WINSTON LIEW WORK PORTFOLIO TWENTY 21
Portfolio of selected works WINSTON LIEW WORK PORTFOLIO TWENTY 21
Portfolio of selected works
Experimental + Synthesis
AS A DESIGNER I AM DRAWN TO THE IDEA OF “NEWNESS” IN ARCHITECTURE I AM FASCINATED BY THE ROLE DESIGN PLAYS IN MANIFESTING THE CULTURE OF THE TIMES
Experimental + Synthesis
BACHELOR OF SCIENCE
BACHELOR OF DSESIGN IN ARCHITECTURE
MASTERS OF ARCHITECTURE
University of Melbourne, major in Physiology studied Psychoolgy, Pathology, Neuroscience, Biology , Anatony etcc
University of Sydney Undertaking
University of Sydney major in Physiology studied Psychoolgy, Pathology, Neuroscience, Biology , Anatony etcc
2012
+61 438 993 826 1271 Botany Rd, Mascot winston.liew1@gmail.com ABOUT ME:
2016
2013
Procificency in Photoshop Awarded from RMIT University (2019) Completed a 4 weekend course to learn about Adobe Photoshop Recipient of the Vice Chancellor’s Travelling Scholarship Awarded from Sydney University (2020) Awarded for my exchange semester to Switzerland to study Architecture
Procificency in Revit
2020
2017
2019
2021 - present
Internship Terry Nott Architects
Internship Sydney Metro
Graduate of Architecture Bureau SRH
Worked on a couple of residential projects in Fitzroy, Melbourne. Using AutoCAD to produce section drawings and plans.
Joined the Barangaroo Metro station team and shadowing architects in their oversight over the drawings and documentation of the station.
Worked on several projects ranging from residential, to apartment complexes, to health and industrial buildings.
Tsinghua University
Ecole Polytechnique Federale de Lausanne
Bachelor exchange semester to China. Undertook an digital and urban studio along with history and theory subjects and Chinese language.
Master exchange semester to Switzerland. Undertook an urban design studio, along with history and theory subjects.
Illustrator InDesign
Photoshop
Grasshopper
Revit
Rhino3D
ArchiCAD
AutoCAD
Unreal Engine
Software skills
Awarded from RMIT University (2018) Completed a 4 weekend course to learn about Revit
2018
2015
Awards + Certificates
Great design is achieved when the thinking goes from “why” to “why not”. I believe design is the problem solving tool used to improve and enrich our environment. I have found myself drawn to design my whole life but it has taken me more than a decade to piece it to together and come to this realisation. Throughout my education, I have been drawn to various disciplines ranging from languages, maths, philosophy, psychology and design. What others see in my seemingly haphazard educational background, I see as my strength. I believe design is seeing the bigger picture and drawing from many bodies of knowledge. My design career thus far has illustrated this. This portfolio is an eclectic arrangement of projects that I have completed in the past. It is as diverse as my interests. However, in all of the projects, I have sought out the underlying problems and developed holistic solutions to broach these issues. Turning problems to opportunities.
2011
2014
Timeline of education and work experience
Winston Liew
C O N T 5.
1.
The Sydney Uni Grad Show 2018
Being.LAB
3. Hope Pavilion
T E N T S
2. Tank Stream
4. Salisbury House
1. USYD GRAD SHOW 2018 Project Type
USYD Grad Show 2018
Involvement Year of Completion Unit Co-ordinator
Group Work
Semester 2, 2018
Prof. Michael Tawa
The Grad Show 2018 exhibits final year works from the undergraduate and postgraduate degrees. Situated in the University of Sydney architecture building, the exhibition showcases the work in the theme of “fabric”. As the design team leader, I participated in all stages including the conceptualisation, the detailing and iteration and finally the construction and assemblage of the design.
The Tin Sheds Gallery Exhibition Display of the Master graduation studio works 2018
section details of installations
1010 75 300
75 1025
300 600 1200
2075
2730
b
2730
a
30 350
450 200
750
c
1300
c 600
300
300
d 2075
2700
1200
2075
1200
2730 30
30
490
350
350
950
a
450
450
750
750
300
e
480
1040
75
d
75
b
1500
1700 300
e
660
300 915
480
e
300
440
440
300
f
f
1500 2730
2075
2700
1200
950 30
N
350
900
450
1M 750
700
p蓝lan of exhibition
5M
CONSTRUCTION DETAILING 1. 2mm THICK STEEL WIRE ROPE
2mm THICK STEEL WIRE ROPE
COPPER FERRULE TO HELP CREATE LOOP
COPPER FERRULE TO HELP CREATE LOOP
26mm THICK WOODEN DOWEL 500mm LONG 26mm THICK WOODEN DOWEL 500mm LONG
2.
3.
4.
5.
2. TANK STREAM RESEVOIR Project Type
Competition entry
Involvement
Year of Completion Teammates
Group Work 2020 Dec - Feb 2021
Jonathan Tong, Sean Edirisinghe
In a short space of time, the identity of the city has come into question. COVID-19 has prompted an exodus from the city. The economic engine of Sydney’s CBD has grinded to a halt. Hailing an irrevocable shift in our way of living. However, within the next 50-100 years, the city will undergo even greater transformations. By 2100, air temperature rises to 4.8% above the global average. Leading to more bushfires and pollution. There is an immediate need for the city to transition into a more habitable and self-sustaining model. A model that fosters Nature rather than supress it. The “Tank Stream Resevoir” is an oasis - a sanctuary amidst the chaos of the city. The project pays homage to the Tank Stream - a heritage infrastructure lying underneath the city. The proposal is set in 2100 when the GPO (like the rest of the CBD) are artifacts of a civilisation. Its function therefore retrofitted to be a marker of the oasis of the tank stream resevoir.
The Tank Stream Resevoir (circa 2100) Entry into the Brian Patrick Keirnan prize 2020
Site Plan of Sydney
Heritage of Tank Stream Tank Stream was a fresh water souce for First Nation Peoples, precolonisation. The stream then was converted to a sewer and then finally a storm-water drain. It has largely been forgotton in modern times. The stream spans upsteam from Circular Quay to Hyde park - wherein a reservoir once existed.
N
60M
Colony was in drought. Water tanks were carved out of the sandstone Animals were not allowed to graze within a 15m distance from the stream
Tank stream was disallowed for drinking by Govenor Brisbane
City Council given charge of tank
1790
1791
Enclosed with a fence to prevent tresspass and livestock entering
1795
1810
Cut off of drains to reduce polluted stormwater
1832
Tank stream converted to sewer system
1826
1842
Construction of
1850 Circular Quay begins
Tank stream becomes a sewage
1857 Tank Stream is drained
1860 and converted to
storm water catchment
Timeline of Tank Stream
-50
100 Current policies (2.7 - 3.1 degrees) 50
Pledges & Targets (2.3 - 2.6 degrees) Optimistic net zero targets (2.1 degrees)
0
2 deg consistent (1.6 - 1.7 degrees)
2090
-5
Depth in meters
2M Section Detail of the roof structure
4M Lonngdatudinal Section
2100
-15
2090
MAY
2080
APRIL
JUNE
AUGUST
MARCH
JULY
FEBRUARY
JANUARY
1810
Cut off of drains to reduce polluted stormwater
-20
Steady state temperature of ground
-25 Tank stream was disallowed for -30 drinking by Govenor Brisbane
1826
10
15
1832
20 Tank stream converted to sewer system
1842
Construction of
-20
Steady state temperature of ground
Tank stream becomes a sewage
1857 Tank Stream is drained
1860 and converted to 15
20
25
Temperature in degrees celcius
30
25
Temperature in degrees celcius
1850 Circular Quay begins
10
Curved in-situ concrete flooring with steel rebars
2070
1795
-15
-30
Concrete piers reaching down to solid foundation
Enclosed with a fence to prevent tresspass and livestock entering
-10
-25
1200 mm deep steel trusses
2060
-10
City Council given charge of tank
depth of MCCP
Concrete panel formwork
1791
2050
MAY
2080
APRIL
2070
JUNE
2060
AUGUST
2050
JULY
2040
MARCH
0
2030
FEBRUARY
2020
JANUARY
2010
NOVMEBER
2000
DECEMBER
1990
In-situ concrete with steel rebars
1790
2040
depth of MCCP
Baseline (4.1 - 4.8 degrees)
-50
N Ground Plan
2030
150
1.5 deg consistent (1.3 degrees)
N Underground Plan
Animals were not allowed to graze within a 15m distance from the stream -5
Depth in meters
Global greenhouse gas emissions GtCO2e / year
Warming projected by 2100
8M
2020
0
200
8M
2010
Colony was in drought. Water tanks were carved out of the sandstone
NOVMEBER
Emissions and expected warming based on pledges and current policies
2000
DECEMBER
1990
2100 WARMING PROJECTIONS
storm water catchment
30
3. HOPE PAVILION Project Type
Sustainable Masters Studio
Involvement Year of Completion Unit Co-ordinator
Group Work
Semester 1, 2019
Dr. Arianna Brambilla
The studio brief is centered around the Dubai Expo 2020 an event that is decennial. In 2020, the aim is to showcase advances in sustainability and inspire hope and positivity concerning the future. The “Hope Pavilion” is a space that people can reflect and cast a wish upward to a dynamic ceiling of floating paper wishes. The pavilion is designed to address the bleakness surrounding climate change and sustainability. The pavilion is an architectural vehicle for visitors to reflect about the future and to showcase the solidarity of the global community in an architectural performance of space.
Interior render of the Hope Pavilion for Dubai 2020 World Expo Sustainable Masters studio 2019
IT WAS THE FIRST EXPO I SAW EVER. A DAY I CAN’T FORGET
the sun was setting as i approached the pavilion. IT WAS SEEMED DIFFERENT FROM THE OTHER PAVILIONS I VISITED THAT DAY
THE PAVILION MADE ME REFLECT. I STARTED THINKING ABOUT WHAT I WANTED MY FUTURE TO BE LIKE...
AS I ENTERED I SAW thousands upon thousands of wishes floating overhead. a sea of wishes SWIRLING ABOVE ME...
WHEN I DECIDED UPON IT. I HELD IT SOFTLY IN THE PALM OF MY HAND.
and up....
TWIRLING UP...
IT TWIRLED UP TOWARDS THE SKY...
and like that...
AND THEN I LET IT FLY UP
4. SALISBURY HOUSE Project Type
Involvement Year of Completion
DEVELOPMENT APPLICATION
Architecture Firm
L CONSTRUCTION TO COMPLY AT MINIMUM W/ BCA CLAUSES & AUSTRALIAN STANDARDS
AUSE B 1.4 MATERIAL & FORMS CONSTRUCTIONS PEC. C1.1 FIRE RESISTING CONSTRUCTION PEC. C1.10 FIRE HAZARD PROPERTIES PEC. C.11 PERFORMANCE OF EXTERNAL WALLS IN A FIRE AUSE C2.6 VERTICAL SEPARATION OF OPENINGS IN EXTERNAL ALL AUSE C2.12 SPEARATION OF EQUIPMENT AUSE C2.13 ELECTRICITY SUPPLY SYSYEM AUSE C.3 ACCEPTABLE METHODS OF PROTECTION (OF OPENINGS) AUSE C3.8 OPENING IN FIRE ISOLATED EXITS AUSE C3.15 OPENING FOR SERVICE INSTALLATIONS AUSE D1.10 DISCHARGE FROM EXITS AUSE D2.7 INSTALLATIONS IN EXITS AND PATHS OF TRAVEL AUSE D2.13 GOINGS AND RISERS AUSE D2.14 LANDINGS AUSE D2.15 THRESHOLDS AUSE D2.16 BALUSTRADES
CLAUSE D2.17 HANDRAILS CLAUSE D2.21 OPERATION OF LATCH CLAUSE D2.23 SIGNS ON DOORS CLAUSE D3.2 GENERAL BUILDING ACCESS REQUIREMENTS CLAUSE D3.3 PARTS OF BUILDING TO BE ACCESSIBLE CLAUSE D3.6 IDENT. OF ACCESSIBLE FACIL/SERV/FEATURES CLAUSE D3.8 TACTILE INDICATORS CLAUSE F1.7 WATERPROOFING OF WET AREAS CLAUSE F1.9/F1.10 DAMP PROOFING CLAUSE 2.5 CONSTRUCTION OF SANITARY COMPARTMENTS PART F4 LIGHTING AND VENTILATION CLAUSE F5.4 SOUND INSULATION OF FLOORS CLAUSE F5.5 SOUND INSULATION OF WALLS CLAUSE F5.6 SOUND INSULATION OF SERVICES CLAUSE F5.7 SOUND INSULATION OF PUMPS
ARTIFICIAL LIGHTING: TO COMPLY WITH BCA PART CLAUSEF4.4 & AS1680 BALUSTRADE HEIGHTS: TO COMPLY WITH BCA CLAUSE D2.16 DRAINAGE GUTTERS & DOWNPIPES: TO COMPLY WITH AS/NZS 3500 3.2 ENERGY EFFICIENCYGLAZING: TO COMPLY WITH J2 OF BCA FIRE SERVICES: TO COMPLY WITH SECTION E OF BCA HOT WATER: SYSTEMS TO COMPLY WITH PART J7 OF BCA MASONRY: TO COMPLY WITH AS3700 MECH/ELEC/HYDRAULIC: BCA CLAUSE C3.15 & AS1530 4-2005 MECHANICAL AIRCONDITIONING: TO COMPLY WITH PART J5 OF BCA MECHANICAL EXHANUST VENTILATION: TO COMPLY WITH AS1668 & AS68.2 SMOKE ALARMS: TO COMPLY WITH BCA PART CLAUSE & SPEC E2.2 & AS3786 PENETRATIONS: THROUGH FIRE RATED CONSTRUCTION FOR MECH/ELEC/ HYDRAULIC PENETRATIONS TO COMPLY WITH BCA CLAUSE C3.15 & AS1530 4-2005 SOUND TRANSMISSION: TO COMPLY WITH PART5 OF BCA STAIR CONSTRUCTION: TO COMPLY WITH BCA CLAUSE D2.13 STAIR CONSTRUCTION: TO COMPLY WITH BCA CLAUSE D2.13 WATERPROOFING OF WET AREAS: TO COMPLY WITH AS3740
Render of front facade of Salisbury House Bureau SRH 2021
BASIX COMMITMENTS (ALL OTHER BASIX COMMITMENTS AS PER BASIX CERTIFICATE AND STAMPED PLANS) WATER OPTIONS SHOWERHEADS: TOILETS: KITCHEN TAPS: BATHROOM TAPS: RAIN WATER TANK: POOL/SPA: COLLECT RUN OFF AREA: LANDSCAPED AREA TO IRRIGATE: ENERGY OPTIONS COOLING & HEATING: VENTILATION:
WATER HEATING: ENERGY EFFICIENT LIGHTING: COOK TOPS:
3 STAR 4 STAR 6 STAR 6 STAR 4000 L 20 kL 180 sqm Unit A: 188.15 sqm, with 119.35 sqm lowwater use species; Unit B: 6.2 sqm 1-phase air conditioning, EER 2.5 & Day/ Night zoned to Living & Bed areas. Exhausts ducted & sealed; interlocked to light, to Bathroom, Laundry & Kitchen areas; manual 'on/off' in Kitchen area; no mechanical ventilation to common areas. 3.0 'Star', gas instantaneous. Compact fluorescent/LED to all rooms and common areas. Gas cook top, electric oven.
REFRIGATOR SPACE: CLOTHES DRYING LINES: ALTERNATIVE SUPPLY: POOL/SPA: LIFT: THERMAL COMFORT OPTIONS ROOF: CEILINGS: EXTERNAL WALLS: INTERNAL WALLS: FLOORS: GLAZING SPEC & TYPE:
Well ventilated. Indoor & outdoor lines installed. Photovoltaic, 0.8 kW peak. 10.74 sqm; no pool heating; timers to pump. Hydraulic. Metal deck roof + R1.0 insulation blanket to underside; concrete terrace; 'light' colour. Minimum R2.5 insulation to all ceilings with roof or terrace above; rated with sealed exhaust ventilation; not rated with down-lights. Timber-clad concrete block (190mm) + R2.0 insulation; 'dark' colour. Plasterboard on stud within dwellings Concrete floors throughout; R1.5 insulation to floors with 'Garage' below; timber, carpet & tile coverings to floors (as per plans) AFRC: Uw = 3.8 SHGC = 3.4, for stacker doors. eg. Aluminium-framed double-glazed 'Low-e' glass. AFRC: Uw = 5.6 SHGC = 0.36, for casement windows. eg. Aluminium-framed single-glazed 'Low-e' glass. AFRC: Uw = 5.6 SHGC = 0.41, for non-casement glazing. eg. Aluminium-framed single-glazed 'Low-e' glass. AFRC: Uw = 4.2 SHGC = 0.72, for skylight glazing, 100% shading eg. Aluminium-framed double-glazed clear glass with external shading louvres
NOTES: EX FFL RL
ARCHITECT: EXISTING RL OF FINISHED FLOOR LEVEL REDUCED LEVEL BOUNDARY EX BUILDING TO BE DEMOLISHED DCP SETBACK CONTROL LEP 9.5M HEIGHT CONTROL LEP 10.5M HEIGHT CONTROL FOR RFB
EX TREE TO REMOVE EX TREE TO RETAIN
PROJECT ADDRESS:
31 Salisbury Road, New South Wales Rose Bay 2029
DRAWN BY: SL
CHECKED: LH
SCALE: NTS @A1
PROPOSED TREE PROPOSED LANDSCAPE
DRAWING TITLE:
ISSUE DATE:
REVISION:
COVERPAGE
19/11/20
B
PROJECT NUMBER:
DWG NUMBER:
19-071
DA 0000
Work
Drafting and documentation
June 2021 - present
Bureau SRH
The studio brief is centered around the Dubai Expo 2020 an event that is decennial. In 2020, the aim is to showcase advances in sustainability and inspire hope and positivity concerning the future. The “Hope Pavilion” is a space that people can reflect and cast a wish upward to a dynamic ceiling of floating paper wishes. The pavilion is designed to address the bleakness surrounding climate change and sustainability. The pavilion is an architectural vehicle for visitors to reflect about the future and to showcase the solidarity of the global community in an architectural performance of space.
C
B
A
PLAN 990
990
550
990
1,850
600
1,500
600
1,850
990
700
700
990
700
990
1,410
2,226
990
9,859
PARAPET RL +11,700
1,300
3,190
1,300
ALUMINIUM TIMBER LOOKING CLADDING LIFT OVERRUN +12,000
FIXED PRIVACY SCREEN
+11,450 2 ROOF
PARAPET RL +11,700 FIXED PRIVACY SCREEN +11,450 2 ROOF
F
F
WINDOW NUMBER
+8,300 1 FIRST FLOOR
FG
W01 3,685 RL +4,300 +4,300 0 GROUND FLOOR
+8,300 1 FIRST FLOOR NORTH ELEVATION 1:100
FIXED PRIVACY SCREEN ROOF RL +11,450
ALUMINIUM TIMBER LOOKING CLADDING
PARAPET RL +11,700
1,730
5,870
7,776
+4,300 0 GROUND FLOOR
LIFT OVERRUN +12,000
+11,450 2 ROOF
+11,450 2 ROOF
1,300
6,670 ALUMINIUM LOOKING TIMBER CLADDING WINDOW OVERHANG PARAPET RL +11,700
3,150
3,150
3,150
WB29
3,190
1,300
LIFT OVERRUN RL +12,000
WB30
F
F
CONC.
+8,185
CONC.
CONC.
CONC.
CONC.
CONC.
CONC.
+8,300 1 FIRST FLOOR
CONC.
F
SALISBURY RD
4,000
4,000
1800 mm METAL FENCE
T.O.W +5,297
4,000
1800mm POOL FENCE
WB15
F
GARAGE DOOR
GARAGE DOOR
D02
CONC.
RL +4,300 +4,300 0 GROUND FLOOR
1,950
750
750
1,750
1,750
1,750
1,750
1,750
1,750
1,750
2,500
3,500
3,500
1,750
1,750
1,750
WB06
WB07
WB08
WB09
WB10
WB11
BEDROOM
BATHROOM
WB12
WB13
WB14
WB15
WB16
WB17
WB18
MASTER BEDROOM
MASTER W.I.R
BATHROOM
BATHROOM
BATHROOM
MASTER BEDROOM
HINGED
FIXED
FIXED
FIXED
HINGED
HINGED
HINGED
MASTER BEDROOM HINGED
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
2,650 990 ALUMINIUM
1,750 550 ALUMINIUM
1,750 990 ALUMINIUM
1,750 1,850 ALUMINIUM
3,500 600 TIMBER
3,500 600 TIMBER
0 0 ALUMINIUM
1,750 1,850 ALUMINIUM
1,750 990 ALUMINIUM
1,750 700 ALUMINIUM
1,750 700 ALUMINIUM
1,750 990 ALUMINIUM
1,750 700 ALUMINIUM
1,750 990 ALUMINIUM
750 1,410 ALUMINIUM
750 2,226 ALUMINIUM
1,950 990 ALUMINIUM
BEDROOM POWDER COAT
POWDER COAT
NON-POWDER COAT
NON-POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
<Undefined>
<Undefined> WEATHER SEALED YES U= 5.6, SHGC = 0.36 125mm opening as per BCA restriction
BEDROOM
<Undefined>
<Undefined> WEATHER SEALED NO U = 5.6, SHGC = U = 5.6, SHGC = 0.41 0.41
WEATHER SEALED NO
BASIX
U = 5.6, SHGC = 0.41
NOTES
-
LIVING
W01
LIVING
LIVING
DINING
DINING
<Undefined>
<Undefined>
<Undefined>
<Undefined>
WEATHER SEALED
WEATHER SEALED
WEATHER SEALED
WEATHER SEALED
YES
YES
<Undefined> WEATHER SEALED YES
<Undefined>
WEATHER SEALED
NO
<Undefined> WEATHER SEALED YES
<Undefined>
WEATHER SEALED
NO
YES
YES
U= 5.6, SHGC = 0.36
U= 5.6, SHGC = 0.36
<Undefined>
<Undefined>
U = 5.6, SHGC = 0.41
U= 5.6, SHGC = 0.36
U= 5.6, SHGC = 0.36
125mm opening as per BCA restriction
125mm opening as per BCA restriction
-
-
-
125mm opening as per BCA restriction
125mm opening as per BCA restriction
-
-
<Undefined> <Undefined> WEATHER WEATHER SEALED SEALED YES YES U= 5.6, SHGC = U= 5.6, SHGC = 0.36 0.36 125mm opening as 125mm opening as per BCA restriction per BCA restriction
HINGED
HINGED
HINGED
FIXED
FIXED
HINGED
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
WEATHER SEALED YES U= 5.6, SHGC = 0.36 125mm opening as per BCA restriction
<Undefined>
<Undefined>
<Undefined>
<Undefined>
WEATHER SEALED
WEATHER SEALED
WEATHER SEALED
WEATHER SEALED
YES
NO
NO
U= 5.6, SHGC = 0.36
U = 5.6, SHGC = 0.41
U = 5.6, SHGC = 0.41
U= 5.6, SHGC = 0.36
125mm opening as per BCA restriction
<Undefined>
-
125mm opening as per BCA restriction
YES
WINDOW SCHEDULE 1:1
CAR STACKER 550
990
CAR STACKER 1,850
W07
1,744
1,850
990
W06
700
700
990
700
5,170
990
W01
D02
METAL FENCE
GATE GROUND FLOOR RL +4,300
+4,300 0 GROUND FLOOR
GATE
±0 -1 AHD SOUTH ELEVATION 1:100 EAST ELEVATION 1:100
04
NOT FOR CONSTRUCTION
BUREAU SRH | architecture
STUDIO 3 | 2 VERONA STREET | PADDINGTON | NSW | 2021 | AUSTRALIA | ABN: 94 115 880 834 | TEL: +61 2 9380 4666 | admin@bureausrh.com
RESIDENTIAL
NOMINATED ARCHITECT: SIMON HANSON # 6739
LEGEND:
REV DATE
31 SALISBURY RD, ROSE BAY
NAME
GENERAL: THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER ARCHITECTURAL & CONSULTANT DRAWINGS & SPECIFICATIONS & WITH SUCH OTHER WRITTEN INSTRUCTIONS ISSUED DURING THE COURSE OF THE CONTRACT | NOTIFY ARCHITECT OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | MATERIALS & WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE SPECIFICATION, CURRENT SAA CODES, BUILDING REGULATIONS & OTHER STATUTORY AUTHORITIES | VERIFY ALL DIMENSIONS ON SITE AND NOTIFY ARCHITECT OF ANY DISCREPANCIES | USE FIGURED DIMENSIONS ONLY | COPYRIGHT, ALL RIGHT RESERVED | THIS DRAWING IS COPYRIGHT AND CONFIDENTIAL & MAY NOT BE REPRODUCED BY ANY PERSON WITHOUT WRITTEN PERMISSION OF THE ABOVE COMPANY & IS NOT TO BE USED IN ANY MANNER PREJUDICAL TO THE INTERESTS OF THAT COMPANY | THIS DRAWING AND ATTACHED SHEET REMAIN THE PROPERTY OF BUREAU SRH PTY LTD CAD FILES: INFORMATION IN ELECTRONIC FILES TRANSMITTED REMAIN THE INTELLECTUAL PROPERTY OF BUREAU SRH. | BUREAU SRH DO NOT GUARANTEE CAD DOCUMENTS CONTAIN COMPLETE AND ACCURATE INFORMATION. | CAD DOCUMENTS MUST BE COMPARED TO, AND READ IN CONJUNCTION WITH CURRENT HARD COPY DOCUMENTS. | BUREAU SRH ARE NOT LIABLE FOR ALTERNATIONS TO CAD FILES BY THIRD PARTIES
STAGE:
DRAWING TITLE:
CC
ELEVATIONS
PROJECT No:
21070
DRAWING No:
A3101
SCALE @ A1:
REVISION: CLIENT: DANIEL K
1:100
550
WB19
WB20
MASTER BEDROOM
LAUNDRY
1,850
1,850
RL +3,870
WB21
WB22
3,065 KITCHEN
3,064
DINING
990
WB23
WB24
LIVING
<Undefined>
700
WB25 BEDROOM
990
700
WB26
WB27
BEDROOM
BATHROOM
1,744
990
1,750
1,750
1,950
1,950
1,950
1,950
1,950 700
F
5,170
WB28
WB29
WB30
BEDROOM
BATHROOM
BATHROOM
WB31 BEDROOM
HINGED
FIXED
HINGED
HINGED
HINGED
HINGED
HINGED
HINGED
HINGED
HINGED
HINGED
FIXED
SLIDING
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
EXTERNAL
1,950 990 ALUMINIUM
1,950 550 ALUMINIUM
1,950
1,950 1,850 ALUMINIUM
1,950
1,950 990 ALUMINIUM
1,950 700 ALUMINIUM
1,950 700 ALUMINIUM
1,950 990 ALUMINIUM
1,950 700 ALUMINIUM
1,950 990 ALUMINIUM
1,750 1,744 ALUMINIUM
1,750 5,170 ALUMINIUM
POWDER COAT POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
POWDER COAT
<Undefined>
<Undefined> WEATHER SEALED YES U= 5.6, SHGC = 0.36 125mm opening as per BCA restriction
<Undefined> WEATHER SEALED YES U= 5.6, SHGC = 0.36 125mm opening as per BCA restriction
<Undefined>
<Undefined> WEATHER SEALED YES U= 5.6, SHGC = 0.36 125mm opening as per BCA restriction
<Undefined> WEATHER SEALED YES U= 5.6, SHGC = 0.36
990 CAR STACKER ALUMINIUM
<Undefined> WEATHER SEALED NO U = 5.6, SHGC = 0.41
125mm opening as per BCA restriction 01
990
1,950
1,950 990
F
-
<Undefined> WEATHER SEALED
1,850 CAR STACKER ALUMINIUM
<Undefined> WEATHER SEALED
<Undefined> WEATHER SEALED
WEATHER SEALED
YES
YES
YES
YES
U= 5.6, SHGC = 0.36
U= 5.6, SHGC = 0.36
U= 5.6, SHGC = 0.36
U= 5.6, SHGC = 0.36
125mm opening as per BCA restriction
125mm opening as per BCA restriction
125mm opening as per BCA restriction
125mm opening as per BCA restriction
WEATHER SEALED YES U= 5.6, SHGC = 0.36 125mm opening as per BCA restriction
<Undefined>
<Undefined>
WEATHER SEALED
<Undefined>
WEATHER SEALED
WEATHER SEALED
YES
NO
YES
U= 5.6, SHGC = 0.36
U = 5.6, SHGC = 0.41
U= 5.6, SHGC = 0.36
125mm opening as per BCA restriction
-
-
WINDOW SCHEDULE 1:1
SHORT SECTION 1:100
03
NB: THIS BUILDING HAS NOT BEEN DOCUMENTED AS A BIM MODEL. THE DOCUMENTS ARE STRICTLY REPRESENTATIONAL AND THEY HAVE BEEN PRODUCED SOLELY TO BE PRINTED OUT (OR CONVEYED AS PDF FORMAT) WITH THE INFORMATION CONTAINED THEREON TO BE READ OFF THE PRINTED 2D DRAWINGS (OR PDFs). THEY ARE NOT TO BE USED AS THE BASIS OF BIM-STYLE COORDINATION OR CONSTRUCTION SET-OUTS. BUREAU SRH ARE NOT LIABLE FOR THE DOCUMENTS BEING USED IN ANY MANNER EXCEPT THE MANNER DESCRIBED ABOVE, AND BUREAU SRH WILL NOT BE RESPONSIBLE FOR ANY INACCURACIES OR DISCREPANCIES WHICH RESULT FROM USING THE DOCUMENTS IN ANY OTHER WAY. IF, BY PRIOR AGREEMENT, YOU HAVE RECEIVED ELECTRONIC DRAWING FILES, THESE DOCUMENTS MUST BE COMPARED TO, AND READ IN CONJUNCTION WITH, THE LATEST ISSUE OF THE ORIGINAL HARD COPY, IN ORDER TO ENSURE THE ACCURACY OF THE INFORMATION CONTAINED AND TO FURTHER ENSURE THAT NO MODIFICATIONS HAVE BEEN MADE TO THE DOCUMENTS. THE INFORMATION CONTAINED IN THE ELECTRONIC FILES FOR THE ABOVE PROJECT HAS BEEN CREATED BY BUREAU SRH AND REMAINS THE INTELLECTUAL PROPERTY OF BUREAU SRH. WHILE BUREAU SRH HAS MADE EVERY APPROPRIATE EFFORT TO ENSURE THE ACCURACY OF THESE DOCUMENTS, IT CANNOT GUARANTEE THAT THESE DOCUMENTS CONTAIN COMPLETE AND ACCURATE INFORMATION.
F
DRAWN: WL
1
LY APPROVED: SRH CHECKED:
NB: THIS BUILDING HAS NOT BEEN DOCUMENTED AS A BIM MODEL. THE DOCUMENTS ARE STRICTLY REPRESENTATIONAL AND THEY HAVE BEEN PRODUCED SOLELY TO BE PRINTED OUT (OR CONVEYED AS PDF FORMAT) WITH THE INFORMATION CONTAINED THEREON TO BE READ OFF THE PRINTED 2D DRAWINGS (OR PDFs). THEY ARE NOT TO BE USED AS THE BASIS OF BIM-STYLE COORDINATION OR CONSTRUCTION SET-OUTS. BUREAU SRH ARE NOT LIABLE FOR THE DOCUMENTS BEING USED IN ANY MANNER EXCEPT THE MANNER DESCRIBED ABOVE, AND BUREAU SRH WILL NOT BE RESPONSIBLE FOR ANY INACCURACIES OR DISCREPANCIES WHICH RESULT FROM USING THE DOCUMENTS IN ANY OTHER WAY. IF, BY PRIOR AGREEMENT, YOU HAVE RECEIVED ELECTRONIC DRAWING FILES, THESE DOCUMENTS MUST BE COMPARED TO, AND READ IN CONJUNCTION WITH, THE LATEST ISSUE OF THE ORIGINAL HARD COPY, IN ORDER TO ENSURE THE ACCURACY OF THE INFORMATION CONTAINED AND TO FURTHER ENSURE THAT NO MODIFICATIONS HAVE BEEN MADE TO THE DOCUMENTS. THE INFORMATION CONTAINED IN THE ELECTRONIC FILES FOR THE ABOVE PROJECT HAS BEEN CREATED BY BUREAU SRH AND REMAINS THE INTELLECTUAL PROPERTY OF BUREAU SRH. WHILE BUREAU SRH HAS MADE EVERY APPROPRIATE EFFORT TO ENSURE THE ACCURACY OF THESE DOCUMENTS, IT CANNOT GUARANTEE THAT THESE DOCUMENTS CONTAIN COMPLETE AND ACCURATE INFORMATION.
NOT FOR CONSTRUCTION
BUREAU SRH | architecture
STUDIO 3 | 2 VERONA STREET | PADDINGTON | NSW | 2021 | AUSTRALIA | ABN: 94 115 880 834 | TEL: +61 2 9380 4666 | admin@bureausrh.com
RESIDENTIAL
NOMINATED ARCHITECT: SIMON HANSON # 6739
LEGEND:
REV DATE
31 SALISBURY RD, ROSE BAY
NAME
GENERAL: THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER ARCHITECTURAL & CONSULTANT DRAWINGS & SPECIFICATIONS & WITH SUCH OTHER WRITTEN INSTRUCTIONS ISSUED DURING THE COURSE OF THE CONTRACT | NOTIFY ARCHITECT OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | MATERIALS & WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE SPECIFICATION, CURRENT SAA CODES, BUILDING REGULATIONS & OTHER STATUTORY AUTHORITIES | VERIFY ALL DIMENSIONS ON SITE AND NOTIFY ARCHITECT OF ANY DISCREPANCIES | USE FIGURED DIMENSIONS ONLY | COPYRIGHT, ALL RIGHT RESERVED | THIS DRAWING IS COPYRIGHT AND CONFIDENTIAL & MAY NOT BE REPRODUCED BY ANY PERSON WITHOUT WRITTEN PERMISSION OF THE ABOVE COMPANY & IS NOT TO BE USED IN ANY MANNER PREJUDICAL TO THE INTERESTS OF THAT COMPANY | THIS DRAWING AND ATTACHED SHEET REMAIN THE PROPERTY OF BUREAU SRH PTY LTD CAD FILES: INFORMATION IN ELECTRONIC FILES TRANSMITTED REMAIN THE INTELLECTUAL PROPERTY OF BUREAU SRH. | BUREAU SRH DO NOT GUARANTEE CAD DOCUMENTS CONTAIN COMPLETE AND ACCURATE INFORMATION. | CAD DOCUMENTS MUST BE COMPARED TO, AND READ IN CONJUNCTION WITH CURRENT HARD COPY DOCUMENTS. | BUREAU SRH ARE NOT LIABLE FOR ALTERNATIONS TO CAD FILES BY THIRD PARTIES
STAGE:
DRAWING TITLE:
CC
WINDOW SCHEDULE
PROJECT No:
A8100 REVISION:
CLIENT: DANIEL K
2
3
4
5
1:1
DRAWN: WL
LY APPROVED: SRH CHECKED:
25,158 1,730
5,878
BOUNDARY
5,450
BOUNDARY
12,100
12,788
7,875
LIFT OVERRUN
FIXED PRIVACY SCREEN
PARAPET RL +11,700
+11,450 2 ROOF
PLANTER BOX
BALCONY
W01
KITCHEN & DINING
LNDRY W03
STAIRS W01
W04
MASTER BEDROOM
W01
LIFT STAIRS W01
+4,300 0 GROUND FLOOR
KITCHEN & DINING
W02
BED
W04
W04
W04
2,030
+8,300 1 FIRST FLOOR
CAR STACKER
CAR STACKER
W05
2,500
5,675
±0 -1 AHD
03
LONG SECTION 1:100
CAR STACKER
21070
DRAWING No:
SCALE @ A1:
2,000
+8,300 1 FIRST FLOOR
600
5 15/08/2021 11:30 AM / liew / Q:\DATA\Bureau SRH Pty Ltd\Bureau SRH - Documents\0000 PROJECTS\21070_31 Salisbury Road, Rose Bay_Woollahra\B - WORKING\B.00 - DRAWINGS\B.01.01 - CURRENT DRAWING FILES\21070_31 Salisbury Rd Rose Bay.pln
5,450
990
1,500
600
A
BOUNDARY
12,100
4
BOUNDARY
12,752
3
BOUNDARY
BOUNDARY
2
F
2,226
990
HINGED
SEAL
990
1
700
EXTERNAL
BEDROOM
POWDER COAT POWDER COAT
BATHROOM B
990
FIXED
LOCK
W01 C
700
EXTERNAL
W02
01
WEST ELEVATION 1:100
02
WB05
700
FIXED
GARAGE
POWDER COAT
GLAZING
POOL FENCE
RL +4,300
WB04
990
EXTERNAL
2,650 990 ALUMINIUM
BATHROOM FRAME FINISH
WB03
F
1,410
1,850
FIXED
1,950
CONC.
RAMP 1:14 RAMP 1:14
WB02
F
EXTERNAL
GARAGE
HEIGHT WIDTH FRAME
FG
F
F
+4,300 0 GROUND FLOOR
ROOF OVERHANG
4,000
T.O.W +6,100
F
2,650
WB01
ROOM
INTERNAL/EXTERNAL
CONC.
CR-01
2,000
CR-01
1,850
2,500
CR-01
1,300
990
1,950
CR-01
F
990
1,950
CR-01
ROOF OVERHANG RL +7,250
03
2,650
990
OPENING TYPE CR-01
F
PARAPET RL +11,700
+8,185
+8,300 1 FIRST FLOOR
01
3,190 F
550
3,150
3,150
F
SALISBURY RD
CONC.
6,670 ELEVATION (VIEW FROM EXTERIOR U.N.O)
1,950
+11,450 2 ROOF
6,670
BOUNDARY
FIXED PRIVACY SCREEN
LIFT OVERRUN RL +12,000
ALUMINIUM TIMBER LOOKING CLADDING
12,762
2,030
12,100
BOUNDARY
5,450
BOUNDARY
1,730
BOUNDARY
5,870
BOUNDARY
BOUNDARY
1,300 7,776
2
3
12,100
5,450
4
1,730
ENTRY BELOW
FOOTPATH BELOW
5
5,870
1 SK200
1
BOUNDARY
RAMP BELOW
RAMP BELOW
A PARAPET
3,125
PARAPET RL 11,700
2 SK200
PARAPET RL 11,700
OPEN LOUVRE ROOF LIFT OVERRUN
TREE EXISTING
ROOF FALL REFER TO STORMWATER ENGINEER DETAILS
2 SK200
B RETAINING WALL BELOW
ROOF RL 11,450
TREE EXISTING
1 SK200
NB: THIS BUILDING HAS NOT BEEN DOCUMENTED AS A BIM MODEL. THE DOCUMENTS ARE STRICTLY REPRESENTATIONAL AND THEY HAVE BEEN PRODUCED SOLELY TO BE PRINTED OUT (OR CONVEYED AS PDF FORMAT) WITH THE INFORMATION CONTAINED THEREON TO BE READ OFF THE PRINTED 2D DRAWINGS (OR PDFs). THEY ARE NOT TO BE USED AS THE BASIS OF BIM-STYLE COORDINATION OR CONSTRUCTION SET-OUTS. BUREAU SRH ARE NOT LIABLE FOR THE DOCUMENTS BEING USED IN ANY MANNER EXCEPT THE MANNER DESCRIBED ABOVE, AND BUREAU SRH WILL NOT BE RESPONSIBLE FOR ANY INACCURACIES OR DISCREPANCIES WHICH RESULT FROM USING THE DOCUMENTS IN ANY OTHER WAY. IF, BY PRIOR AGREEMENT, YOU HAVE RECEIVED ELECTRONIC DRAWING FILES, THESE DOCUMENTS MUST BE COMPARED TO, AND READ IN CONJUNCTION WITH, THE LATEST ISSUE OF THE ORIGINAL HARD COPY, IN ORDER TO ENSURE THE ACCURACY OF THE INFORMATION CONTAINED AND TO FURTHER ENSURE THAT NO MODIFICATIONS HAVE BEEN MADE TO THE DOCUMENTS. THE INFORMATION CONTAINED IN THE ELECTRONIC FILES FOR THE ABOVE PROJECT HAS BEEN CREATED BY BUREAU SRH AND REMAINS THE INTELLECTUAL PROPERTY OF BUREAU SRH. WHILE BUREAU SRH HAS MADE EVERY APPROPRIATE EFFORT TO ENSURE THE ACCURACY OF THESE DOCUMENTS, IT CANNOT GUARANTEE THAT THESE DOCUMENTS CONTAIN COMPLETE AND ACCURATE INFORMATION.
NOT FOR CONSTRUCTION
BUREAU SRH | architecture
STUDIO 3 | 2 VERONA STREET | PADDINGTON | NSW | 2021 | AUSTRALIA | ABN: 94 115 880 834 | TEL: +61 2 9380 4666 | admin@bureausrh.com
RESIDENTIAL
NOMINATED ARCHITECT: SIMON HANSON # 6739
LEGEND:
REV DATE
31 SALISBURY RD, ROSE BAY
NAME
GENERAL: THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER ARCHITECTURAL & CONSULTANT DRAWINGS & SPECIFICATIONS & WITH SUCH OTHER WRITTEN INSTRUCTIONS ISSUED DURING THE COURSE OF THE CONTRACT | NOTIFY ARCHITECT OF ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK | MATERIALS & WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE SPECIFICATION, CURRENT SAA CODES, BUILDING REGULATIONS & OTHER STATUTORY AUTHORITIES | VERIFY ALL DIMENSIONS ON SITE AND NOTIFY ARCHITECT OF ANY DISCREPANCIES | USE FIGURED DIMENSIONS ONLY | COPYRIGHT, ALL RIGHT RESERVED | THIS DRAWING IS COPYRIGHT AND CONFIDENTIAL & MAY NOT BE REPRODUCED BY ANY PERSON WITHOUT WRITTEN PERMISSION OF THE ABOVE COMPANY & IS NOT TO BE USED IN ANY MANNER PREJUDICAL TO THE INTERESTS OF THAT COMPANY | THIS DRAWING AND ATTACHED SHEET REMAIN THE PROPERTY OF BUREAU SRH PTY LTD CAD FILES: INFORMATION IN ELECTRONIC FILES TRANSMITTED REMAIN THE INTELLECTUAL PROPERTY OF BUREAU SRH. | BUREAU SRH DO NOT GUARANTEE CAD DOCUMENTS CONTAIN COMPLETE AND ACCURATE INFORMATION. | CAD DOCUMENTS MUST BE COMPARED TO, AND READ IN CONJUNCTION WITH CURRENT HARD COPY DOCUMENTS. | BUREAU SRH ARE NOT LIABLE FOR ALTERNATIONS TO CAD FILES BY THIRD PARTIES
PROJECT No:
21070
STAGE:
DRAWING TITLE:
DRAWING No:
CC
ROOF + SITE PLAN
A2101
N
SCALE @ A1:
REVISION: CLIENT: DANIEL K
1:100
DRAWN: WL
CHECKED: LY APPROVED: SRH
2
1
3
2 SK200
BBQ
5,870 1:14 RAMP
W05
PRIVATE STAIRS W04
W02 BED-2 FFL4,300 FSL4,270
D04
W05
W07 LNDRY
W07
5,675
RL 3,870
TF01
BED-3
TF01 W03
BATH
BED-1
WB07
ENS. FFL4,300 FFL4,240
RL 3,520 RL 3,460
WB08
WB09
WB10
W01
WB11
WB12
WB13
WINDOWS WB08, WB09, WB10, WB11, WB12, WB13, WB14, WB15, WB16 FACING THE BOUNDARY ARE FIXED IN METAL FRAMES. REFER TO FIRE ENGINEERING SPECS FOR DETAILS
WB14
WB15
E2 PRIVATE RESIDENTIAL LIFT - CONTROL PANEL ON THE GROUND, REFER TO LIFTSHOP SPECS FOR DETAILS
WB16
2
3
5 5,870
WALL SCHEDULE
WB20
WB19
D05
LDRY
DINING
W05
W04 PRIVATE STAIRS
W03 W04
KITCHEN
WB18
PIRVATE LIFT
W05 WIR
MASTER
WB31
1,300
WB21
W04
2 SK200
W01 - EXTERNAL AFS CLADDING WALL
BOUNDARY
W01
WB22
TF01
D04
TF01
W03 W02
W04
6,730
D04 D04
LIVING FFL8,300 FSL8,270
D05 D04
W03
TF01 W04
W03
BED-3
FFL8,300 FSL8,240 BATH
FFL8,300 FSL8,240
TF01
WB30
BALCONY FFL8,300 FSL8,185
D04
PERGOLA
FFL8,300 BATH FSL8,270 W03 D09
B
4
1,730
W01
3,125
A
5,450
1 SK200
12,100
SETOUT POINT
20mm ACRYLIC RENDER 12mm MARINE PLY TO TOP HAT FRAMING GALV. 25mm ROP HAT + 40mm CAVITY INSULATION TO SPEC 162mm AFS LOGIC WALL 28mm FURRING CHANNEL 13mm PLASTERBOARD
OUTSIDE
SALISBURY RD
1
INSIDE
FRL: ACOUSTIC: R-VALUE:
min. R1.5 INSULATION
W02 - INTERNAL STUD WALL 13mm PLASTERBOARD 64mm STEEL STUD 13mm PLASTERBOARD
OUTSIDE
INSIDE
FRL: ACOUSTIC: R-VALUE:
min. R1.5 INSULATION
W03 - WET AREA TILE WALL 13mm ACRYLIC RENDER 156mm CONCRETE 40mm CAVITY + INSULATION + CLIPS 28mm STEEL STUD 13mm PLASTERBOARD
OUTSIDE
2 SK200
INSIDE
FRL: ACOUSTIC: R-VALUE:
min. R1.5 INSULATION
W04 - 13mm ACRYLIC RENDER WALL 13mm PLASTERBOARD 64mm STEEL STUD WITH INSULATION 15mm TILE
OUTSIDE
INSIDE
FRL: ACOUSTIC: R-VALUE:
min. R1.5 INSULATION
W05 - 200mm CONCRETE WALL OUTSIDE 200 mm CONCRETE WALL
INSIDE
FRL: ACOUSTIC: R-VALUE:
min. R1.5 INSULATION
W06 - 162mm CONCRETE WALL OUTSIDE
W03
BED-2
W03
ENS.
162 mm AFS CONCRETE WALL
INSIDE
W01
FFL8,300 FSL8,270
FRL: ACOUSTIC: R-VALUE:
min. R1.5 INSULATION
W07 - INTERNAL AFS WALL OUTSIDE
WB24
WB25
WB26
WB27
WB28
WB29 INSIDE
W01
W01
FRL: ACOUSTIC: R-VALUE:
1 SK200
1,300
C
WB23
01
13 mm PLASTERBOARD 40 mm INSULATION 162 mm CONCRETE WALL 28 mm STEEL STUD 13 mm PLASTERBOARD
min. R1.5 INSULATION
WALL SCHEDULES 1:100
2 1:100 AND THEY HAVE BEEN NB: THIS BUILDING HAS NOT BEEN DOCUMENTED AS A BIM MODEL. THE DOCUMENTS AREFIRST STRICTLYFLOOR REPRESENTATIONAL PRODUCED SOLELY TO BE PRINTED OUT (OR CONVEYED AS PDF FORMAT) WITH THE INFORMATION CONTAINED THEREON TO BE READ OFF THE PRINTED 2D DRAWINGS (OR PDFs). THEY ARE NOT TO BE USED AS THE BASIS OF BIM-STYLE COORDINATION OR CONSTRUCTION SET-OUTS. BUREAU SRH ARE NOT LIABLE FOR THE DOCUMENTS BEING USED IN ANY MANNER EXCEPT THE MANNER DESCRIBED ABOVE, AND BUREAU SRH WILL NOT BE RESPONSIBLE FOR ANY INACCURACIES OR DISCREPANCIES WHICH RESULT FROM USING THE DOCUMENTS IN ANY OTHER WAY. IF, BY PRIOR AGREEMENT, YOU HAVE RECEIVED ELECTRONIC DRAWING FILES, THESE DOCUMENTS MUST BE COMPARED TO, AND READ IN CONJUNCTION WITH, THE LATEST ISSUE OF THE ORIGINAL HARD COPY, IN ORDER TO ENSURE THE ACCURACY OF THE INFORMATION CONTAINED AND TO FURTHER ENSURE THAT NO MODIFICATIONS HAVE BEEN MADE TO THE DOCUMENTS. THE INFORMATION CONTAINED IN THE ELECTRONIC FILES FOR THE ABOVE PROJECT HAS BEEN CREATED BY BUREAU SRH AND REMAINS THE INTELLECTUAL PROPERTY OF BUREAU SRH. WHILE BUREAU SRH HAS MADE EVERY APPROPRIATE EFFORT TO ENSURE THE ACCURACY OF THESE DOCUMENTS, IT CANNOT GUARANTEE THAT THESE DOCUMENTS CONTAIN COMPLETE AND ACCURATE INFORMATION.
NOT FOR CONSTRUCTION
ty Ltd\Bureau SRH - Documents\0000 PROJECTS\21070_31 Salisbury Road, Rose Bay_Woollahra\B - WORKING\B.00 - DRAWINGS\B.01.01 - CURRENT DRAWING FILES\21070_31 Salisbury Rd Rose Bay.pln
GROUND FLOOR 1:100
D06
1
WIR
FFL4,300 FSL4,270
FFL4,300 FSL4,270
C
W07 RL 3,440
FFL4,300 FFL4,240
W03
RL 3,400
W07
W04
TF01
CONC.
D04
W02
W02
DUPLO 30 CAR STACKER
D05
6,670
D04
TF01 FFL4,300 FSL4,300
2 SK200
W06
W03 STUDY
W02 D04
POOL
CONC.
D04
RL 4,300 FFL4,300 FSL4,185
1:40
5,675
DUPLO 30 CAR STACKER
D04
FFL4,300 FFL4,240 BATH
W02
DECK FFL4,300 FSL4,185 TD
E2 PRIVATE LIFT
1:14 RAMP
WB01
RL 3,870
LIVING RL 5,080
1:40
WB02
W04
KITCHEN
BOUNDARY
D02
WB03
GARBAGE ROOM
DINING
LAWN FFL4,300 FSL4,185
SLIDER DOOR ENTRY D08
5
1,730
TF01
D07
B
COLLAPSIBLE CLOTHES LINE
WB04
3,190
DEMOLISH EXISTING LOW WALL
W01
WB05
WB06
RL 4,190
A
5,450 COMMUNAL GATE
12,100 WINDOWS WB01, WB02, WB03, WB04, WB05 FACING THE BOUNDARY ARE FIXED IN METAL FRAMES. REFER TO FIRE ENGINEERING SPECS FOR DETAILS
4
SALISBURY RD
RETAINING WALL BELOW
1,300
PARAPET RL 11,700
1,300
PARAPET RL 11,700
D01
SKYLIGHT POOL BELOW
TREE EXISTING
D01
TREE EXISTING
C
WB17
CONC.
COMMUNAL GATE
FALL
1 SK200
F
1 SK200
F
3,064
F
3,065
FALL
D03
F
D04
F
ROOF FALL REFER TO STORMWATER ENGINEER DETAILS
D06
6,730
FALL
SALISBURY RD
ROOF F
FALL
D04
GROUND FLOOR DECK BELOW
15/08/2021 11:31 AM / liew / Q:\DATA\Bureau SRH Pty Ltd\Bureau SRH - Documents\0000 PROJECTS\21070_31 Salisbury Road, Rose Bay_Woollahra\B - WORKING\B.00 - DRAWINGS\B.01.01 - CURRENT DRAWING FILES\21070_31 Salisbury Rd Rose Bay.pln
SKYLIGHTS
TREE EXISTING
5. BEING.Lab Project Type
Graduation Masters Studio
Involvement
Year of Completion Unit Co-ordinator
Individual Work Semester 2, 2020
Dr. Paolo Stracchi
The laboratory of being acts as an antidote to the increasing alienation technology poses in the modern world and its future. The building uses virtual and augmented reality linked with the user’s mind to create virtual spaces which can foster connection with one another and with the world. The Being.LAB is a place where people visit, experience and learn about themselves. It is a place where technology is used to serve the individual and inspire growth and positive change. Shaping the future where people are more in touch with their being in the world and live more truer lives.
Render of interior of Being.LAB Graduation Studio 2020
SECTIONAL PERSPECTIVES
GROUND FLOOR
SECOND FLOOR
THIRD FLOOR