSUE A «AGIDOL-110» AND STABILIZERS ON THE BASIS OF «AGIDOL-168», «AGIDOL-176», UP TO 6000 TONS A YEAR The period of realization: suspended in 2009, will be completed through 1.5 years after the resumption of financing Volume of investments – 1 158,7 mln. rub.: own funds – 606,4 mln. rub. the attracted funds – 552,3 mln. rub. The volume of productions – 6000 tons a year The payback period – 7 year Construction of the workshop for production “Aghidol-110” - stabilizers on its basis “Aghidol-168”, “Aghidol-176” - power up to 6000 tons a year “Agidol-110”, “Agidol-168”, “Agidol-176” are antioxidants and heat stabilizer for rubbers and latex polymers and adhesives


BASHKIR PAPER MILL Volume of investments – 4 163,1 ml. rub. The payback period – 10 year own funds – 49,4 mln. rub. the attracted funds – 4 113,7 mln. rub. The volume of productions – 100 thousand tons a year Create a jobs – 200 people Construction and equipping of the existing modern industrial production of cardboard packaging, industrial complex, providing the production of high-quality raw materials, obtained on the basis of resource-saving technologies of processing of processing of secondary fiber from recycled paper. The new complex is equipped with technologies and equipment for production of the necessary volumes of production with the set to the maximum and stable characteristics. The project provides for modular equipment complete sets of equipment, which allows processing the multi-layer packaging and also the possibility of additive chemical-thermomechanical pulp from wood and straw


CREATION OF INDUSTRIAL PARK «CHEMICTERRA» ON THE BASIS OF OAO «POLYEF» Duration of a project: 2012 Investment volume – 195 mln. rub. The volume of expected production – 2 000 mln. rub. The creation of the Industrial Park on the basis of «POLYEF» areas. OAO “POLYEF” is the only Russian manufacturer of terephthalic acid and polyethylene terephthalate. The capacity of TFK project is about 230 thousand tons per a year, PETF is about 120 thousand tons per a year. The availability of production spaces and possibility of expending technological chain allow to increase the production volume with the higher added cost, number of vacancies, tax revenues to the consolidated budget of the Republic of Bashkortostan by means of attracting foreign partners and creation of Industrial Park.


THE CONSTRUCTION OF THE PLANT ON PRODUCTION OF HYDROELECTRICAL AND UBSIDIARY EQUIPMENT FOR THE HYDROELECTRIC POWER PLANTS («RUSHYDRO – ALSTOM») Duration of a project: 2012-2014 Investment volume: 4 bill. rub. Creating new vacancies – 500 people Payback period – 8 year The plant is oriented to produce hydro-generating equipment for small hydropower plants (HPPs), and medium-sized hydroelectric power plants, large hydroelectric power plants, equipment for process control systems and the complex safety systems. It also includes hydro-generating equipment for hydro power stations and hydroelectric pumped storage power plants: turbine with rotors about 4.5 meters in diameter, generators and subsidiary equipment for HPPs, software for industrial HPPs automation (local automatic control systems, plant wide process control system, web monitoring and diagnostics systems, systems of stimulation and protection of generators, situational room equipment. Small and medium-sized hydroelectric generators will be produced at the plant. The production area of the factory is 22,1 thousand square meters.

The production of hydraulic turbines

The automated system of technological process control

The equipment for small HPPs


CREATION OF INDUSTRIAL AND MANUFACTURING INDUSTRIAL PARK IN THE FIELD OF ENERGY SAVING AND ENERGY EFFICIENCY (OAO “RUSGYDROBASHKORTOSTAN EFFEKTIVNOST”)

Duration of a project: 2011-2015 Investment volume – 2 bill. rub.

The concept of Industrial Park creation suggests the construction of production and office buildings, accommodation of developers and manufacturers of electrotechnical equipment on the basis of innovative technologies and companies that specialize in energy saving. Plants, assembly facilities on production of hydropower and hydrotechnical equipment, office center for the placement of small innovative companies, companies of educational and scientific centers, branches of large corporations, and also utility sector providing design, information, legal, patent, licensing, engineering services will be placed on the territory of Industrial Park.

The Industrial Park is located on the territory of 68 hectares, the area of the factory buildings - up to 395 thousand sq. m, subsidiary ones - about 81 thousand sq. m.


THE BIOTECHNOLOGICAL CLUSTER OF THE REPUBLIC OF BASHKORTOSTAN Prospective financial and industrial partners

Pilot Plant of GosNIIgenetics

Birsk ООО NPO «BioBirsk»

Biotechnopark

Ufa

Cluster residents

Social-business zone

Realization period: 2013-2020 Amount of investment – 7 600 mln. rub., including: • Proprietary funds – 2 700 mln. rub. • Borrowed funds – 4 900 mln. rub. Volume of production – 200.000 tons a year Payback period – 5 years

Clusters produce

• • • • • • •

Glucose, fructose Gluten, Lysine Starch, modified starch Amino acids (L-lysine, L-methionine, L-tryptophan, etc.) High molecular polymers Organic acids (itaconic, amber, milk) Feed supplements, fed stuffs


BIO PHARMACEUTICAL TECHNOPARK Prospective residents of Texnopark

БашИнком

Ufa

Institute of biochemistry and genetics UNTs RAN

Institute of biology UNTs RAN

On Ufa territory, land property’s square is – 9 ha Produce of Texnopark’s Residents:

Realization period: 2013-2020 Amount of investment – 3 350 mln. rub., including: • Proprietary funds – 350 mln. rub. • Borrowed funds – 3 000 mln. rub. Payback period – 5 years

• • • • • •

Specific immunobiotics Biopharmaceuticals for waste reclamation Veterinary preparations New generation vaccines protein and peptide-based preparations Cell technology-based preparations


OIL AND GAS CLUSTER OF THE REPUBLIC OF BASHKORTOSTAN

Indicator name

Measurement Unit

2011

2015

2020

1

Oil and gas produce shipment

Bln.rub

254,9

491,4

890

2

Petro chemistry Investment

Bln.rub.

62,3

139,8

213,9

3

Output stock list

Units

160

260

500

Number 1 in Russia’s production of (mln. tons): • Crude oil distillation – 27,6 • Automobile gasoline – 5,2 • Diesel oil – 9,5 • Sodium carbonate – 1,6

Number 2 in Russia’s production of (ths. tons): • ethylene – 361 • benzole – 175 • plastic in initial forms – 635 • synthetic rubber – 353


CLUSTER’S PARTICIPANTS

ОАО «Ufa Oil Refinery» ОАО «new Ufa Oil RefineryNovoil» ОАО «Ufaneftekhim»

ОАО «Kaustik» ОАО «Sintez-Kauchuk» ОАО «Soda» ОАО «Gazprom neftekhim Salavat»

By 2012, totally – 500 oil and gas produce names

ZАО «Pilot Plan neftechim» ООО KhTTs «Ufa Aerjnautical Institute» ООО «Neftekhimtrading-Region» ООО «Bash-Iordan» ООО «Avista» ООО «Klarisa» OOO «Polex Ural» ZАО «Amur & Co» MUP «Sursis» GUP «Institute of Petroleum Refining and Petro chemistry of the Republic of Bashkortostan» ООО «Sterlitamak Catalysts Plant» ООО «Bashplast» ОАО NPO «Tekhnolog» ООО «Ishimbay Specialized Chemical Plant of Catalysts» ООО «Bitum»


«CONSTRUCTION OF THE PLANT PRODUCING POLYCRYSTALLINE SILICON»

The project initiator: ZAO «Polysilikon» Period of the project execution: 2012-2015 Volume of investment is 15,2 bln. rub. Project payback period about 5 years New jobs will be available for 400 people


«CONSTRUCTION OF THE PLANT PRODUCING POLYCRYSTALLINE SILICON»

The plant will be built in accordance with the ecologically –clean license technology “Siemens-Silasorb”. The plant will be situated on the territory of Sterlitamakskiy district of the Republic of Bashkortostan on the site with the total area of 90 ha


«CONSTRUCTION OF THE PLANT PRODUCING POLYCRYSTALLINE SILICON»

Financial indicators: IRR project – 18,5% NPV project – 2 754 425 rub. Payback period about 5 years For the successful realization of the project it’s necessary to attract investments in an amount of to 8 bln. rub. The rest amount (7,2 bln. rub.) will be invested by the initiator of the project


AGRO INDUSTRIAL COMPLEX PROJECTS


BASHKORTOSTAN IS HONEY REGION OF RUSSIA Republic of Bashkortostan ranks № 1 in honey production and bee-families since 2003 Bee-families amount: Total in RB – 344.500 Zauralie – 28 223 Produced: RB: 6048 tons of marketable honey Zauralie : 3923,2 tons of marketable honey

Honey resources in the republic are about 525.000 tons Witch includes – 175.000 tons, or 33 % Honey resources of Bashkortostan let support 1.350.000 families


BASHKORTOSTAN IS THE ONLY PLACE WHERE FOREST BEE-KEEPING (FOREST WILD HONEY PRODUCTION) IN PRESERVED AS ECONOMY In order to preserve forest beekeeping, a branch of Bashkir State Reserve was established, which was later reformed to the state natural park «Shulgan-Tash»

Wild honey production process

Burzyan wild live bee


EFFICIENT DEVELOPMENT OF BEE-KEEPING CONDITIONS 1)

Rich natural and cultivated honey flora about 4000 species

2)

Unique Bashkir species of honey-bees

3)

Scientific and educational centers working with skilled personnel

4)

Factories producing bee-inventory and beeswax foundation

5)

Legal basis

Stud farm raising Bashkir species of honey-bees


BASHKIR HONEY ON INTERNATIONAL MARKET The state agency “Bashkir scientific and Research Center of bee-keeping and apitherapy” supplies Bashkir honey to: • USA (GM Natural Products Inc.) • France • Japan • Kuwait Incoming trends: • Raising Bashkir species of honey-bees; • 200 species of medical and preventive, nutrition products and cosmetics supply; • Advanced training of specialists; • Scientific research


HORSE BREEDING IN THE REPUBLIC OF BASHKORTOSTAN (FOR 01.01.2013) The Republic of Bashkortostan ranks: 2 in horse livestock (125,1 heads) 1 in kumis production (beverage made of horse milk) Horse livestock: Total – 125 106 Zauralie – 35 436 Kumis production: Total : 2 992 tons Zauralie : 1 554 tons (Abzelilovskiy region – 706 tons) The republic has 16 breed livestock farms


CONDITIONS FOR EFFICIENT HORSE BREEDING DEVELOPMENT 1) Pastures square is 2,2 mln. ha, hayfields square is 1,1 mln. ha

2) Unique Bashkir horse breed 3) State horse breeding support 4) Legal basis

5) Scientific and educational centers preparing skilled personnel. The Intergovernmental Council developing horse breeding in the Republic Bashkortostan 6) Breed livestock farm


SHEEP BREEDING IN THE REPUBLIC BASHKORTOSTAN The Republic ranks № 5 among territorial subjects of Russia according to sheep and goat livestock in all natures of household Sleep and goat livestock:

Total – 815 354 Zayralie – 180 480 Wool clip: RB: 2 119,6 tons Zayralie: 408 tons

Conditions for efficient sheep breeding development: 1) Pastures square is 2,2 mln. ha 2) Breed livestock farms 3) State sheep breeding support

Soviet Nerino, Komanovskaya, Kuibushevskaya, Prrecoce, Texel

Breeds of sheep are raised in the republic


«CONSTRUCTION OF A COMPLEX FOR HIGH-LEVEL PROCESSING OF WHEAT WITH THE OUTPUT OF GLUCOSE-FRUCTOSE SYRUP IN BIRSK DISTRICT»

«BIOBIRSK» Research and Production Association LLC Volume of investment – 2,5 bln. rub. Annual capacity – 130 000 tons of wheat New jobs are planned to be available for 175 people


«CONSTRUCTION OF A COMPLEX FOR HIGH-LEVEL PROCESSING OF WHEAT WITH THE OUTPUT OF GLUCOSE-FRUCTOSE SYRUP IN BIRSK DISTRICT»

Volume production (tons per year): Starch - 52 732 tons High-maltose syrup (glucose) - 318 399 tons Pelleted feed - 411 575 tons per year Dry gluten - 39 833 tons


«CONSTRUCTION OF A COMPLEX FOR HIGH-LEVEL PROCESSING OF WHEAT WITH THE OUTPUT OF GLUCOSE-FRUCTOSE SYRUP IN BIRSK DISTRICT»

Financial indicators: IRR project – 31,30% NPV – 2 155,93 mln. rub. PBP – 5,97 years DPBP– 5,86 years Sources of financing: Internal funds – 1 bln. rub. (40%) Funds to be attracted – 1,525 bln. rub. (60%)


«CONSTRUCTION OF THE PLANT «BIOPOLYMER» LLC FOR GRAIN PROCESSING IN KARMASKALINSKIY DISTRICT IN THE REPUBLIC OF BASHKORTOSTAN»

Volume of investment: 24 bln. rub. 2 stages of the project: I – construction of the enterprise for production of dry gluten, starch, modified and native biopolymers by method of processing of wheat – (400 000 tons per year) II – creation of raw materials base - agricultural production (100 000 ha)


PROMISING INVESTMENT PROJECTS OF AGRICULTURE

Sugar mills development ~ 2,5 bln. rub.

Colza recycling plant construction ~ 400 bln. rub.

Agro-industrial complex

Wholesaledistributional centre construction ~ 2,9 bln. rub.

Animal waste recycling plant construction ~ 1,5 bln. rub.


SUGAR MILLS MODERNIZATION OOO “BASHKIR SUGAR COMPANY” OOO «Bashkir Sugar Company» Management company more than 2 bln. roubles (including 1,8 bln. rub. - credit indebtedness; 0,3 bln. rub. - modernization cost)

OOO “Raevsakhar” Sugar mill

OOO “Karlamanskiy Sakhar” Sugar mill

Modernization ~ 300 mln. rub. • Preservation of plant assets of the republic of Bashkortostan • Effectivization of sugar-beet cultivation in sugar mills areas • Increase in plants productive capacity • Preservation of 1800 jobs and providing new ones


OOO “RAEVSAKHAR”

Within the framework of the project the reconstruction of lime milk purification station, modernization on the basis of manufacturing equipment acquisition and beet end automatization are in the planning stage. Year built – 1984 Sugar-beet refinery capacity – 3200 tons per day Raw sugar refinery capacity – 700 tons per day Employment volume – 723 people Beet output in 2012 – 150.000 tons Estimated refinery capacity – 4000 tons per day Estimated beet output – 270.000 tons

Operating performance


OOO “KARLAMANSKIY SAKHAR”

Within the framework of the project the reconstruction of gas-distributing and delivering devices, partial pipeline and units replacement and purchase of beet harvester are in the planning stage.

Year built – 1951 Sugar-beet refinery capacity – 1700 tons per day Employment volume– 794 people Beet output in 2012 – 215.000 tons Estimated refinery capacity – 3000 tons per day Estimated beet output – 270.000 tons

Operating performance


THE CONSTRUCTION OF THE OILSEEDS AND COLZA RECYCLING PLANT MANUFACTURING FEED STUFFS IN ILISHEVSKIY DISTRICT OF THE REPUBLIC OF BASHKORTOSTAN The project provides for the designing, construction and introduction of a centre receiving, drying, cleaning, storing and processing colza over 100.000 tons per year. Investment volume – 396 mln. rub.

Project payback period – 36 months Implementation stages: • 1 stage (2013-2014) – expansion of receiving 100.000 tons of colza seeds, storing over 50.000 tons of raw material and seed-oil production (150 tons per day) • 2 stage – expansion of storing and processing over 100.00 tons of colza per year


CULTIVATED AREAS OF COLZA IN THE NORTH-WEST OF THE REPUBLIC OF BASHKORTOSTAN

The square of cultivated areas in the Republic of Bashkortostan is 622.000 ha


ANIMAL WASTE RECYCLING PLANT IN BLAGOVARSKIY DISTRICT OF THE REPUBLIC OF BASHKORTOSTAN The aim of the project is collecting, storing, transporting, recycling and disposal of animal waste on the territory of the republic of Bashkortostan, derived products implementation and consideration to avoid negative influence on the environment, human and animal health. About 100 jobs will be offered during the project realization. Investment volume – 1,5 bln. rub Payback period – 5 years

Estimated capacity of the project: Two processing lines will operate at the factory to recycle collected raw materials. The factory’s capacity of recycling will get 60.000 tons of animal waste.


EXPORT POTENTIAL Grain

Cattle and poultry

Potatoes

Vegetables

Milk

Volume of production, thousand. tons

3000

415

100

350

2000

Sales volumes, thousand. tons

1200

280

340

130

850

Marketability, %

40

67,5

26

37

42,5

Indicator name


CONSTRUCTION OF WHOLESALE-DISTRIBUTION CENTRE

Republican wholesaledistributional centre Interdistrict wholesaledistributional centre


INTERACTION PATTERN OF PRODUCER AND CONSUMER Agricultural producers

Interdistrict wholesaledistributional centre (5)

Of republican wholesaledistributional centre

Holding

The main storage Sorting, washing

Packing

Main consumers


TOTAL REVENUES OF THE PROGRAM PERIOD

Total revenues of three years of the program 93 bln. rub. + 3650 Mln.rub

+ 1 800 Mln.rub

28600

2013

30400

2014

34050

2015


AMOUNT OF FINANCING

The total amount of funding 2 850 mln. rub.

600

2013

700

2014

extrabudgetary resources 1 900 mln. rub.

600

2015

300

350

300

2013

2014

2015

the funds of the budget of the Republic of Bashkortostan 950 mln. rub.


GOVERNMENT SUPPORT OF PRIORITY PROJECT OF REPUBLIC BASHKORTOSTAN

Financial measures of government support: • • • • •

Repayment of credit interest rate (1/2 of rate of Central Bank of Russian Federation refinancing) Partial compensation of capital costs of equipment purchase, livestock Construction and repayment of costs of external engineering infrastructure Tax remissions (property tax, income tax) Benefits on ground areas rent

Management measures of government support: • • • •

Choice and design of ground areas Development of engineering-transport infrastructure Preparation and confirmation of necessary documentation Relations with supervising authorities



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.