Victoria Bryant Portfolio

Page 1

Victoria Bryant

PORTFOLIO


Victoria Bryant 917.291.0288 | vgbryant@gmail.com

Objectives Education

To acquire a full-time position in the design industry that engages my passion for artistic expression and utilizes my design and architectural skills. Master of Architecture | May 2013 Tulane School of Architecture, New Orleans, LA Full Tuition Merit Scholarship Ogden Award: Top 16 Thesis Honor, 2013 Graduate Research Fellow & Teaching Assistant Bachelor of Arts in Growth & Structure of Cities, Architecture Concentration | May 2009 Bryn Mawr College, Bryn Mawr, PA

Work Experience

Architectural Designer | Eskew Dumez Ripple+ | New Orleans, LA | April 2019 - present sCurrently lead designer of an aquarium addition & renovation. Leading design concepts, producing drawings, renderings, 3D virtual walkthroughs and coordinating with consultants. sProduced SD, DD & CD architectural sets for several civic & cultural and education projects. Job Captain | Bowerbird Architects | Brooklyn, NY | April 2017 - April 2019 sManaged several single & multi-family residential renovations & new construction projects from schematic design through completion. sOversaw construction administration for all projects within my purview. sProduced full architectural SD, DD & CD sets. sPrepared renderings and drawings for NYC Landmarks Preservation Commission submissions. Architectural Designer | Beyer Blinder Belle Architects | New York, NY | May 2015 - April 2017 sCompleted 100% Construction Document set for a high-rise residential tower in the Upper East Side of New York City. Reviewed submittals and RFIs during construction. sProduced schematic design apartment layouts for eleven residential buildings for a 50-acre development planning project in Denver, Colorado. sProduced drawings, diagrams and renderings for the schematic design phase of a five-story residential project in Jersey City, New Jersey. Junior Architect | Platt Byard Dovell White Architects | New York, NY | June 2013 - May 2015 sProduced renderings and 2D drawings modeled in Revit for the Schematic Design & Design & Development phases for St. David’s School in the Upper East Side of Manhattan. sCompleted Construction Drawings in AutoCAD for luxury condominium in Harlem, New York, and a historic yacht club in Bayhead, New Jersey. sAssisted with Design & Development of the Park Avenue Armory in New York City. sCompleted site measurements, site documentation and various drawings and diagrams in AutoCAD and the Adobe Suite (Photoshop, Illustrator, InDesign). Architectural History Teaching Assistant & Graduate Research Assistant | Tulane School of Architecture | New Orleans, LA | 2010–2013 sResearched re-using recycled materials for architecture projects. Graded papers & exams.

Skills

Computer: Revit, AutoCAD, Rhino, Vray, Sketchup, Photoshop, Illustrator, InDesign Relevant Skills: 3D Printing, Laser-Cutting, Woodworking, Photography, Plant Enthusiast, Pianist


projects Professional Work

Academic Work

03

Audubon Aquarium | New Orleans, LA Eskew Dumez Ripple+

05

New Orleans Museum of Art | New Orleans, LA Eskew Dumez Ripple+

07

Sussman Duplex | Brooklyn, NY Bowerbird Architects

09

St. David’s School | New York, NY PBDW Architects

11

New Orleans Jazz Museum | New Orleans, LA Senior Thesis, Tulane University

13

Light Receiving Plaster Mold | New Orleans, LA Tulane University


audubon aquarium | NEW orleans, la

ADMIN

O R C

PISCES ROOM

It w p t p

THEATER

I

THEATER LOBBY

T c

W ENTRANCE LOBBY

E

ON AQUARIUM OF THE AMERICAS | VCC REVIEW

Project Summary Audubon Nature Institute had a vision for a new, quality entry experience serving both the existing Aquarium of the Americas and a relocated Insectarium. A new lobby and reversed aquarium flow will provide an updated first impression and centralized entry for both attractions. A small addition will house this extended lobby and an iconic butterfly exhibit. An existing giant screen theater will be decanted and re-invented to incorporate the Insectarium, a new event space, and a centralized office suite. GULF TANK TO 1STFL

T s a s e a a

EDUCATION

A

A t r C T t w s t

INSECTARIUM DAY LIG HT

AQUARIUM

EVENT ADMIN

PROJECT contribution Lead Designer: Leading design concepts, producing drawings, renderings, 3D virtual walkthroughs and LEVEL 02 consultants. coordinating with AUDUBON AQUARIUM OF THE AMERICAS | SCHEMATIC DESIGN AND PROGRAMMING 28 SEPTEMBER 2020

EVENT

GULF TANK

AQUARIUM RESTAURANT LEVEL 01

ENTRY

ENTRY

PROPOSED FLOOR PLAN AND FLOW

03

AUDUBON AQUARIUM OF THE AMERICAS | SCHEMATIC DESIGN AND PROGRAMMING 28 SEPTEMBER 2020

10


Zone 2: Threshold condition that leads to large, open flexible workstation space; informal inclusion and innovation space

ADMIN SUITE

AUDUBON AQUARIUM OF THE AMERICAS | SCHEMATIC DESIGN AND PROGRAMMING 28 SEPTE

Restaurant: Warm Shell & Test Fit ANI recognizes the need for spaces of respite from a busy, fully programmed day at the Aquarium and

04

a valuable connetion to the exterior plaza for overflow dining and afterhours entry.


NEW ORLEANS Museum OF ART | NEW orleans, la

16

15

14

13

12

11

10

EXISTING METAL COPING 16'-1 1/2"

8'-9"

19'-4"

19'-4"

13'-0"

8'-8"

EXISTING METAL FLASHING GUTTER (07 62 00), REF. 03/4.2 DOWNSPOUT (07 62 00)

EXISTING ROOF MEMBRANE ON PRE-CAST WALL PANEL ALUMINUM SKYLIGHT SYSTEM (08 60 00)

02 5.1

Project Summary AXON AT GUTTER 04 ENLARGED SKYLIGHTSTAIR EXTERIOR - DAY - OPTION 01 The NewENTRY Orleans Museum of Art houses more than 40,000 works of art encompassing 5,000 years of history. In its mission to serve as a multi-faceted cultural convener for all audiences, NOMA went through renovations to create a flexible, contemporary auditorium space to celebrate the visual and performing arts. The overall scope includes a renovation to Cafe NOMA, a restaurant located on the museum’s grounds.

05 5.1

NOMA Cafe | Schematic Design 07 October 2019

34

REF. 4/4.1 FOR ENLARGED DETAIL

PROJECT contribution Designer: Produced DD & CD drawings and renderings. Detailed all exterior renovation conditions. Coordinated consultants for scope areas of focus. - SECTION 03 SKYLIGHT AXONwith

04 4'-3"

4'-3"

4'-3"

4'-3"

4'-2"

4'-2"

4'-2"

4'-2"

4'-2"

4'-2"

4'-2"

4'-2"

9"

01

+/- 2 1/2" TO FACE OF WALL, V.I.F.

08 4.2

4'-3"

1 1/8" / 12"

4'-3"

2" / 12"

4'-3"

1 5/8" / 12"

4'-3"

2 5/8" / 12"

4.2

4'-3"

2 3/8" / 12"

+/- 1'-8 1/2" V.I.F.

8 1/2"

2 3/4" / 12"

V.I.F.

4.2

03 4.3

07 4.2

05 4.2

01

02

P15

P51

06 4.2

03

4.3

4.2 P45

4.3

7 3/4" TO FACE OF WALL

2 7/8" / 12"

2 7/8" / 12"

2 7/8" / 12"

2 7/8" / 12"

2 1/2" / 12"

2 3/4" / 12"

2" / 12"

2 1/4" / 12"

1 5/8" / 12"

3/4" / 12"

4.3 1 1/8" / 12"

04

4.2 02 P55

V.I.F. TO FACE OF WALL

P50

03

03

5.1

5.1

P15 P45 4.4

P56 01

4.4 04

04

4.4

P52

Sim

P52

TYP

02 5.1 5'-6"

9'-0"

9'-0"

9'-0"

9'-0"

9'-0"

9'-0"

4'-0"

6'-0" 1'-1 3/4"

70'-7 3/4"

09

05 AXON 02 SKYLIGHT

CAFE GLASS DISPLAY - OPTION 01 NOMA Cafe | Schematic Design 07 October 2019

08

07

06

05

04

03

02

01

01 ROOF PLAN 5.1

1/8" = 1'-0" 14


EskewDumezRipple 365 CANAL STREET, SUITE 3150 NEW ORLEANS, LOUISIANA 70130

09

08

15

07

14

06

05

13

04

03

02

12

01

11

ACOUSTIC PANEL (09 80 00)

05 8.4

LG-1

LG-1

LG-1

LG-1

LG-1

LG-1

LG-1

LG-1

LG-1

LG-1

LG-1

LG-1

LG-1

LG-1

LG-1

LG-1

IG-2 FIXED PANEL

IG-2

IG-2

IG-2

IG-2

IG-2 FIXED PANEL

LG-1

LG-1

IG-2

IG-2

IG-2

IG-2

IG-2

IG-2

LG-1

LG-1

EQ.

EQ.

EQ.

EQ.

16'-0"

LG-1

LG-1

LG-1

LG-1

EQ.

GENERAL NOTE: ALL CAFE GLASS TO BE REPLACED WITHIN EXISTING HOPE SYSTEM. EXISTING FRAMES TO REMAIN UNLESS OTHERWISE NOTED.

5'-3"

EQ.

EQ.

16'-1" V.I.F.

EQ.

16'-3 1/4" V.I.F.

EXISTING OPENING

EXISTING OPENING

03 NORTH ELEVATION 1/4" = 1'-0"

2.1

04

13

05

06

14

07

15

12/20/2019 3:59:56 PM

1 1/2"

3/8"

1/4" = 1'-0"

1'-4"

4'-0"

12 0

CAFE 255

03

8.2

03 8.14

8"

20 0

CAFE 243

P8

20'-11"

E

C

C/F

KITCHEN 251 255A

04

10 0 44

10 0 44

05 8.3

8.3 F.E.C.

D 02 8.14 20 0

01

01 8.14 01

CL

5.1

8.3

P3 P5 P6 P7

P53

1/4" = 1'-0"

P8

C

B

P10

24'-3 183/256"

02

P37 P39

01

03

COURTYARD 244

26 0 44

04 5.1

6.1

8.2

244B 27'-6"

V.I.F. 19'-4"

V.I.F.

16'-6 1/2"

V.I.F. 19'-4"

244A

01

10'-3 1/2"

STORAGE 257

16'-8 1/4"

174'-9"

244C

P38

05 1.10

P49

240B

264

P39 P48 P49

263

22 0

P11

10'-9 3/4"

257 P33 22 0

38'-11"

CATERING 240

1' - 3 1/2"

240A +/- 10'-11"

2'-10 1/2"

8.1

5.1

02 8.12

02

VESTIBULE 239 04

22 0 8"

P33

8.1

04

AUDITORIUM 236

03

EDR PROJ PROJECT

5.1

22 0

3.2

GREEN ROOM / STORAGE 238

8.1 02

8.12

238 06

20 0

10 0 44

01

1 Collins D New Orlean

22 0

03

05

15 2 44 01 8.13

P7

UP

© Eskew+D A Professio

22 0

26 0 44

20 0

256

A P7

8.12

REVISION

02

26 0 44

5.1

P37

P38

The intent of th execution and are compleme by all; perform consistent with being necessa

15'-10 3/4"

4.4 04

1'-1 1/4" V.I.F.

9'-11"

UP

22 0

8'-6 1/4"

01

P34

20 0

P53

MECH REF. CONT REINS STAIR PROV 02/8.2 EXIST EDGE PROJ ALUM EXIST MECH EXIST 2 HR. PAINT 2HR D PART AUDIT APPL RATIN ASSE MEMB 2HR R PEDE PREP 13) EXIST HARD

NOMA RENOV

11 3/4"

22 0

V.I.F.

08

6.1

15 2 44

239 03 27'-5 1/2"

03 7.1

17'-11 1/4"

P13

EQ.

P12

EQ.

P34

CONTROL ROOM 256

B

02

20 0

P10 P11 P12 P13 P14 P15 P31 P33 P34 P36 P37 P38

P48

F.E.C.

20 0

10 0 44

ALL DIME MINUS AN SITE.

RENOVAT (UNLESS

P5

DISHWASH

P34

22 0

FOR ROO CLARIFIC PARTITIO

4.

20'-11"

F.E.

DRAWN BY | BRYANT

5 1/4"

6.2

UNLESS O REFLECT

3.

51 2 ICE

FIRST FLOOR PLAN - MECHANICAL PLATFORM

P33

4"

A 3'-6"

LIMIT OF WORK

9'-0" 13'-4"

10"

3'-6"

9'-0"

9'-0"

9'-0"

9'-0"

9'-0"

9'-0"

4'-0"

6'-0"

1'-1"

68'-7"

09

09

08

5.1

1/4" = 1'-0"

07

06

05

04

03

02

01

N

01 FIRST FLOOR PLAN

AT AUDITORIUM 236

1.10

1/8" = 1'-0"

DRAWN B

06

AUDITORIUM VESTIBULE ENTRY 26

FIRST

TH R O N

02 CONTROL ROOM FLOOR PLAN

08

E U TR

C:\PROJECTS\RVT2019\13034_NOMA Auditorium\13034_ARCH_R19_vgb.rvt

6.2

251B

8.3

6.2

22 0

NOMA Cafe | Schematic Design 07 October 2019

01

251A

48" DOOR

INTERIOR ELEVATIONS COURTYARD

01

OPEN TO BELOW

03

BANQUET KITCHEN

251C UP

02

AT COURTYARD

2.

P3 EXISTING MOP SINK

38'-11"

2.1

F

19'-10"

F

REVISIONS

SOUTH ELEVATION 4'-0"

01 UP

P15

09 8.6

UNLESS O DIMENSIO

4'-2 1/2"

IG-2

13'-4 1/2"

IG-2

EXISTING PLATFORM

IG-2

NEW PLATFORM REF. STRUCTURAL

IG-2

3' - 10 1/2"

IG-2

CUT BACK EXISTING BLOCK C

H

IG-2

P14

LG-1

20'-11"

S

18' - 0 5/8"

LG-1

CONDENSING UNIT BELOW, REF. FOOD SERVICE

WALL

1.

05 5.1

C

IG-2

LG-1

10"

IG-2

IG-2 FIXED PANEL

10'-2 1/2" V.I.F.

LG-1

IG-2

IG-2

PLASTER WALL FINISH BELOW 16'-0"

3.2 7 1/2"

2 1/4" GAP IN BETWEEN F.F. & PLASTER

03

12

A EC NA T

3/4"

1 5/8"

3"

3 7/8"

3 1/8"

1 7/8"

7/8"

3/8" 24'-8 3/4"

HEIGHT TO BOTTOM OF WALL CURVE A.F.F.

IG-2 19'-4"

5.1

The intent of the Contract Documents is to include all items necessary for proper execution and completion of the work by Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results.

AIR IN

IG-2

13

SEMI

GENERAL

02

AIR OUT

IG-2

IG-2

F.E

G

REG. NO. 3650

TE I IS I S OF LO U I T T ER E D A RCH

© Eskew+Dumez+Ripple 2019 A Professional Corporation

04 SECOND FLOOR PLAN - GALLERY

L. DU ME

C CC

IG-2

T

E EV

D

IG-2

CONTINUOUS DIFFUSER GRILLE; REF. MECH. FOR PRODUCT

5.1

RECE

SURF

01 8.4

IG-2

CLARIFICA FIRE EXTI

F.E.C

07

IG-2

365 CANA NEW ORL

F.E.C

8.6

IG-2

Esk

F.E.C

PROJECT ISSUE DATE | 27 DEC 2019

18'-8 3/4"

IG-2 FIXED PANEL

32 8"

EDR PROJECT NO. | 13034

D

IG-2

10

8'-8"

LIMIT OF WORK

GALLERY 259

IG-2 = 1'-0" 1/4"

13'-0"

Z

CUT PENETRATION IN EXISTING CAST-IN-PLACE WALL FOR NEW RETURN AIR GRILLE, REF. MECH.

IG-2

11

19'-4"

1 Collins Diboll Circle New Orleans, LA 70124

A G RE

EXISTING CONRETE WALL

IG-2

12

19'-4"

DC C

5 1/8"

RE-INSTALL EXISTING BASE ON NEW WALL

ST

L WINDOW FRAMING AT 3RD ON FROM FINISHED FLOORING

2 3/4"

P36

ACOUSTIC PANEL (09 80 00)

IG-2

13

8'-9"

NOMA AUDITORIUM COMPLEX RENOVATION

4 1/2"

B

44 2

COORDINATE EXACT LOCATIONS OF SPRINKLER HEADS WITH ARCHITECT

IG-2

14

16'-1 1/2"

P31

IG-2

15

85'-10 1/2"

4.3

E WALL

09

15'-7 1/4"

06

EL FRAMING ABOVE NEW SUPPORT EXISTING STEEL ABOVE, REF. STRUCTURAL

08

16

1'-6 1/2"

D

03

C

02

C

12

H

01

H

11

NOMA Cafe | Schematic Design 07 October 2019

H

COURTYARD VIEW - NIGHT

AT COURTYARD


sussman duplex | brooklyn, NY

VERTICAL DOOR CUT-OUT PULLS FOR CABINET VERTICAL DOORS DOOR CUT-OUT PULLS FOR CABINET DOORS

312"

EQ

1 4"

HALLWAY

EQ

1 4"

HALLWAY

4"

MEDICINE CABINET

1 1 1 1 2" 13" 8" 2" 13" 8" 4 4

DRAWER INTERIOR

1'-8" 1 2"

4"

1 3 2" 4"

1'-1"

ALIGN

DN

E 3

1 4"

E 4

CONSTRUCTION SE ADDENDUM CONSTRUCTION 07/20/2018 SE ADDENDUM 07/20/2018

E 4

1" 4

D 2

7'-113 4"

3/4" H X 1/4" W WOOD STOP AROUND DOOR FINISHED FLOORW/ PUSH-BUTTON, MAGNETIC

3'-1" 3'-1"

4" TYP.

4"

6'-11"

WD HANDRAIL

1/2"Ø PAINTED STEEL RODS AT 4" O.C., WELDED TO 1-1/2" X 1/4" 1/2"Ø PAINTED THK. HORZ STEEL RODS AT PAINTED STEEL 4" O.C., BARS ATWELDED TOP TO X 1/4" AND1-1/2" BOTTOM THK. HORZ PAINTED STEEL BANISTER BARS AT TOP SPINDLES AND BOTTOM DRILLED INTO WOOD BANISTER FLOORING SPINDLES TYP.; SECURE DRILLED VERTICALINTO WOOD SUPPORT TO FLOORING FLR. STRUCT. TYP.; SECURE VERTICAL E 4 SUPPORT TO FLR. STRUCT.

E 4

7'-0"

1'-0" HOLD 6'-11" 1'-0" HOLD

7'-0"

4" TYP.

BRACKET EVERY 3FT O.C. (IF POSSIBLE) BRACKET EVERY 3FT O.C. (IF POSSIBLE)

2'-6"

1" 3'-72 1" 3'-72

PTD LAQUER MDF ADJ WOOD SHELVES, DOORS TYP. 3/4" H X 1/4" W WOOD STOP PTD LAQUER MDF AROUND DOOR W/ DOORS PUSH-BUTTON, MAGNETIC

WD HANDRAIL

195A 6th Avenue Brooklyn, NY 11217 195A 6th Avenue Brooklyn, NY 11217

PANTRY, MEDICINE CABIN HALLWAY INTERIOR DET PANTRY, MEDICINE CABIN HALLWAY INTERIOR DET

2'-6"

1 4"

GFI SEP. CIRCUIT FOR MICROWAVE. ADJ WOOD SHELVES, SEE ELEC. DWGS TYP.

D 2

D 2

PANTRY

PANTRY

D 2

7'-113 4"

1" 3" 4

1" 1'-54

3" 4

3" 4

3" 4

1'-51 4"

3" 4

FINISHED FLOOR

1"

1"

3" 4

LEGEND:

RESTORED BRICK

TILE (DIAGRAMMATIC)

MILLWORK RESTORED BRICK

STONE TILE (DIAGRAMMATIC)

LEGEND:

PAINTED MDF MILLWORK

07

1"

3'-0"

E 2

3/4" H X 1/4" W WOOD STOP 1 " SINGLEDOOR LEG REVEAL 4 AROUND W/ AROUND PANTRY PUSH-BUTTON, MAGNETIC

SEE TYP. CABINET GFI SEP. CIRCUIT DETAILS D1-D3 ON FOR MICROWAVE. A504 SEE ELEC. DWGS

FINISHED PORCELAIN FLOOR BASEBOARD

1" DN

1"

1 4"

1 4"

7'-0" 7'-0"

1 4" 1" 3'-72

1" 3'-94 3'-91 4"

E 2

E 2

GYP WALL IN BATHROOM

1" 3'-72

1 4" SINGLE LEG REVEAL

71 4" TYP.

SINGLE LEG REVEAL AROUND PANTRY

SEE TYP. CABINET DETAILS D1-D3 ON FIXED A504 SHELF

GYP WALL IN TOWEL BAR BATHROOM CENTER W/ CAB.

FINISHED FLOOR

EQ

3'-0"

2 ADJEWOOD SHELVES

TOWEL BAR CENTER W/ CAB.

PORCELAIN BASEBOARD

EQ

1 4" SINGLE LEG REVEAL

1 4"

FIXED SHELF

E 1

1 4"

4"

3'-41 4"

3'-41 4"

ADJ. GLASS SHELVESE 1

1 4"

EQ

3/4" H X 1/4" W WOOD STOP ADJ WOOD SHELVES AROUND DOOR W/ PUSH-BUTTON, MAGNETIC

3'-41 4"

3'-41 4"

MEDICINE CABINET

ADJ. GLASS ADJ. GLASS SHELVES SHELVES

EQ

E 3

PTD WOOD ADJ. GLASS DOOR SHELVES MEDICINE CABINET

1 4"

D 1

5" 8

ALIGN

1'-1"

1" 4

ALIGN

4"

1 3 2" 4"

1" 4

PTD WOOD DOOR

ALIGN

1 4"

1 4"

1 2"

1 4"

D 1

5" 8

1'-8"

D 1

1" 12

71 4" TYP.

1" 4

D 1

PANTRY

1 1" 4"

CUT OUT BEHIND VENEER TO INSERT HARDWOOD CUT OUT CUT BEHIND CUSTOM VENEER TO HANDLE INSERT HARDWOOD CUSTOM CUT HANDLE

1 2" 11" " 122

MEDICINE CABINET PANTRY

PROJECT contribution Job Captain: Managed & coordinated all phases of project. Produced SD, DD & CD drawings. Oversaw construction administration. Prepared renderings and drawings for NYC Landmarks Preservation Commission & Community Board presentations. PAINT BACKING TO MATCH EXTERIOR OF PAINT DRAWERS BACKING TO MITER MATCH HANDLE, EXTERIOR OF PAINT TOP DRAWERS SECTION MITER HANDLE, PAINT TOP DRAWER SECTION INTERIOR

FINISHED FLOOR

Architect Daniel Kaplan, RA Bowerbird Architect Architects, PLLC 387 9th Street, 1st. Floor Daniel Kaplan, RA Brooklyn, NY 11215 Bowerbird Architects, PLLC Tel: 917.447.7855 387 9th Street, 1st. Floor Brooklyn, Owner NY 11215 Tel: 917.447.7855 Anita and Norman Sussman 195A 6th Avenue Owner Brooklyn, NY 11217 Anita and Norman Sussman 195A 6th Avenue Code Consultant Brooklyn, NY 11217 James I Anzalone, RA Anzalone Architecture, PLLC Code Consultant 332 Douglass Street #2f James I Anzalone, Brooklyn, NY 11217RA Anzalone Architecture, PLLC 332 Douglass Street #2f Brooklyn, NY 11217

1 4" 4"

3'-0" HOLD

3'-6"

E 3

HOLD

4"

EQ

E 3

E 3'-0" 1

1" 22

2'-7" 2'-7" STAIR OPENING STAIR OPENING

VERTICAL DOOR CUT-OUT PULLS FOR CABINET DOORS VERTICAL DOOR CUT-OUT PULLS FOR CABINET DOORS

VARIES - SEE VARIES INTERIOR - SEE INTERIOR DETAILS DETAILS FOR HANDLE FORHEIGHTS HANDLE HEIGHTS

VARIES - SEE VARIES INTERIOR - SEE INTERIOR DETAILS DETAILS FOR HANDLE FORHEIGHTS HANDLE HEIGHTS

112"

EQ

1 4"

1'-8" 1'-8" 1 1 11" 3 1" 1 1 " " " 2" 33" 4"3 "2 1" " 3 41'-1" 4 4 2 34" 4 2 1'-1" 4

312"

112"

1 4"

E 1

4" O.C., WELDED TO 1-1/2" X 1/4" 1/2" PAINTED THK.ØHORZ STEEL RODS AT PAINTED STEEL 4" O.C., BARS ATWELDED TOP TO X 1/4" AND1-1/2" BOTTOM THK. HORZ PAINTED STEEL HINGE FOR GATE BARS AT TOP ATTACHED AT AND BOTTOM BOTTOM & TOP 1-1/2" X 1/4" THK. HINGE PAINTED FOR GATE HORZ. ATTACHED STEEL BARSAT BOTTOM & TOP 1-1/2" X 1/4" THK. HORZ. PAINTED STEEL BARS

3'-6"

Project Summary The Sussman residence is a two-family townhouse, located in a landmarked historic district of Park Slope, Brooklyn. Phase I consists of a one-story addition at the rear of the garden level, and additional interior alterations in the existing space. Phase II is a renovation of the upper triplex apartment.

195A 6TH AV 195A 6TH AV

1" 22

4" 3" 4

BARREL BOLT LOCK; FINISH TO MATCH PAINTED STEEL BARS BARREL BOLT LOCK; FINISH TO MATCH PAINTED 1/2" Ø PAINTED STEEL RODS BARS AT STEEL

2'-107 8"

SOLID WOOD HANDRAIL W/ SOLID END CAPS, COUNTERSUNK SOLID BELOW WOOD FROM HANDRAIL THROUGH W/ 1/4" X 1 SOLID END CAPS, 1/2" PTD. STEEL, COUNTERSUNK CON'T PLATE FROM BELOW WELDED TO THROUGH 1/4" X 1 BANISTER 1/2" PTD. STEEL, SPINDLES CON'T PLATE WELDED TO BANISTER 1-1/2" X 1/4" THK. SPINDLES HORZ PAINTED STEEL BARS AT TOP AND 1-1/2" X 1/4" THK. BOTTOM HORZ PAINTED STEEL BARS AT TOP AND FLOOR FINISHED BOTTOM

3" 4

2'-107 8"

PAINTED MDF

E

E

EXISTING OUTLET STONE

EXISTING OUTLET

GENERAL NOTES: 1. SEE APPLIANCE & FIXTURE SPECS. 2. ALL CABINET DOOR JOINTS 1/8" U.O.N. 3. ALL DRAWER & DOORS SHALL HAVE "BLUM MOTION SELF CLOSE HARDWARE". GENERAL NOTES: ARE APPROXIMATE. CABINETMAKER SHALL VERIFY IN FIELD. 4. ALL DIMENSIONS 1. APPLIANCE & FIXTURE SPECS. 5. SEE ALL UPPER KITCHEN CABINETS AT GARDEN LEVEL APT. FLAT OAK VENEER U.O.N. 2. ALL ALL LOWER CABINETKITCHEN DOOR JOINTS 1/8" U.O.N. 6. CABINETS AT GARDEN LEVEL APT. STAINED WOOD U.O.N. 3. ALL ALL ELECTRICAL DRAWER & DOORS SHALL HAVE "BLUM MOTION SELF CLOSE HARDWARE". 7. RECEPTACLES SHALL BE GFI. 4. ALL ALL OUTLETS DIMENSIONS ARE APPROXIMATE. CABINETMAKER VERIFYTO IN FIELD. 8. @ WALLS OVER COUNTERS SHALL BE 6" SHALL FROM FINISH C.L. OF 5. ALL UPPER KITCHEN CABINETS AT GARDEN LEVEL APT. FLAT OAK VENEER U.O.N. RECEPTACLE. 6. SEE ALL LOWER KITCHEN CABINETS GARDEN LEVEL APT. STAINED WOOD U.O.N. 9. A504 FOR DRAWER & DOORAT PULL DESIGN. 7. ALL SHALL GFI.TRIPLEX KITCHEN DRAWER HEIGHTS. 10. SEEELECTRICAL ENLARGED RECEPTACLES DETAILS ON A510/ A511BE FOR 8. ALL OUTLETS @ WALLS OVER COUNTERS SHALL BE 6" FROM FINISH TO C.L. OF RECEPTACLE. 9. SEE A504 FOR DRAWER & DOOR PULL DESIGN. 10. SEE ENLARGED DETAILS ON A510/ A511 FOR TRIPLEX KITCHEN DRAWER HEIGHTS.

A-504 A-504


P 2

1ST FLR: PROPOSED PLAN

First Floor P 2

1ST FLR: PROPOSED PLAN

Basement P 1

BASEMENT: PROPOSED PLAN

P 1

BASEMENT: PROPOSED PLAN

NORTH

08

NORTH


St. David’s school | NEW YORK, NY

Project Summary Saint David’s School is a 400-student independent school for boys spread across three historic townhouses on New York’s Upper East Side. Over the past forty years, as the campus has grown to keep pace with enrollment and its changing curriculum, PBDW has designed spaces for every aspect of the school’s programming. PROJECT contribution Renderings: Main renderer for project. All renderings on page were produced by me. Spatial Design: Entry lobby, Music classrooms, library, dining areas, gym facilities, offices BIM model building & maintenance: Exterior Facade work, building interiors, custom family building, and general model building and maintenance. Platt Byard Dovell White

Architects, LLP 20 West 22nd Street New York, NY 10010 212.691.2440 212.633.0144 fax www.pbdw.com

Structural Engineer Annastos Engineering Associates 240 West 35th Street New York, NY 10001 212.714.0993 212.714.0997 fax

Rodkin Cardinal Consulting Engineers, P.C. MEP Engineers 214 West 29th Street New York, New York 10001 212.239.1892 212.239.6412 fax

William Vitacco Associates Ltd. Building Department Consultant 299 Broadway, Fifth Floor New York, New York 10007 212.791.4578 212.513.0637 fax

2

SOUTH EAST AXONOMETRIC

09

NOT FOR CONSTRUCTION


Pla

Arch

1

2

3

1

4

4A

20 West New Yor 212.691. 212.633. www.pbd

5

A-202

A-300

1

Structu 14

BACKSTAGE 230A

MECH 230C

14

Annasto 240 Wes New Yor 212.714. 212.714.

4

A

STORAGE 230B

6

Rodkin

9

MEP Eng 214 Wes New Yor 212.239. 212.239.

STAGE

1 A-303

18

7

William

Building 299 Broa New Yor 212.791. 212.513.

5

AUDITORIUM 230

11

9

11

17

16

B

20

2

CHAPEL 202

6 1

A-201

1

A-203

HUME SOUTH 204

4

8 10

10

VESTIBULE 202B

VESTIBULE 202A

6 13' - 11" 13' - 11"

6

13

TYP.

3

TOILET 227

DN

STAIR B

CLOSET 220D

TOILET 228

STAIR A

UP

STORAGE 220C

UP

DN

DN

DN

LIGHTWELL

19

TYP.

C

STAIR C

PRE-FUNCTION / SAFE AREA 220

1 A-301 21

UP

STOR. 25A

TOILET 231N

TOILET 231O

UP

ELEV B

TOILET 12I

ELEV A

UP ELEV. #1

STAIR 1 2

A-201

PRACTICE 222

ELEV. #2

STORAGE 225

1

DN

MUSIC I 221

MUSIC II 226

12

1

15

CORRIDOR 220B

1

TYP.

FIRST GRADE CLASSROOM 205

FIRST GRADE CLASSROOM 203

FIRST GRADE CLASSROOM 201

1

A-302

ELEV. LOBBY 220A

10' - 0"

TEL. CL. 223A

11

21

PRACTICE 223

1

PRACTICE 224

1

04/15/2 Date:

11

TYP.

1

Projec

12

A-200

12-22 New 1012 BUILDING #22

BUILDING #20

BUILDING #18

BUILDING #16

BUILDING #14

Sheet

BUILDING #12

4/15/2014 5:40:35 PM

SEC KEYNOTES (VARY BY PAGE) KEY NOTE 1 ACOUSTIC TREATMENT ON WALLS & CEILINGS 2 NEW WOOD PANEL WALLS (UP TO 8'-0" HIGH) & CEILING AT CHAPEL 3 NEW STEEL COLUMNS - SEE STRUCTURAL DRAWINGS, TYP. 4 BRICK OVER 2-HOUR RATED CMU BACKUP 5 BRICK OVER CMU BACKUP 6 2-HR RATED TGP GLAZING ASSEMBLY 7 MOVEABLE WOOD STAGE 8 CUSTOM WOOD PANELING 9 OPERABLE PANEL 10 200 SEAT (3-BAY) ELECTRICALLY OPERATED RETRACTABLE SEATING SYSTEM

LEGEND: KEY NOTE 17 REMOVE, PROTECT & REINSTALL STAINED GLASS PANELS IN BAY WINDOWS 18 NEW THEATER LIGHTING & SOUND SYSTEM 19 WOOD STAIR W/ GLASS GUARDRAIL & PAINTED METAL HANDRAIL 20 NEW CUSTOM MILLWORK PEWS AND ALTAR 21 NEW PAINTED ALUMINUM (WOOD ON FIRST 1 1 2 3 FLOOR ONLY) WINDOWS TO REPLACE & MATCH A-300 EXISTING THROUGHOUT BUILDINGS 18-22

KEY NOTE 11 REPAIR & PATCH EXTERIOR WALL AT REMOVED FIRE ESCAPES TO MATCH ADJACENT SURFACES. 12 NEW DOOR AND FRAME 13 NEW BRICK INFILL TO MATCH EXISTING ADJACENT MASONRY 14 PAINTED ALUMINUM STANDING SEAM PANELS OVER CMU BACKUP 15 EXISTING WINDOW / DOOR OPENING TO BE FILLED IN WITH DRYWALL 16 NEW COLORED GLASS PANELS IN EXISTING 75.00 WINDOW FRAMES

SHEET NOTES: EXISTING TO REMAIN NEW CONSTRUCTION

ROOM #

4

4A

1.

COORDINATE ALL INFORMATION ON THIS DRAWING WITH STRUCTURAL AND MEP DRAWINGS

2.

VERIFY ALL EXISTING CONDITIONS IN FIELD INCLUDING NEIGHBORING PROPERTIES AFFECTED BY CONSTRUCTION WORK

3.

REFER TO DOB LIFE SAFETY DRAWINGS FOR WALL RATINGS

4.

ALL LOT LINE WALLS ARE TO HAVE A 2HR-RATED ASSEMBLY

ROOM WITH MINIMAL RENOVATION WORK 1-HR FIRE RATED WALL

5

2-HR FIRE RATED WALL

A-202

3-HR FIRE RATED WALL 1

65.55

16

73.28

6

6

4

LOT 54 10

CL. 129B

BUSINESS OFFICE 126

11

TOILET 129A

Building 299 Broa New Yor 212.791. 212.513.

11

DN

14

20

PUBLICATIONS DIRECTOR 130B

AFTER SCHOOL PROGRAM 127 3

CORRIDOR 120F

6

1

A-201

MEP Eng 214 Wes New Yor 212.239. 212.239.

PLAY YARD

COPIER

DEVELOPMENT OFFICE 130 10

B

Rodkin

24 DN

William 10

DEVELOPMENT DIRECTOR 130A LOT 55

Check

Check

Structu

25

1

PRE-FIRST CLASSROOM 129

CL. 126C

HUMAN RESOURCES 126B

1 A-303

10586

20Scale West New Yor= 1/8" 212.691. Sheet 212.633. www.pbd

Annasto 240 Wes New Yor 212.714. 212.714.

5

A BUSINESS DIRECTOR 126A

Projec

Drawn Pla

Autho Arch

KINDERGARTEN CLASSROOM 106

KINDERGARTEN CLASSROOM 104

KINDERGARTEN CLASSROOM 102

1

A-203

NURSE'S OFFICE 122

TOILET 122A

100'-8 1/2"

23 4

LOT 56

TOILET 125

CLOSET 122B

6

DN

CONFERENCE ROOM 123

LOT 57

1

UP

DN DN

14

17

14

ELEV. #3

CORR. 110C

LIGHTWELL LIGHTWELL

STAIR B

C 21

22

STOR. 105B

0' - 0" 19 ELEV. #1 A-201

10

UP

15

DN

EXISTING RETAIL

18

8 DN NEW FLOOR TO ALIGN WITH EXISTING RETAIL ELEVATION

-5' - 1 1/2"

CL 103B

UP

UP

ELEV B

LIGHT WELL

STAIR A

ELEV A

INTERVIEW RM 101A

CORR. 110

LOBBY 120

ELEV. #2

STAIR 1

2

TOILET 103C

DN

CORR. 110A

2

DN

1 A-302

CLOSET 105A

CORR. 110B

ADMISSIONS ASSISTANT 124

-4' - 8"

HEAD OF L.S. 105

DN

ADMISSIONS OFFICE 103

L.S. ASST. 103A

DN

PARLOR 101

-2' - 10 1/4"

TEL. CL. 121A

COATS 120C

VESTIBULE 120A

4'-5"

18

3'-1"

DN

TOILET 102A

STORAGE 102B

TOILET 106A

STAIR C

STAIR D

A-301

DN 11 DN

7 12

13

1

26 TYP.

9

11

04/15/2 Date:

12

12

Projec

A-200

12-22 New 1012 BUILDING #22

BUILDING #20

BUILDING #18

BUILDING #16

BUILDING #14

Sheet

BUILDING #12

FIR

4/15/2014 5:40:31 PM

213.83

KEYNOTES (VARY BY PAGE) KEY NOTE 1 NEW EXTERIOR LIMESTONE PLATFORM AND STAIRS WITH PAINTED METAL RAILINGS 2 NEW 3-STOP / 3-DOOR CUSTOM GLASS ENCLOSURE HC LIFT 3 NEW STEEL COLUMNS - SEE STRUCTURAL DRAWINGS, TYP. 4 BRICK OVER 2-HOUR RATED CMU BACKUP 5 BRICK OVER CMU BACKUP 6 2-HR RATED TGP GLAZING ASSEMBLY 7 NEW WOOD PANEL AND GLASS ENTRANCE DOORS, TRANSOMS & SURROUND 8 NEW GLASS ENTRY VESTIBULE & DOORS

LEGEND: KEY NOTE 9 NEW LIMESTONE FRONT STOOP, STAIRS & CHEEK WALLS. STOOP RAISED 12" ABOVE EXISTING. NEW RAILINGS 10 18" HIGH CLERESTORY TEMPERED LAMINATE GLASS INTERIOR WINDOWS 11 REPAIR & PATCH EXTERIOR WALL AT REMOVED FIRE ESCAPES TO MATCH ADJACENT SURFACES. 12 NEW EXTERIOR DOOR AND FRAME TO MATCH EXISTING 13 NEW DOOR AND FRAME 14 CUSTOM MILLWORK BASE CABINETS & COUNTERTOPS

KEY NOTE 15 NEW WOOD & GLASS PANEL BUILT-IN RECEPTION DESK 16 PAINTED ALUMINUM STANDING SEAM PANELS OVER CMU BACKUP 17 CUSTOM WOOD COLUMN COVER WITH WOOD BASE 18 PRECAST TERRAZZO TILE FLOORING IN LOBBY & VESTIBULE 19 8'-0" HIGH WOOD PANELLED WALL BEHIND RECEPTION DESK 20 NEW COUNTERTOPS, UPPER & LOWER CABINETS, WITH PANTRY, SINK, REFRIGERATOR, OVEN & STOVETOP

KEY NOTE 21 DEMO & PATCH EXISTING CMU WALL TO ACCOMODATE NEW COLUMN 22 NEW HYDRAULIC ELEVATOR IN EXISTING SHAFT BETWEEN SC, B, & 1ST FL 23 NEW RUBBER TREADS & RISERS IN EXISTING STAIR TO REMAIN 24 NEW RESILIENT PLAY SURFACE - 2 1/4" THICK SOFTILE PAVERS IN 3 COLORS 25 NEW CUSTOM WOOD PANEL 7'-0" HIGH LANDSCAPING FENCE 26 NEW PAINTED ALUMINUM (WOOD ON FIRST FLOOR ONLY) WINDOWS TO REPLACE & MATCH EXISTING THROUGHOUT BUILDINGS 18-22

SHEET NOTES: EXISTING TO REMAIN NEW CONSTRUCTION

ROOM #

10

1.

COORDINATE ALL INFORMATION ON THIS DRAWING WITH STRUCTURAL AND MEP DRAWINGS

2.

VERIFY ALL EXISTING CONDITIONS IN FIELD INCLUDING NEIGHBORING PROPERTIES AFFECTED BY CONSTRUCTION WORK

3.

REFER TO DOB LIFE SAFETY DRAWINGS FOR WALL RATINGS

4.

ALL LOT LINE WALLS ARE TO HAVE A 2HR-RATED ASSEMBLY

ROOM WITH MINIMAL RENOVATION WORK 1-HR FIRE RATED WALL 2-HR FIRE RATED WALL 3-HR FIRE RATED WALL

Projec

10586

Drawn Autho

Check

Check

Scale

1/8" =

Sheet


MASSING BREAKDOWN

new orleans jazz music library | new orleans, la NOTES

CONNECTORS

RESTS

21,000sf

5,800sf

3,200sf

VIEW

In the heart of Treme exists two disparaged communities; although exchanges between both groups are rare, they share the common thread of residing near the Interstate 10 and experiencing it on a daily basis. The homeless population that congregates in Treme primarily seeks PROGRAM BREAKDOWN refuge underneath this infrastructural work, while the residents ofOFTreme rarely utilizes the highway outside of its typical usage. The moments COMMUNAL MOMENTS INTERACTION the community of Treme appears most unified are during celebratory communal musical exchanges, which often include jazz music. Outdoor theater

library

library circulation amenities Entrance

theater

home

Housing

Dining

Transitional

Dance Hall

9’

Counsiling

Temporary Housing

home

The program for this site is a cyclically supportive combination of a jazz music library and transitional housing for current and formally homeless individuals. These two programs function under the umbrella of a non-profit organization that provides facilitated work opportunities for transitional housing residents, through the program of the New Orleans Music Library. The library is a public entity that unites the residents of the site with the rest of Treme’s population, with the goal of lessening the negative stigma associated with homelessness. library Entrance

Vacant Lot Private Housing Proposal

Outdoor Communal Site Spaces

Outdoor Connection Seating

VIEW

E

EXTE

SECTI

11


3,200sf

RESTS 5,800sf

CONNECTORS

NOTES

21,000sf

12


light receiving plaster mold | New orleans, la

Light Box was an eight week investigation utilizing plaster models to understand the complexities of natural light manipulations. After the creation of the models, I utilized charcoal drawings and hand drafting to portray this intensive process.

13


14



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.