Manatsavee Portfolio

Page 6

Risk Audit

Relevants skills

Risk audit is a part of risk management, in this case for insurance company. In my perspective assessing risk is also important aspect of urban resilience. Hence, a good understanding of preventive risk management is considering an important aspect to learn. Especially, in 2011 Thailand is affected by severe flood in south and central part of Thailand. Joining an insurance company would deem to see and learn the risk perspective of the vulnerable group and the measure of the insurer. In this job, risk prevention measures, risk assessment and actual client’s perception of risk and disaster risk was realized. The job responsibility was audit factory for fire risk according to NFPA, FM Global, Japanese, local law and the company standard

Asia IE

Over 400 premises have been inspected, the risk occupants namely, chemical warehouse/reactors, high voltage electric transforming station, solar farm, iron forge, automotive assembly, electronic components manufacture, etc. However, the information cannot be disclosed due to company’s regulation especially Japanese famous companies

Many standard and document were reviewed in order to audit and recommend safey ymeasures

The risk data, production process risk and countermeasures are collected and analyze the trend of client's counter measure to find the flaw in the approach and strengthen the preventive risk management activities including sharing the risk and countermeasure database Furthermore, numbers of national risk profile and disaster risk has been collected in numbers of countries in south and south east Asia such as Sri Lanka, India and Myanmar. Hence, the information of industrial estate, disaster risk and prevention has become a strength insight for an effect of jobs and economic impact and risk that may impact the development of a city

Sri lanka fire regulation document https://lifesecglobal.com/fire-regulations/in-sri-lanka

India industrial estate layout analysis source: https://home.jeita.or.jp/iad/pdf/2-5.pdf

Thai Industrial estate disaster risk

Interrisk Asia: 2013-2018

Most importantly, the flood management and flood respond in Thailand was realized from an overall flood and water management in Central Thailand, in addition to industrial estate flood management. A report with conclusion has been done, this is in conjunction with periodical monitoring and news letter

Industrial Estate flood risk and counter measure assessment

Building inspection according to local guideline for building safety

Multi-Naltional

4


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.