OIL & GAS PETROLCHEMICALS POWER GENERATION INFRASTRUCTURES
COMPANY NAME: SB SETEC S.p.A. LEGAL DEFINITION: CORPORATION COMPANY CAPITAL: 2,000,000.00 EURO LEGAL OFFICE ADDRESS: VIA BENEDETTO CROCE, 11 CITTA’ GIARDINO 96010 MELILLI (SR) - ITALY BRANCH OFFICE: C.DA SPALLA 96010 MELILLI (SR) - ITALY PHONE: +39 0931 744633 FAX: +39 0931 744977 E-MAIL: commercial@sbsetec.com PUBLIC REGISTER: R.E.A. 90915 FISCAL CODE/VAT N. 01053800890
3
WHO WE ARE • •
SB SETEC is an engineering and contracting company operating since 1970 in the field of industrial plants.
• We are a private company based in Siracusa, in the middle of the most important Oil & Gas area in Italy. We have been operating in the Oil & Gas and Refining industries for more than 40 years, and have gained significant experience in the design and supply of turnkey Plants. We can manage every project phase, from the conceptual project idea up to commissioning, including EPC contracts and Turn Around Management.
Through integration of our skills, SB SETEC is today also an environmental engineering company, providing professional design services for all types of environmental interventions. SB SETEC has a permanent infrastructure, which includes engineers, planners, technical, specialists and designers. Our company is provided with well-equipped offices, meeting rooms, conference room, parking and green spaces with a total covered area of 5000 sq. mtrs.
4
www.sbsetec.com
MANPOWER CAPACITY
Project Management Engineering Staff HSQE Field Supervision Procurement & Cost Control Planning & Scheduling Environmental Engineering Administrative Staff General Services IT
7 80 3 50 8 5 5 13 5
SB SETEC’s in-house work force provides 300,000 man-hours per year, increasing to 400.000 by mobilized its permanent sub-contractors.
ENGINEERING
PROCESS
EQUIPMENT & MACHINERY
5
7
CIVIL & STRUCTURES
ELECTRICAL & INSTRUMENTATION
PIPING & STRESS ANALYSIS
12
18
38
STAFF BREAKDOWN
commercial@sbsetec.com
5
Vision and Mission support and contribute to innovation for competitive advantage
Providing excellence in engineering and construction of industrial plants and facing technological challenges in the field of Oil & Gas, Petrochemical, Chemical, Pharmaceutical, Environmental and Infrastructure. Always being one of the best General Contractor in the industrial market through a flexible approach. We guarantee an excellent quality in each step of the project development through staff organisation, interdisciplinary abilities, operational tools and internal monitoring and checks. Providing best solutions, experiences and products successfully tried and tested. Carefully protecting client’s confidentiality and proprietary information. Developing a partnership approach with the clients. SB SETEC offers innovative solutions and specific know-how thanks to the expertise and continuous training of its staff. Our extensive experience in various industry segments with many important national and international Companies has generated a high adaptability in performing with diverse client’s requests and a recognized ability to satisfy client’s needs.
6
www.sbsetec.com
Fields of Interest
Our engineering and project management teams can provide a wide variety of services ranging from conceptual and feasibility studies, up to detailed engineering, construction, installation and commissioning, covering the following business sectors:
• • • • • • • •
OIL & Gas Petrochemicals Chemicals Pharmaceuticals Energy Environmental Infrastructure Mining Power Generation
commercial@sbsetec.com
7
Organization Chart BOARD OF DIRECTOR
HSQE
RSPP
Technical Manager
Administrative Manager
Commercial Manager
Project Management
Human Resources
Process/Equipment & Machinery
Project Controller
Accounting & Services
Civil & Structures
Piping & Stress Analysis
Administration & Buying
EIA
Planning & Scheduling
Procurement & Cost Control
Environmental Division
Proposal Manager
Construction Management
turnover
8
www.sbsetec.com
Quality, Safety, Environment SB SETEC’s primary target is to achieve a high level of process effectiveness and efficiency in all project development’s phases, in order to satisfy customers’ needs and expectations. SB SETEC works in accordance with the international
CERTIFICATO N. CERTIFICATE No.
CERTIFICATO N. CERTIFICATE No.
1896/99/S
SI CERTIFICA CHE IL SISTEMA DI GESTIONE PER LA QUALITÀ DI
SB SETEC S.P.A.
nelle seguenti unità operative / in the following operational units
è conforme alla norma / is in compliance with the standard
ISO 14001:2004
BS OHSAS 18001:2007
E AL DOCUMENTO ACCREDIA RT-09
E AL DOCUMENTO SINCERT RT-12 per le seguenti attività / for the following activities
PER I SEGUENTI CAMPI DI ATTIVITÀ / FOR THE FOLLOWING FIELD(S) OF ACTIVITIES EA:34 EA:35 EA:28B
DESIGN, MANAGEMENT AND SUPERVISION OF WORKS IN THE INDUSTRIAL SECTOR. INSTALLATION OF INDUSTRIAL PLANTS. PROVISION OF TECHNICAL SERVICES ASSOCIATED WITH THE INSTALLATION OF INDUSTRIAL PLANTS.
PROGETTAZIONE, DIREZIONE E SUPERVISIONE LAVORI IN AMBITO INDUSTRIALE. INSTALLAZIONE DI IMPIANTI INDUSTRIALI. EROGAZIONE DI SERVIZI TECNICI ASSOCIATI ALL’INSTALLAZIONE DI IMPIANTI INDUSTRIALI.
La presente certificazione si intende riferita agli aspetti gestionali dell'impresa nel suo complesso ed è utilizzabile ai fini della qualificazione delle imprese di costruzione ai sensi dell'articolo 40 della legge 163 del 12 aprile 2006 e successive modificazioni e del DPR. 5 ottobre 2010 n. 207
DESIGN, MANAGEMENT AND SUPERVISION OF WORKS IN THE INDUSTRIAL SECTOR. INSTALLATION OF INDUSTRIAL PLANTS. PROVISION OF TECHNICAL SERVICES ASSOCIATED WITH THE INSTALLATION OF INDUSTRIAL PLANTS.
EA:34 EA:35 EA:28
PROGETTAZIONE, DIREZIONE E SUPERVISIONE LAVORI IN AMBITO INDUSTRIALE. INSTALLAZIONE DI IMPIANTI INDUSTRIALI. EROGAZIONE DI SERVIZI TECNICI ASSOCIATI ALL’INSTALLAZIONE DI IMPIANTI INDUSTRIALI.
Per informazioni sulla validità del certificato, visitare il sito www.rina.org For information concerning validity of the certificate, you can visit the site www.rina.org
L'uso e la validità del presente certificato sono soggetti al rispetto del documento RINA: Regolamento per la Certificazione di Sistemi di Gestione Ambientale The use and the validity of this certificate are subject to compliance with the RINA document: Rules for the Certification of Environmental Management Systems La validità del presente certificato è subordinata a sorveglianza periodica annuale / semestrale ed al riesame completo del sistema di gestione con periodicità triennale
La validità del presente certificato è subordinata a sorveglianza periodica annuale / semestrale ed al riesame completo del sistema di gestione con periodicità triennale The validity of this certificate is dependent on an annual / six monthly audit and on a complete review, every three years, of the management system L'uso e la validità del presente certificato sono soggetti al rispetto del documento RINA: Regolamento per la Certificazione di Sistemi di Gestione per la Qualità
CISQ è la Federazione Italiana di Organismi di Certificazione dei sistemi di gestione aziendale
Prima emissione First Issue
31.05.2012
Emissione corrente Current Issue
04.09.2013
Data scadenza Expiry Date
30.05.2015
CISQ is the Italian Federation of management system Certification Bodies
Ing. Michele Francioni (Chief Executive Officer)
RINA Services S.p.A.
Via Corsica 12 - 16128 Genova Italy
EA:34 EA:35 EA:28
Per informazioni sulla validità del certificato, visitare il sito www.rina.org For information concerning validity of the certificate, you can visit the site www.rina.org
DESIGN, MANAGEMENT AND SUPERVISION OF WORKS IN THE INDUSTRIAL SECTOR. INSTALLATION OF INDUSTRIAL PLANTS. PROVISION OF TECHNICAL SERVICES ASSOCIATED WITH THE INSTALLATION OF INDUSTRIAL PLANTS.
L’uso e la validità del presente certificato è soggetto al rispetto del documento RINA: Regolamento per la Certificazione dei Sistemi di Gestione della Sicurezza e Salute sul luogo di lavoro The use and validity of this certificate are subject to compliance with the RINA document: Rules for the Certification of Occupational Health and Safety Management Systems
The validity of this certificate is dependent on an annual / six monthly audit and on a complete review, every three years, of the management system
The use and validity of this certificate are subject to compliance with the RINA document : Rules for the certification of Quality Management Systems
RINA Services S.p.A.
È CONFORME ALLA NORMA / IS IN COMPLIANCE WITH THE STANDARD
Reference is to be made to the Quality Manual for details regarding the exemptions from the requirements of the standard
E VALUTATO SECONDO LE PRESCRIZIONI DEL REGOLAMENTO TECNICO RT-05
08.05.2015
VIA BENEDETTO CROCE, 11 96010 MELILLI (SR) ITALIA E CANTIERI OPERATIVI
Riferirsi al Manuale della Qualità per i dettagli delle esclusioni ai requisiti della norma
PER I SEGUENTI CAMPI DI ATTIVITÀ / FOR THE FOLLOWING FIELD(S) OF ACTIVITIES
Data scadenza Expiry Date
SB SETEC S.P.A. VIA BENEDETTO CROCE, 11 96010 MELILLI (SR) ITALIA
VIA BENEDETTO CROCE, 11 96010 MELILLI (SR) ITALIA E CANTIERI OPERATIVI
ISO 9001:2008
03.09.2013
It is hereby certified that the Occupational Health and Safety Management System of
NELLE SEGUENTI UNITÀ OPERATIVE / IN THE FOLLOWING OPERATIONAL UNITS
È CONFORME ALLA NORMA / IS IN COMPLIANCE WITH THE STANDARD
Emissione corrente Current Issue
OHS-1528
Si certifica che il Sistema di Gestione della Sicurezza e della Salute sul luogo di lavoro di
VIA BENEDETTO CROCE, 11 96010 MELILLI (SR) ITALIA
VIA BENEDETTO CROCE, 11 96010 MELILLI (SR) ITALIA E CANTIERI OPERATIVI
11.05.1999
CERTIFICATE No.
SB SETEC S.P.A.
For information concerning validity of the certificate, you can visit the site www.rina.org
NELLE SEGUENTI UNITÀ OPERATIVE / IN THE FOLLOWING OPERATIONAL UNITS
Prima emissione First Issue
CERTIFICATO N.
EMS-3816/S
IT IS HEREBY CERTIFIED THAT THE ENVIRONMENTAL MANAGEMENT SYSTEM OF
Per informazioni sulla validità del certificato, visitare il sito www.rina.org
VIA BENEDETTO CROCE, 11 96010 MELILLI (SR) ITALIA
Ing. Michele Francioni (Chief Executive Officer)
SB SETEC Quality System is certified for compliance by RINA :
SI CERTIFICA CHE IL SISTEMA DI GESTIONE AMBIENTALE DI
IT IS HEREBY CERTIFIED THAT THE QUALITY MANAGEMENT SYSTEM OF
PROGETTAZIONE, DIREZIONE E SUPERVISIONE LAVORI IN AMBITO INDUSTRIALE. INSTALLAZIONE DI IMPIANTI INDUSTRIALI. EROGAZIONE DI SERVIZI TECNICI ASSOCIATI ALL’INSTALLAZIONE DI IMPIANTI INDUSTRIALI.
standards UNI EN ISO 9001:2008, ISO 14001:2004 and BS OHSAS 18001:2007.
CISQ è la Federazione Italiana di Organismi di Certificazione dei sistemi di gestione aziendale
CISQ is the Italian Federation of management system Certification Bodies
Prima emissione First Issue
29.11.2012
Emissione corrente Current Issue
04.09.2013
Data scadenza Expiry Date
28.11.2015
Ing. Michele Francioni (Chief Executive Officer)
RINA Services S.p.A.
Via Corsica 12 - 16128 Genova Italy
CISQ è la Federazione Italiana di Organismi di Certificazione dei sistemi di gestione aziendale
CISQ is the Italian Federation of management system Certification Bodies
Via Corsica 12 - 16128 Genova Italy
SGQ N° 002 A SSI N° 001 G SGA N° 002 D DAP N° 001 H PRD N° 002 B PRS N° 066 C SCR N° 003 F LAB N° 0832
Membro degli Accordi di Mutuo Riconoscimento EA, IAF e ILAC Signatory of EA, IAF and ILAC Mutual Recognition Agreements
SGQ N° 002 A SSI N° 001 G SGA N° 002 D DAP N° 001 H PRD N° 002 B PRS N° 066 C SCR N° 003 F LAB N° 0832
Membro degli Accordi di Mutuo Riconoscimento EA, IAF e ILAC Signatory of EA, IAF and ILAC Mutual Recognition Agreements
SGQ N° 002 A SSI N° 001 G SGA N° 002 D DAP N° 001 H PRD N° 002 B PRS N° 066 C SCR N° 003 F LAB N° 0832
Membro degli Accordi di Mutuo Riconoscimento EA, IAF e ILAC
La validità del presente certificato è subordinata a sorveglianza periodica annuale / semestrale ed al riesame completo del sistema di gestione con periodicità triennale The validity of this certificate is dependent on an annual / six monthly audit and on a complete review, every three years, of the management system
Signatory of EA, IAF and ILAC Mutual Recognition Agreements
The RINA certification covers: • The design, management and work supervision in the industrial sector. • Installation of industrial plants. • Provision of technical services related to the installation of industrial plants. • Remediation of Contaminated Sites and Environmental Technical Services.
ENVIRONMENTAL LICENCES SB SETEC is registered in the list of the Environmental Management Companies (under Legislative Decree 152/2006)
commercial@sbsetec.com
9
services Industrial Plants Engineering SB SETEC performs engineering, supervision and EPC (Engineering - Procurement - Construction) services, adopting the best available technologies in compliance with Health Safety and Environmental regulations.
Engineering • • • • •
Technical and Economic Feasibility Studies Process Engineering Design Front End Engineering Design Basic Engineering Design Detailed Engineering Design
Construction • • •
Site Erection and Construction Construction Management and field supervision Pre Commissioning, Commissioning and Start Up
Project financing engineering Performance optimization support
Procurement
• • • •
• •
MARITIME ENGINEERING
Vendor Selection, Purchasing, Delivery Follow-up of Vendors’ Activity
Investment Planning Studies Economic Analysis Project Implementation Support Energy Management & Cost Reduction
Maintenance services •
10
Planning and Scheduling Management
www.sbsetec.com
Environmental Engineering The increasing attention to environmental issues, involves a constant growth of the remediation market with particular reference to the recovery of existing industrial sites and brownfields. SB SETEC has developed an environmental engineering division able to provide design and study of interventions, in order to comply with laws and regulations.
environmental remediation and safety enhancement of contaminated sites: • • •
Refineries and industrial plants Fuel depots Landfills
Environmental consulting support:
Decontamination and decommissioning:
• • •
• •
• •
Environmental impact study Environmental risk analysis Detection, abatement and monitoring of industrial emissions Information management through GIS Assessment of landscape compatibility
Plant design and construction: • •
Civil and industrial water treatment Remediation of contaminated groundwater
•
Design and implementation of nodig interventions: • • • •
commercial@sbsetec.com
Survey and pre-dismantling planning Safety coordination at both design and execution stages Implementation and management of turnkey decontamination and decommissioning solutions
Mapping of piping networks and underground pipelines Rehabilitation of underground pipelines and pressure pipeline by CIPP3 technique Replacement of underground piping without digs Installation of underground pipelines, by using HDD
11
services Piping & Civil SB SETEC has carried out several projects using 3D modelling Software Main activities: • • • • • • • •
Piping layout and support Stress analysis using Caesar 2 Equipment modelling Loading Plan Pipe racks, catwalks, ladders, platforms and stairs Modelling and calculation of Provisional Turnaround Structures Finite Element Method Fitness for Service
Electrical & Instrumentation •
• • • •
• •
HV, MV and LV systems (electrical substations, plant grid and earthing) through software and in compliance with national and international rules and standards Renewable energy power plants Domotics, Automation and Energy Efficency Electric systems in explosive atmospheres (under the ATEX 2014/34/ UE directive) Study and Design of lightning protections in compliance with national and international standards, risk analysis for personnel protection through software including DEHN Risk Tool Engineering of Automatic power factor correction units Software assisted Lighting studies and design.
Our most important activities are: • Load flow study: it allows the calculation of power flows and power losses for the protection and efficiency optimisation of all components of power grids. • Short circuit protection studies • Analysis of Electrical Engine Start-up
12
www.sbsetec.com
TECHNICAL consulting SERVICES • • • • • • • • •
Technical Audits, HSE Surveys Reliability and Maintenance Mechanical Integrity - Inspections - RBI’S Marine Terminal planning, design, construction and operations Troubleshooting “Cold Eyes” Reviews of Operations and Projects Improvement plan implementation support Strategic oil planning Profit Improvement and Energy Efficing Studies
Documento:
-
Nome File:
Foglio:
Commessa:
Data:
Rif. Cliente:
1/1
Rev.
SE-4137
Cliente:
R501-R502
Progetto:
TA 2014
-
CURVA PLANNED / ACTUAL 100,0% 95,0%
6 CRITICAL LIFT:R501 ON SHELL
NO LIFTING FOR WIND
90,0% 85,0%
5 CRITICAL LIFT:R502 ON SHELL
NO LIFTING FOR WIND
80,0%
NO LIFTING FOR WIND
75,0% 70,0%
4 CRITICAL LIFT:R502 ON 1 LEV.OCTAGONAL STRUCTURE
65,0%
R502 CLOSING
R501 CLOSING
TARGET2
60,0% PNEUMATIC TEST
55,0% 50,0%
2 CRITICAL LIFT:R501 ON LOW STRUCTURE
45,0% 40,0%
3 CRITICAL LIFTING:R502 ON "MUSHROOM" STRUCTURE
35,0%
DATA DATE 10/04/2014
30,0% 25,0%
1 CRITICAL LIFT:R502 ON 2 LEV.OCTAGONAL STRUCTURE
20,0% 15,0% 10,0% 5,0% 0,0% Early
11/3 0,0%
12/3 2,3%
13/3 4,8%
14/3 7,5%
15/3 9,3%
16/3
17/3
18/3
19/3
20/3
21/3
22/3
23/3
24/3
25/3
26/3
27/3
28/3
29/3
30/3
31/3
1/4
2/4
3/4
4/4
5/4
6/4
7/4
8/4
9/4
10/4
11/4
12/4
13/4
14/4
15/4
16/4
17/4
18/4
19/4
20/4
21/4
22/4
23/4
24/4
25/4
26/4
27/4
28/4
29/4
30/4
1/5
2/5
12,0% 15,8% 17,9% 22,0% 25,6% 29,2% 31,4% 35,2% 39,0% 42,8% 46,4% 49,3% 51,1% 54,4% 58,1% 62,2% 66,6% 70,1% 73,0% 75,3% 76,3% 77,8% 80,7% 84,6% 87,0% 89,0% 89,9% 91,5% 93,3% 95,5% 96,4% 97,1% 97,7% 97,8% 98,2% 98,5% 99,1% 100,0%
Late
0,0%
0,1%
1,1%
3,0%
3,8%
4,9%
7,9%
9,7%
Actual
0,0%
1,5%
3,0%
5,5%
5,5%
6,5%
7,0%
11,0% 12,5% 15,0% 17,0% 18,0% 20,0% 21,0% 23,0% 25,5% 28,0% 29,0% 32,0% 33,0% 34,5% 36,5% 39,0% 42,0% 44,0% 45,0% 47,0% 48,5% 51,0% 52,5% 54,5%
11,4% 13,2% 15,3% 16,8% 19,3% 21,1% 23,9% 27,0% 29,7% 31,3% 34,2% 36,4% 39,4% 42,7% 47,1% 51,9% 55,4% 57,4% 60,5% 63,0% 66,8% 70,8% 74,7% 77,0% 81,0% 84,2% 87,5% 90,1% 92,2% 94,0% 94,3% 95,1% 95,5% 97,3% 100,0%
Target 2 Early
36,5% 40,0% 44,0% 49,0% 51,9% 53,9% 55,9% 58,8% 63,2% 67,1% 70,6% 73,2% 75,5% 77,9% 79,1% 80,4% 81,7% 84,9% 88,8% 91,0% 93,0% 94,0% 95,0% 95,5% 96,0% 96,5% 97,0% 97,5% 98,0% 98,5% 99,0% 100,0%
Target 2 late
36,5% 38,0% 40,0% 42,0% 44,0% 46,0% 47,5% 49,0% 51,0% 52,0% 53,7% 57,5% 60,3% 62,6% 65,0% 67,4% 70,9% 74,6% 78,7% 82,7% 86,0% 89,2% 91,0% 93,0% 94,0% 95,0% 95,5% 96,0% 96,5% 97,0% 98,0% 100,0%
T/A FCC
Elaborato prodotto da SB SETEC S.p.A. # Mod. 30.08.010 Rev. A #
Activity ID
Activity Name
Original Start Duration
Finish
TA14 ESSO
218h 12-Mar-14 13.00
22-Apr-14 22.00
R501-R502
218h 12-Mar-14 13.00
22-Apr-14 22.00
218h 12-Mar-14 13.00
22-Apr-14 22.00
218h 12-Mar-14 13.00
22-Apr-14 22.00
17h 12-Mar-14 13.00
15-Mar-14 05.00
17h 12-Mar-14 13.00
15-Mar-14 05.00
REGENERATOR R502 E REACTOR R501 R-502 SOSTITUZIONE CICLONI / TRICKLE + RIFACIMENTO PLENUM (UTILIZZO GRU 1600 TONS) F.L.G SMONTAGGIO E SOLLEVAMENTO F.L.G.
R502-10
Inizio Attività
0h 12-Mar-14 13.00
R502-30
F.L.G: Smontaggio linea vapore
2h 12-Mar-14 13.00
12-Mar-14 15.00
R502-40
F.L.G: Inserimento riferimenti pro tagli
4h 12-Mar-14 13.00
12-Mar-14 18.00
R502-50
F.L.G: Apertura passo d'uomo esterno
3h 12-Mar-14 13.00
12-Mar-14 17.00
R502-20
F.L.G: Bloccaggio supporti
4h 12-Mar-14 13.00
12-Mar-14 18.00
R502-90
F.L.G: Analisi di esplosività
1h 12-Mar-14 17.00
12-Mar-14 18.00
R502-100
F.L.G: Taglio e smontaggio a freddo
10h 12-Mar-14 18.00
13-Mar-14 04.00
R502-110
F.L.G: Imbracaggio
4h 12-Mar-14 18.00
12-Mar-14 22.00
R502-150
SOLL. 1.1÷1.3 - F.L.G: Sollevamento F.L.G. e posizionamento a piè d'opera
6h 14-Mar-14 06.00*
14-Mar-14 12.00
R502-180
F.L.G: Pulizia interna FLG
8h 14-Mar-14 12.00
14-Mar-14 21.00
R502-170
F.L.G: Cianfrinatura e CND FLG
8h 14-Mar-14 12.00
14-Mar-14 21.00
R502-220
F.L.G: Ispezione ESSO FLG
8h 14-Mar-14 21.00
15-Mar-14 05.00
17h 12-Mar-14 13.00
16-Mar-14 22.00
APERTURA E PULIZIA
R502-2020
Inserimento disco cieco 8" 300#
1h 12-Mar-14 13.00
12-Mar-14 14.00
R502-2030
Inserimento n°2 dischi ciechi 4" 300#
2h 12-Mar-14 13.00
12-Mar-14 15.00
R502-2040
Inserimento n°2 dischi ciechi 4" e 2" 150#
2h 12-Mar-14 13.00
12-Mar-14 15.00
R502-2050
Inserimento n°3 dischi ciechi 1" 300#
1h 12-Mar-14 14.00
12-Mar-14 15.00
R502-60
Apertura passi d'uomo esterni
4h 12-Mar-14 16.00
12-Mar-14 20.00
R502-120
Cooling down e ventilazione
16h 12-Mar-14 20.00
13-Mar-14 12.00
R502-190
Analisi di respirabilità
3h 14-Mar-14 12.00
14-Mar-14 15.00
R502-210
Aspirazione catalizzatore sopra griglia
16h 14-Mar-14 16.00
15-Mar-14 20.00
Remaining Level of Effort
Remaining Work
Start Constraint
Milestone
Actual Work
Critical Remaining Work
Finish Constraint
Summary
commercial@sbsetec.com
3/5
Turn Around Management
Day 1
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
PROGRAMMA DI DETTAGLIO
• • • • • • • Date
Revision
Checked
Equipment Strategy Process Master Plan Contracting Planning and Cost Estimate Time and resources Scheduling Risk Analysis with Monte Carlo Method Field Organisation
Approved
Data Date: 12-Mar-14 - Pagina 1 di 13
13
TURN KEY PROJECT • • •
• • • •
Process endorsement Planning and scheduling (Engineering and Construction) Multidisciplinary detailed engineering including equipment and machinery specifications (pipes, valves, control systems, instrumentation, etc.), all construction drawings, installation details, design and verifications (structures and stress analysis calculations) Procurement, expediting and inspection services Site erection and construction HSE Supervision Pre-Commissioning, Commissioning and Start-Up
Project Description
Year of Acquisition
Client / Location
Odour Abatement System for S109 Basin
2017
Lukoil - Impianti Isab Sud Priolo Gargallo
Crude Blending ATZ phase 2
2016
Raffineria di Milazzo S.C.p.A.
New VRU-3 Vapour Recovery Unit and PSA 1/2/3
2015
Raffineria di Milazzo S.C.p.A.
System Enhancement to Comply with the Fire Prevention Rules of the Refinery Canteen
2014
ENI - Raffineria di Gela S.p.A
Emission abatement systems of the Sarroch Refinery due to Ministerial Provisions (Joint Venture 40%)
2013
SARLUX - Sarroch Plant (CA)
Installation of two on-stream Oil Meters and emergency systems for the removal of floating hydrocarbons from cooling water Enhancement of the A Bearing Structure against Jet Fires: HUM3 plant.
2013
ENI - Raffineria di Gela S.p.A.
2013
Raffineria di Milazzo S.C.p.A.
Bundle B-2013 of Routine EPC Jobs for North Plants of Erg Power
2013
ISAB Energy
Bundle B-2013 of Routine EPC Jobs for North Plants of Erg Power
2012
Raffineria di Milazzo S.C.p.A.
New Refinery Entrance Area
2011
Raffineria di Milazzo S.C.p.A.
Enhancement of the Vacuum Unit Fire Proofing: Design and building of fireproofing of the bearing structures of the Vacuum Unit
2011
Raffineria di Milazzo S.C.p.A.
14
www.sbsetec.com
Project Description
Year of Acquisition
Client / Location
Fire protection of the Refinery Cable Trays - Step 3
2011
Raffineria di Milazzo S.C.p.A.
New V1 Tank and Fuel Gas Meter
2010
ENI - Raffineria di Gela S.p.A.
Fire protection of the Refinery Cable Raceways Step 2
2010
Raffineria di Milazzo S.C.p.A.
Process enhancement of a wastewater trickling filter and the collection of the stinking air streams to a new odour abatement unit. Installation of systems for the removal of floating oils. Fire protection of the Refinery Cable Trays
2009
ENI - Raffineria di Gela S.p.A.
2009
Raffineria di Milazzo S.C.p.A.
Fire Fighting Systems of the Topping 3, Dea 1-2 and Merox GPL Plants
2009
Raffineria di Milazzo S.C.p.A.
Covering of 3rd e 4th Castagnetti API Separators
2009
Global Industrial Services (ERG)
EPC of the new nr. 7 Loading Rack
2009
Raffineria di Milazzo S.C.p.A.
Installation of all the utilities and interconnections of the Groundwater Treatment Plant and for the Demineralised Water Unit: dumping lines, freshwater/ nitrogen/air/methane lines, power grid, valves and instrumentations.
2006
ENI - Raffineria di Gela S.p.A.
commercial@sbsetec.com
15
Hardware and software
SECTION
SOFTWARE
Civil & Structures
CDS
DESCRIPTION Structural Analysis/Calculation Calculation of piers and plinth Bulkhead/Retaining Walls Calculation Platform/Floor calculation Calculation of Bearing Walls
MasterSAP MathCAD
Process & Equipment
Analysis, verifications and structural drawing Modelling
Strucad
Carrying out, verification and reporting of engineering calculations Steel Structure Design
Tekla
Design of Steel Structures and Steel Shapes
Meridiana
Topographic Surveys
CPIWIN REI ACCIAIO
Fire proofing
Hilti Profis Anchor
Calculation and Design of anchorages
Prog Ex
Classification of Hazardous Areas
Pro Ex Dust
Classification of Hazardous Areas
Sant'Ambrogio
Static Verification of Equipment
Piping Fluid Flow
Head Losses
PRO II
Process Verification
MT
Pressure vessels mechanical design Base components mechanical design
Scheduling
AFT IMPULSE
Head Losses
EPANET
Head Losses
Microsoft Project
Plan development, resources/task assignments, progress tracking, budget management, workload analysis
Primavera P6v7 General
16
Autocad
www.sbsetec.com
SB SETEC uses the most recent hardware and software systems to offer the best client-tailored solutions. Last generation systems are used for integrated business management, communication services, scheduling, piping design, 3D modelling, calculation of stress analysis.
SECTION
SOFTWARE
Mechanical & Piping
PDS
DESCRIPTION Management of Section Database Piping Modeling Equipment Modeling Modeling of Framework
Smart Plan 3D
3D Modeling and Design
Smart Plan P&I
P&I Modeling
Microstation
3D Modeling and Design
EsaPro ISO
Isometric Drawings
Puma 5
CAESAR II
Management of Job Materials (Import / Export MTO), production Piping Specifications (Export of Specifications for PDS/EsaPRO iso), productoion of insulations/painting/track Specifications, MTO of insulations/painting/tracing materials. Stress Analisys
FastPipe
Local FEM analysis of piping and equipment
FE Pipe
Finited Elements Verification of Equipment
CadMatic
Piping 3D Modelling; Tekla/Caesar II Interface
CadWorx Pointools View
Display/measurement of point clouds
AVEVA PDMS
Management of Specification Database Equipment Modeling Piping Modeling Framework Modeling Piping Supports Modeling
Pipe Data Pro Electrical & Instrumentation Ampere Prof
commercial@sbsetec.com
Dimensional Rule for Piping Components Verification/Designing of Electrical/Wiring System
Prysmian JDC
Verification of voltage drop
Dialux
Lighting calculations
DEHN
Verification of the Protection from Lighting
SKM Power Tool PTW
Analysis of Electrical Wiring/Distribution Network
17
clients
18
www.sbsetec.com
NOTES:
commercial@sbsetec.com
19
Layout & Print: web-studio.it - 0931 1811792
SB SETEC S.p.A. Engineering & Contracting Via B. Croce, 11 | 96010 CittĂ Giardino, Melilli (SR) | Italia Tel.: +39 0931 744633 - 761456 Fax: +39 0931 744977 - 761427 commercial@sbsetec.com | www.sbsetec.com